Original source · versioned page text
2503-45382 SRA - Amended response - with conditions
Attached to the e-mail 132005.638.04 SARA amended response.
2503-45382 SRA
Attachment 1—Changed conditions to be imposed
No. Conditions Condition timing
Material change of use
10.9.4.2.4.1 – Material change of use near a State transport corridor—The chief executive administering
the Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads to
be the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
1. (a) Road access is located generally in accordance with the Site At all times
Master Plan prepared by Covey Associates Pty Ltd, dated 13 Feb
2025, reference 244035, Issue A, as amended in red by SARA on
13 November 2025.
(b) The road access (at the road access location) comprises of a
Rural Property Access Type C sealed to the property boundary
with a 6m throat, Auxiliary Left Turn Treatment (AUL) and
Channelised Right Turn Treatment (CHR).
(c) The road access, referred to in part (b) of this condition, must be
maintained in accordance with:
(i) the Department of Transport and Main Roads’ Standard
Drawing 1807, Rural Property Access Type C
(ii) the Department of Transport and Main Roads’ Road
Planning and Design Manual, 2nd Edition
(iii) the Department of Transport and Main Roads’ Policies and
Technical Specifications
(iv) the Department of Transport and Main Roads’ Standard
Drawings Roads, and
(v) relevant local government requirements.
2. Carry out the stormwater management of the development generally in At all times
accordance with ‘Stormwater Quantity’ of the Stormwater Management
Plan, prepared by Covey Associates Pty Ltd, dated Feb 2025,
reference M25-0042Rpt, Issue A, as amended in red by SARA dated
13 November 2025.
10.3.4.3.1 – Material change of use that involves clearing native vegetation—The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Natural
Resources and Mines, Manufacturing and Regional and Rural Development to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
3. Clearing of native vegetation associated with the material change of At all times
use must not occur within Area B (B1-B6), as shown on:
Vegetation Management Plan, prepared by the Queensland
Government, reference VMP 2503-45382 SRA, sheet 1 of 1,
version 1 2, and
Attachment: 2503-45382 SRA Derived GPS Reference Points,
prepared by the Queensland Government
4. Built infrastructure associated with the Material Change of Use, other At all times
than for fences, roads, underground services must not be established,
constructed or located within Area C (C1-C15) as shown on:
Vegetation Management Plan, prepared by the Queensland
Government, reference VMP 2503-45382 SRA, sheet 1 of 1,
version 1 2, and
Attachment: 2503-45382 SRA Derived GPS Reference Points,
State Assessment and Referral Agency Page 3 of 8
See the original