Skip to the record
Search everything, all in one place.

Council archive · source document

07/0738 - Response to Information Request [As Published] · 132007.738

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

GATEWAY DRIVE, NOOSAVILLE < > Cardno

OPERATIONAL WASTE MANAGEMENT PLAN

 

4.

WASTE MANAGEMENT PLAN

This WMP has been prepared to reduce any environmental harm resulting from waste
generation during the site’s operation.

4.1 Components of the Waste Management Plan

Rationale - The intentions and principles of the WMP, providing the framework for tasks
and actions to achieve the objectives for environmental protection.

Objectives - Specific goals set for waste management to be achieved with regard to the
rationale.

Tasks/Actions - Measures to be implemented to manage the identified impacts and to
implement the specified objectives.

Performance Indicators - Criteria to be measured to ensure achievement of the waste
management objectives.

Frequency/Timelines - The time frame for each task and/or action is to be completed.

Responsibility — The assignment of responsibility for undertaking each task and action, for
monitoring any impacts, and for reporting requirements.

Monitoring and Reporting - Monitoring and reporting requirements for the implementation
of specified waste management measures.

Corrective Actions - Measures to be undertaken if objectives, as identified through
monitoring, are not achieved.

4.2 Terminology
The term Developer refers to Mintgrove Pty Ltd.

The term Body Corporate Manager refers to a designated representative of the Body
Corporate, responsible for the operational management of the development.

The term Owner/Lessee refers to any person and/or company carrying out business or
undertaking an action within the completed development.

The term Contractor refers to any company, or representative of such, hired to conduct
business within the completed development on a temporary basis.

The term Consultant refers to the civil and/or environmental engineering consultant
employed by the Developer.

The term WMP refers to this Waste Management Plan.

 

Mintgrove Pty Ltd Version 2 14 February 2008
1.\7800-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page 6

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - Response to Information Request [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.