Council archive · source document
07/0738 - Response to Information Request [As Published] · 132007.738
GATEWAY DRIVE, NOOSAVILLE C | > Cardno OPERATIONAL WASTE MANAGEMENT PLAN « Water captured in bunds and sumps will be processed and disposed of as soon as practicable. e All vehicles entering and leaving the site must be clean, and loads securely stowed and covered where practicable. Pest and Vermin Control Each Owner/Lessee and the Body Corporate Manager will facilitate the following strategies to prevent attracting pests, vermin and disease vectors to the facility as required. « Waste receptacles for organic and food wastes will be covered. « No pooling or ponding of spills or stormwater will be allowed around the individual bin storage areas or around the bin wash-down areas. e Pest exterminators are to be utilised on a periodic basis if required. e Training in appropriate housekeeping will be provided to each Owner/Lessee and Contractors. Stormwater Management The bin wash-down areas shall be fully bunded to prevent contamination of the surrounding environment. The area shall be fitted with stormwater diversion facilities. Wastewater will be diverted to sewer after initial treatment to trade waste disposal standards. Non-contaminated stormwater will be diverted from potentially contaminated areas. Spill management procedures will be developed and implemented for the site and spill kits provided. A weekly inspection of Bin Collection Points will be undertaken by the Body Corporate Manager. The inspection will assess housekeeping to ensure all drains are free of litter and are able to operate at optimum efficiency. Removal of Waste All vehicles entering and leaving the site must be clean, and loads securely stowed and covered where practicable. Wastes shall only be transported to recycling or disposal facilities licensed for the particular waste stream(s). The quantities of all wastes removed from the site will be recorded on a Waste Register Form by the Body Corporate Manager for a period of three months following the commencement of operation of the site. An example of a Waste Register From is provided in Appendix A of this WMP. Waste quantity and type will be assessed after this time period to determine if additional services and bin capacity will be required. 4.6 Performance Indicators Evidence of waste spillage or dispersal during inspections shall indicate non-compliance with the objectives and the tasks/actions outlined in this WMP. Visual inspection of on-site stormwater treatment measures shall be undertaken weekly during operation. Evidence of stormwater blockage by wastes or pollution shall indicate non-compliance with the objectives and the tasks/actions outlined in this WMP. Mintgrove Pty Ltd Version 2 14 February 2008 147800-62\wp\Waste Management Plan (2).doc Commercial in Confidence Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.