(a) Minimise Erosion
(i) For areas of the site which drain to a sediment basin, implement drainage and
erosion control measures prior to rainfall which prevent or minimise rill erosion
and gully erosion;
(ii) For areas of the site which do not drain to a sediment basin, implement drainage
and erosion control measures prior to rainfall (including contingency measures)
which prevent or minimise erosion, including rain drop erosion, chemical erosion,
rill erosion and gully erosion;
(iii) Prior to the sealing of the plan of survey for the development, all site surfaces
must be effectively stabilised using methods which have achieved effective short-
term stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term. For the purpose of this condition, an effectively stabilised
surface is defined as one that does not, or is not likely to result in visible evidence
of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead
to water contamination.
(b) Manage concentrated stormwater flows
(i) Prior to each rainfall event ensure concentrated stormwater flow paths are
provided with capacity in accordance with IECA (2008) Table 4.3.1 and are
structurally stable in all rainfall events for the following sources:
(a) From stormwater catchments upslope of the area of disturbance which are
either stable or external to the site, ensure stormwater is diverted or managed
either:
(i) around the site or through the site without causing erosion and without
contaminating the flow; or
(ii) if it is impractical to convey the flows around or through the site, convey the
flows into appropriately sized sediment basins without causing erosion
(b) From all disturbed areas of the site to sediment basin(s) without causing erosion
(c) Minimise sediment released from the site
(i) Install and maintain sediment basins for each disturbed catchment area of the
site and including undisturbed catchments which cannot be diverted, such that:
(a) Each basin is sized and operated in accordance with either a Type-A or Type-B
sediment basin as documented in IECA (2008) Appendix B (June 2018).
(b) Each basin is to be provided with an automated system of flocculant dosing and
a suitable supply of flocculant/coagulant, with the type of flocculant/coagulant
determined based on Chemical Coagulants and Flocculants Fact Sheet (IECA,
2018).
(c) Markers are provided within each basin indicating the maximum sediment
storage level and any additional water storage capacity for water reuse.
(d) During discharge from the primary outlet system, the concentration of total
suspended solids (“TSS”) discharged does not exceed 50mg/L and that pH is
within the range of 6.5-8.5 unless entering a naturally acidic environment.
(ii) Install and maintain additional sediment control measures within the site, as
necessary to maximise sediment capture.
(iii) Minimise the tracking of dirt from the site onto roadways. Ensure that all dirt on
roadways caused by vehicles leaving the site is removed without causing water
contamination, prior to rainfall and at least at the end of each work day.
Page 10 of 18
Document Set ID: 22642068
Version: 2, Version Date: 31/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW19 0266 03.pdfRelated documentApplication case desk ↗
About this file
- File size
- 245 KB (small file)
- File type
No other editions are linked here.