Original source · versioned page text
2503-45382 SRA - Amended response - with conditions
Attached to the e-mail 132005.638.04 SARA amended response.
2503-45382 SRA
Attachment 3—Changed advice to assessment manager
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.2). If a word remains
undefined it has its ordinary meaning.
State Transport - Public utility works and connections
2. The applicant is advised that if any works and/or connections are required to public utility services
within a state-controlled road reserve, approval must be given by the Department of Transport
and Main Roads under the relevant public utility legislation (electricity, water/sewer,
telecommunication), and in accordance with TMR technical standards (TN163).
The applicant is advised that if any works and/or connections are required to public utility
services within a state-controlled road reserve, approval must be given by the Department
of Transport and Main Roads under the relevant public utility legislation (electricity,
water/sewer, telecommunication), and in accordance with TMR technical standards (Non-
Transport Utility Management and Design Manual) Non-Transport Utility Management and
Design Manual (Department of Transport and Main Roads .
Approvals must be obtained prior to commencing any utility works within the state-controlled
road reserve. Please contact the public utility team via email at [email protected] for
further information on the application and approval process.
State Assessment and Referral Agency Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original