                                             Officer:          Denis Wallace
                                             Direct Telephone: (07) 5449 5179
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    2003/220653

5 July 2010

CBD Settlers Cove Pty Ltd
PO Box 1923
NOOSA HEADS QLD 4567



Dear Sir

                       Change to an Existing Approval
                                  Integrated Planning Act 1997

I refer to your request of extension to relevant period and to make a change to an existing approval.
On 1 July 2010 Council decided your requested changes.
Details of the decision with the consolidated conditions are as follows:

1     APPLICATION DETAILS

 Application No:                 23176 DA (2003/220653)
 Street address:                 Serenity Close, Noosa Heads
 Real property description:      Lot 7 SP 195871
 Planning Scheme:                Superceded Planning Scheme (1997)

2     DECISION DETAILS
Council on 4 November 2004 decided to approve the application and grant a Development Permit,
subject to conditions.

In relation to representations made by the Applicant, Council on 10 March 2005 decided to:

A.      Approve a change to conditions 97, 122.5 & 122.8;
B.      Delete condition 122.7.

In relation to a request to change the development approval, Council on 24 August 2005 decided to:

A.      Approve a change to Conditions 1 and 121;
B.      Include 2 additional conditions;
C.      Issue a Compiled Decision Notice.
In relation to the request to make a change to the existing approval, Council on 1 July 2010 decided
to:
A.      Approve a change to the development approval with changes to Conditions 1, 5, 10, 77, 78,
        81, 82, 83, 84, 85, 86 & 110 and Advisory Notes 7 & 8.
B.      Include additional Condition 133.
                                                                                        Page 1 of 24
Full text of the other 23 pages

Page 2

                                                                                 2003/220653

C.     Include additional Advisory Note 9.
D.     Extend the relevant period until 4 November 2011.
E.     Issue a Change to an Existing Approval.

3    RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4    ASSESSMENT MANAGER CONDITIONS
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table and as
     may be amended by these conditions.

       Plan No.       Rev.    Plan / Document Name                        Drawn By              Date

       A-WD-1-1-01      G     MASTERPLAN VILLA LOWER LEVEL                DBI Design Pty Ltd    Sep 2008

       A-WD-1-1-02      G     MASTERPLAN BASEMENT LEVEL + UPPER           DBI Design Pty Ltd    Sep 2008
                              VILLA LEVEL

       A-WD-1-1-03      H     MASTERPLAN LEVEL 1 GROUND                   DBI Design Pty Ltd    Sep 2008

       A-WD-1-1-04      G     MASTERPLAN LEVEL 2                          DBI Design Pty Ltd    Sep 2008

       A-WD-1-1-05      G     MASTERPLAN LEVEL 3                          DBI Design Pty Ltd    Sep 2008

       A-WD-1-1-06      G     MASTERPLAN LEVEL 4                          DBI Design Pty Ltd    Sep 2008

       A-WD-1-1-07      G     MASTERPLAN ROOF PLAN                        DBI Design Pty Ltd    Sep 2008

       A-WD-2-1-10      L     LOT 7 – BASEMENT FLOOR PLAN                 DBI Design Pty Ltd    Sep 2008

       A-WD-2-1-11      K     LOT 7 – LEVEL 1 GROUND FLOOR PLAN           DBI Design Pty Ltd    Sep 2008

       A-WD-2-1-12      K     LOT 7 – LEVEL 2 FLOOR PLAN                  DBI Design Pty Ltd    Sep 2008

       A-WD-2-1-13      K     LOT 7 – LEVEL 3 FLOOR PLAN                  DBI Design Pty Ltd    Sep 2008

       A-WD-2-1-14      K     LOT 7 – LEVEL 4 FLOOR PLAN                  DBI Design Pty Ltd    Sep 2008

       A-WD-2-1-15      K     LOT 7 – ROOF PLAN FINISHED                  DBI Design Pty Ltd    Sep 2008

       A-WD-3-1-01      F     LOT 7 ELEVATION – SHEET 1 SOUTH and         DBI Design Pty Ltd    Sep 2008
                              WEST ELEVATION

       A-WD-3-1-02      F     LOT 7 ELEVATION – SHEET 2 NORHT and         DBI Design Pty Ltd    Sep 2008
                              EAST ELEVATION

       A-WD-6-1-01      C     GYM - LOT 7 PLAN, ROOF AND R.CP             DBI Design Pty Ltd    Sep 2008
                              PLANS

       A-WD-6-1-02      C     GYM - LOT 7 ELEVATION AND SECTIONS          DBI Design Pty Ltd    Sep 2008




                                                                                 Page 2 of 24

Page 3

                                                                                    2003/220653

2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    The open space and setback areas within the area of the site able to be developed excluding
      the area of the site included on the Future Urban zone, are to be landscaped in accordance
      with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan.
      Such landscaping is to be completed prior to the premises being occupied and maintained at
      all times thereafter and shall include:
      3.1   retention of existing trees within the side and front setback areas, except where their
            removal would be necessary as a result of approved building or operational works;
      3.2   retention of existing trees between the building and the area of the site identified as
            Open Space Conservation & Waterway on Drawing No. 881228/E, titled ‘Metes &
            Bounds Plan for Private Open Space for Conservation and Waterways Protection on
            Residential High Density (RHD) and dated 30 June 2004, except where their removal
            would be necessary as a result of approved building or operational works or the
            requirements of the Bushfire Management Plan; and
      3.3   incorporation of koala and glossy black cockatoo food trees.
4.    Any fencing provided in conjunction with the development is to be setback at least 1 metre
      from the road frontage with at least half of any fence setback 2 metres. Dense landscaping is
      to be provided between the road frontage and any fencing.
5.    The natural ground shall be reinstated around the lower level of the buildings to minimise their
      visual bulk, as indicated on the approved plans.
6.    Existing trees on the site and within road reserves are to be retained except where required to
      be removed due to building operations, requirements of the Bushfire Management Plan & the
      Ecological Restoration Plan or the conduct of the approved use.
7.    Any advertising sign or device is to comply with the provisions of Council's policies on
      advertising.
8.    Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
9.    The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
10.   This Development Permit for a material change of use lapses if the use has not happened by 4
      November 2011, unless an application to extend the relevant period is approved by Council.
11.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for building works.
12.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products – Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2). All tap ware and shower roses shall not exceed a maximum flow
      of 9 litres per min. Dishwashers, baths, spa baths and washing machines are excluded from
      this requirement.
      Environmental
13.   The development over the subject site shall comply with the following:

                                                                                    Page 3 of 24

Page 4

                                                                                    2003/220653

      13.1 All necessary stormwater, erosion and sediment and water quality management and
           control devices shall be located within the development precinct. That is, areas shown
           as ‘Selective Clearing’ on the Vegetation Clearing Plan dated 23.7.04.
      13.2 No clearing or removal of native vegetation (other than that specified in the Ecological
           Restoration Plan) shall be undertaken within the area of ‘Retained and Enhanced
           Vegetation’ shown on the Vegetation Clearing Plan dated 23.7.04.
      13.3 The building set back line between the ‘Private Open Space for Conservation &
           Waterways Protection’ area and any development on proposed Lot 7 of the Residential
           High Density Development shall be 6.0 metres, apart from accessible open decks and
           balconies which shall maintain a setback of 3.0 metres.
      Management Plans
14.   The Applicant shall prepare various management plans that relate to the design, construction
      and operational phases of the development. These plans are to be prepared by appropriately
      qualified persons to the reasonable satisfaction of Council prior to any further approvals being
      issued, unless any other condition herein or in a subsequent development permit require
      otherwise.
      The plans are to provide specific matters detailed in the conditions of this approval. The plans
      to be submitted include:
      14.1 Environmental Management Plan
      14.2 Ecological Restoration Plan and Specifications
      14.3 Fauna Management Plan
      14.4 Fire Management Plan
      14.5 Construction Management Plan (including Traffic Management Plan)
      14.6 Sediment and Erosion Control Plan
      14.7 Stormwater and Water Quality Management Plan
      14.8 Acid Sulphate Soils Management Plan
      Fees Payable
15.   The Applicant shall pay Council all reasonable costs for the assessment of the management
      plans and also the costs associated with ensuring the development complies with the
      requirements of this approval. These costs shall be limited to a maximum of $30,000 including
      the cost of external consultants should they be required.
16.   The further approvals required to allow development to occur shall be subject to the fees
      contained in Council’s Fees and Charges Schedule.
      Environmental Covenant
17.   An environmental covenant as defined by Part 6, Division 4a of the Land Title Act 1994, shall
      be registered in favour of Council on the title of proposed Lot 7 having an area described by
      metes and bounds on Drawing No. 881128/E M & B dated 30/06/04, described as Private
      Open Space Conservation & Waterway Protection area.
18.   The environmental covenant shall cater for the requirements of the conditions of approval by
      protecting vegetation described as the ‘Retained and Enhanced Vegetation’ as shown on the
      Vegetation Clearing Plan dated 23 July 2004.
      Private Open Space for Conservation & Waterways Protection
19.   The area of the site known as the ‘Private Open Space for Conservation & Waterway
      Protection’ area on Drawing No. 881128/E M & B and dated 30/06/04 shall be:

                                                                                    Page 4 of 24

Page 5

                                                                                       2003/220653

      19.1 Managed to protect and reinforce its environmental values, particularly its Koala habitat
           and corridor values, Glossy Black Cockatoo habitat values, scenic amenity values and
           water quality protection function.
      19.2 Managed and maintained in accordance with the approved Environmental Management
           Plan, Fauna Management Plan, Fire Management Plans and Ecological Restoration
           Plan.
      19.3 Separated from adjacent development by a 1.2 m high fence. The fence shall be ‘fauna-
           friendly’ but shall deter unauthorized people from entering the area. A suitably located
           lockable gate may be provided to allow appropriate access by authorised personnel
           subject to the reasonable satisfaction of the Manager – Land Use.
      19.4 Have signs placed on the fence to inform people that the ‘Private Open Space for
           Conservation & Waterways Protection’ area is for conservation and waterway protection
           purposes and access is prohibited.
      19.5 Maintained by authorized people only permitted in this area as appointed by the owner
           responsible for the management and protection of the ‘Private Open Space for
           Conservation & Waterways Protection’.
      19.6 Protected from infrastructure, tracks, drainage, water control devices, etc. or other
           development.
      19.7 Protected so that native trees and vegetation are not removed, pruned, lopped,
           damaged or otherwise adversely affected without written approval from Council’s
           Manager – Environmental Services.
      19.8 The ‘Private Open Space for Conservation & Waterways Protection’ area shall be
           restored and managed in accordance with the Ecological Restoration Plan.
      Vegetation Removal, Disposal and Protection in the Development Area
20.   Vegetation protection, removal and disposal within the development area shall be undertaken
      in general accordance with the Fauna Management Plan by James Warren & Associates
      (dated May 2003) and the Vegetation Management Plan by Greening Australia (dated May
      2003).
21.   Vegetation removal, tree felling and lopping shall be undertaken in an environmentally
      sensitive manner to avoid damaging surrounding vegetation, trees and habitat.
22.   Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos,
      possums). If wildlife species are present, the tree shall not be felled or lopped until the wildlife
      has left the tree.
23.   All cleared vegetation shall be suitably processed or removed from the site by a method
      approved by Council.
24.   Environmental weed species cleared from the site shall not be mulched. Vegetation material
      from environmental weed species shall be removed from the site and disposed of in a Council
      approved refuse tip.
25.   Burning off is not considered an acceptable means of disposal and is not to take place.
26.   During construction, the boundaries of areas of retained and protected vegetation shall be
      clearly marked for the purpose of preventing access into these areas thereby protecting the
      vegetation and habitat values.
27.   All underground services, drainage, footpaths, bikepaths, roads and other site works shall be
      located to minimize adverse impacts on retained vegetation, particularly their root system.




                                                                                       Page 5 of 24

Page 6

                                                                                    2003/220653

28.   Vegetation and individual trees retained in the development area shall be healthy and vigorous
      with an expected life span of at least 50 years. A risk assessment by a qualified arborist shall
      be undertaken on all individual trees and stands of vegetation to be retained within the
      development area. An arborist’s written report shall be included in the relevant Operational
      Works applications.
29.   Prior to the commencement of any works on site a photographic survey of the existing
      vegetation within the escarpment area (the area of the site zoned Non-Urban) shall be
      undertaken and submitted to Council. Following the completion of all ecological restoration
      works a further photographic survey shall be undertaken annually and submitted to Council as
      evidence of the vegetation that is to be protected on site.
      Koalas and Koala Habitat Protection
30.   Koalas and their habitat require special protection and particular consideration shall be given
      to:
      30.1 The protection and restoration of koala habitat, habitat linkages and corridors on the site
           as shown on Figure 7 by Environmental Science and Services, dated October 2003.
      30.2 The protection and restoration of existing and new vegetation to facilitate Koala
           movement throughout the entire site.
      30.3 The protection of Koalas during the construction and operation phases of the
           development.
      30.4 The planting of additional koala food and habitat tree species as part of the landscaping
           in the development area.
31.   Known Koala habitat trees within development precincts shall be protected unless specific
      approval exists for their removal or lopping, or their removal or lopping would be necessary as
      a result of approved operational or building works.
32.   Rehabilitation/re-establishment of the Koala habitat and habitat links shown in Figure 7 by
      Environment Science & Services dated October 2003 within the site shall be given priority in
      the Ecological Restoration Plan and the landscaping plans for the development area of the
      site.
33.   All swimming pools provided for by any development shall have a rope installed to allow
      Koalas to exit the pool.
      Glossy Black Cockatoos and their protection
34.   Glossy Black Cockatoos and their habitats require special protection and particular
      consideration shall be given to:
      34.1 The protection and restoration of Glossy Black Cockatoo habitat on the site.
      34.2 The protection of Glossy Black Cockatoos during the construction and operation phases
           of the development.
      34.3 The planting of additional Glossy Black Cockatoo food and habitat tree species as part of
           the landscaping in the development precincts.
      34.4 Rehabilitation/re-establishment of Glossy Black Cockatoo habitat within the development
           precincts shall be given priority in the Landscape Master Plan.
      34.5 Nesting boxes for cockatoos shall be installed on trees.
      Weed and Pest Species Control
35.   Weed control shall be undertaken in general accordance with the Vegetation Analysis Report,
      dated December 2002, prepared by Greening Australia.


                                                                                    Page 6 of 24

Page 7

                                                                                     2003/220653

36.   All plants listed as environmental weeds by the Queensland Herbarium or listed as
      Undesirable Plant Species by Noosa Council shall be removed and/or treated as per condition
      35.
37.   Prior to entering the site, all construction machinery and vehicles shall be washed down to
      remove soil that may contain weed seeds, soil pathogens and pest species.
38.   All nursery stock shall be weed, pest and disease free and certified as such by the supplier.
      The certificates are to be obtained prior to the commencement of any landscaping works on
      site and shall be made available to Council upon request.
39.   All mulch produced on site by mulching cleared vegetation and trees shall specifically exclude
      material (particularly seeds) from environmental weed species (eg. lantana, asparagus and
      umbrella trees).
40.   Soil disturbance shall be kept to a minimum to avoid weed proliferation.
41.   The eradication and control of environmental weeds will be an integral part of both the
      Ecological Restoration Plan and any landscaping plans for the development. Vegetation used
      in restoration work and landscaping shall exclude environmental weed species.
      Ecological Restoration Plan and Specifications
42.   An Ecological Restoration Plan and Specifications shall be prepared by a specialist restoration
      ecologist, to the reasonable satisfaction of the Council. The applicant shall implement the Plan
      and Specifications. It shall identify all the areas designated as ‘retained and enhanced’
      vegetation that require ecological restoration and specify actions and works necessary to
      result in robust, self-sustaining viable plant communities and habitat. (Note: The dense she-
      oak and wattle areas are a stalled seral stage of a Eucalyptus and Callitris open forest. These
      areas need special management to ‘kick-start’ the natural regeneration processes and enable
      the vegetation to develop into self-sustaining open forests. It is not just a matter of removing
      weeds and planting some trees.). The following, inter alia, shall be addressed and included in
      the Plan and Specifications:
      42.1 Document the current status of the areas requiring ecological restoration in terms of
           structure, floristics, missing elements, health, vigour, etc.
      42.2 Formulate structural and floristic models for the plant communities requiring ecological
           restoration.
      42.3 Specify the required works and actions for each area in terms of:
                  site preparation (this may include thinning, removal of dense leaf litter, weed
                   removal and control, etc.),
                  establishment of the missing floristic and structural elements,
                  habitat creation and reinforcement for native fauna and reinforcement of habitat
                   linkages and corridors,
                  creating opportunities for regeneration from the seed bed, natural recruitment and
                   the establishment of wildlings,
                  planting and mulching procedures,
                  fertilizing procedures noting the low nutrient status of these ecosystems,
                  watering procedures,
                  protection from wildfire, particularly during the establishment phase,
                  erosion and sediment control,
                  on-going maintenance,

                                                                                     Page 7 of 24

Page 8

                                                                                   2003/220653


                  environmental safeguards, and
                  incorporation of the relevant requirements of all the management plans required
                   by this approval, particularly the Fauna Management Plan, Fire Management
                   Plan, and the Environmental Management Plan.
43.   The Ecological Restoration Plan and Specifications shall include all parts of the site
      designated as ‘Retained and Enhanced Vegetation’. This area is shown in green on the
      Vegetation Clearing Plan dated 23.7.04.
      Fauna Management Plan
44.   A Fauna Management Plan shall be prepared to the reasonable satisfaction of the Council and
      shall be implemented by the applicant. The Fauna Management Plan shall be generally in
      accordance with James Warren’s & Associates Fauna Management Plan dated May 2003.
45.   The Fauna Management Plan shall specify the numbers and types of forage and habitat trees
      (particularly for Koalas and Glossy Black Cockatoos) to be planted in the ‘retained and
      enhanced’ vegetation area shown on the Vegetation Clearing Plan dated 23.7.04. Particular
      attention shall be paid to the following areas:
      45.1 Planting of Allocasuarina littoralis (for Glossy Black Cockatoos) also appropriate hollow
           developing trees throughout all areas of retained vegetation and areas to be
           rehabilitated.
      45.2 The ‘Private Open Space for Conservation & Waterways Protection’ area within
           proposed Lot 7. Nesting boxes of a range of sizes shall be installed in nominated trees.
           The number, type, size, location and purpose of the nesting boxes is to be specified.
           The manner in which these nesting boxes are to be maintained shall be specified.
46.   No cats and dogs shall be permitted on the subject land either during construction or by
      owners of any premises unless kept in purpose-built cat or dog runs (eg. large caged or fenced
      areas).
      Fire Management Plan
47.   A Fire Management Plan shall be prepared, to the reasonable satisfaction of the Council, for
      the subject land and shall be implemented by the owner.
48.   The Fire Management Plan shall address:
      48.1 Fire management and protection within the site.
      48.2 Bushfire management and control in all the area of Retained and Enhanced Vegetation.
49.   The Bushfire Management component of the Fire Management Plan shall be generally in
      accordance with the Bushfire Management Plan prepared by Greening Australia Queensland,
      dated May 2003. It shall incorporate recommendations for fuel reduction other than by fire.
      Further the Fire Management Plan will address provision of some fire hydrants on the
      proposed firebreaks on the adjoining land, as required.
50.   The Fire Management Plan is to be implemented by the Developer and future owners of the
      site and is to be referenced in any community management statement(s).
51.   The Fire Management Plan shall demonstrate a high level of environmental care and
      responsibility and be consistent with best practice for developments of this type in similar
      environments.
52.   Fire hydrants shall be supplied and located at the boundary of the development at the point
      where they abut or include areas of native vegetation.
53.   The Fire Management Plan for the developed areas shall address, inter alia, the following:
           setback zones from retained native vegetation;
                                                                                   Page 8 of 24

Page 9

                                                                                     2003/220653


           access between structures and vegetated areas;
           proposed building construction methods, materials and designs to reduce fire risks;
           gutter treatments to avoid the collection of leaves and other fire-prone material;
           location of fire hydrants and water points;
           access for fire fighters and emergency workers;
           fire suppression and evacuation procedures;
           landscaping measures to reduce fire risk;
           owners and operators training and responsibilities;
           implementation procedures.
54.   The Fire Management Plan shall meet the provisions of the Queensland Fire and Rescue
      Authority Act 1990 and shall be endorsed by the Queensland Fire & Rescue Authority.
55.   The Applicant shall provide a bushfire information kit to the body corporate manager. The
      bushfire information kit shall be submitted to Council for approval as part of the Fire
      Management Plan.
56.   The Fire Management Plan shall incorporate all the relevant requirements of, and be
      consistent with, all the other management plans required by this approval.
      Environmental Management Plan
57.   An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that
      the impact of the development on the environment is minimised and that the environmental
      values of the site are protected and enhanced. The EMP is to:
      57.1 Comply with AS14000.
      57.2 Demonstrate a high level of environmental care and responsibility and be consistent with
           best practice for developments of this type in similar environments.
      57.3 Detail the developer’s environmental           policy and   the proposed environmental
           management system for the site.
58.   The Environmental Management Plan shall specify to the reasonable satisfaction of Council:
      the performance targets, including those derived from the conditions and other requirements
      arising from legislation and other approvals;
           how the performance targets are to be achieved;
           when the performance targets will be satisfied;
           how performance will be monitored;
           corrective actions and contingency measures to be undertaken;
           reporting arrangements (including monthly reports to Council during construction);
           auditing arrangements;
           how the requirements are to be incorporated into construction and works contracts;
           how the developers employees, contractors and the contractor’s employees will be
            informed and trained with respect to the environmental protection requirements;
           enforcement; and
           penalties for non-compliance.
59.   The EMP shall apply to all works and activities on the site and the adjacent road reserve.
                                                                                     Page 9 of 24

Page 10

                                                                                       2003/220653

60.   In particular, but without limitation, the EMP shall address the following issues in relation to the
      construction and operational phases of the development:
            legislative compliance;
            vegetation protection;
            fauna and fauna habitat protection;
            aquatic ecosystem protection;
            weed control;
            pest control (particularly mosquitoes)
            soil erosion and sediment control;
            water quality protection;
            groundwater protection;
            air quality protection;
            acid sulphate soil management;
            storage and handling of hazardous substances;
            noise and vibration management;
            waste management;
            cultural heritage management;
            visual amenity protection;
            bushfire control;
            environmental emergencies;
            community liaison.
61.   The Environmental Management Plan shall incorporate the requirement for monthly
      environmental compliance monitoring and annual audit reports to be submitted to Council for
      the construction stages of the development. The format and content of these reports shall be
      in hard copy and digital form, generally in accordance with the following:
      61.1    Include tables of the monitoring results (digital form should be in Excel).
      61.2    Include individual charts plotting the results for all parameters required in the
              monitoring.
      61.3    Include a brief written discussion of the results and recommend any necessary
              actions.
62.   The Applicant and all future owners of the site shall comply with the EMP and compliance with
      the EMP shall be referenced in any community management statement for any group title
      development over the site.




                                                                                      Page 10 of 24

Page 11

                                                                                     2003/220653

      Sediment and Erosion Control Plan
63.   Detailed staged Sediment and Erosion Control Plans shall be prepared for the site, to the
      reasonable satisfaction of Council and implemented by the owner. The Plans shall be in
      accordance with the Institution of Engineers Australia ‘Engineering Guidelines for Queensland
      Soil and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that
      document. The Sediment and Erosion Control Plans shall cover all development on site
      (during the construction, establishment and operational phases), ecological restoration and
      remediation works. The methods of controlling erosion and sediment are required to be
      submitted to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
64.   The Sediment and Erosion Control Plans shall also apply to the area of ‘Retained and
      Enhanced Vegetation’ shown on the Vegetation Clearing Plan dated 23.7.04, and shall:
      - identify existing erosion problems, and
      - specify appropriate remedial actions.
65.   All necessary erosion and sediment control devices shall be incorporated within the
      development area of the site.      That is the area shown as ‘Selective Clearing’ on the
      Vegetation Clearing Plan dated 23.7.04.
      Stormwater and Water Quality Management Plan
66.   A Stormwater and Water Quality Management Plan for the site shall be prepared to the
      reasonable satisfaction of Council and implemented by the owner.
67.   The Stormwater and Water Quality Management Plan shall take into account matters specified
      in section 19.4 of the Environmental Protection (Water) Policy 1997.
68.   Key water quality objectives to be reflected in the Stormwater and Water Quality Management
      Plan are for the protection of aquatic ecosystems in the waterways, wetlands and wet
      heathlands of the site and the receiving waters of Noosa Inlet and the Noosa River. The low
      nutrient and pH environment of the wetlands and wet heathlands of the site are the key factors
      in determining appropriate performance targets. Specifically, water quality objectives shall
      include the following performance targets, subject to the constraints of the catchments external
      to the site:
      - Total nitrogen levels – 0.34 mg/l
      - Total phosphorous levels – 0.035 mg/l
      - pH – 4 to 5.
69.   The Stormwater and Water Quality Management Plan shall comply with and address, inter
      alia, the following issues in relation to the construction, establishment and operation phases of
      the development:
      69.1 All necessary stormwater treatment and water quality devices associated with the
           development shall be located within the approved boundaries of the site.
      69.2 During the construction phase, monthly water quality monitoring and monitoring after
           significant rainfall events (at least two per year) shall be undertaken for:
                  suspended solids and turbidity,
                  temperature,
                  salinity,
                  total nitrogen,
                  total phosphorous,
                  pH,

                                                                                    Page 11 of 24

Page 12

                                                                                      2003/220653


                  trash and gross pollutants, and
                  dissolved oxygen.
      69.3 During the establishment and operation phases, water quality monitoring shall be
           undertaken every third month and monitoring after significant rainfall events (at least two
           per year) shall be undertaken for:
                  total nitrogen,
                  total phosphorous,
                  suspended solids and turbidity,
                  pH,
                  salinity,
                  temperature,
                  dissolved oxygen,
                  trash and gross pollutants,
                  algal count and identification, and
                  faecal coliforms.
70.   The Developer shall continue this water quality monitoring for a period of 3 years from
      completion of the final stage of construction.
71.   In addition, the Developer shall undertake inspections for erosion and deposition, the build-up
      of trash and gross pollutants, and other water pollution. These inspections will be carried out
      every third month as well as after significant rainfall events, for a period of 3 years from
      completion of the final stage of construction.
72.   An operational phase Water Quality Management Plan shall be prepared to the reasonable
      satisfaction of Council and address water quality performance targets, water treatment
      devices, water quality maintenance, requirements for stormwater management measures and
      devices, contingency measures for aquatic plant growth, loss of vegetation in swales and filter
      strips, pollution response and algal blooms. It shall also include a mosquito management
      strategy. The plan shall demonstrate compliance with the prescribed water quality objectives.
      72.1 Responsibilities shall be clearly delineated.

      72.2 Non-compliance with prescribed water quality standards will trigger the implementation
           of measures to rectify the problem(s).

      72.3 Reports on monitoring, incidents, corrective action and plan updates shall be submitted
           to Council every three (3) months with Council being notified if any incident is recorded.
           These reports shall include information collected during the monthly monitoring
           program, shall highlight any non-standard results, and be submitted in a form
           acceptable to Council. The format and content of these reports shall be in hard copy
           and digital form, generally in accordance with the following:
                  including tables of the monitoring results (digital form should be in Excel);
                  include individual charts plotting the results for all parameters required in the
                   monitoring (digital form should be in Excel);
                  include a brief written discussion of the results and recommend any necessary
                   actions.


                                                                                     Page 12 of 24

Page 13

                                                                                  2003/220653

      Water Quality Devices
73.   Water quality control devices shall be installed generally in accordance with the Stormwater
      and Water Quality Management Plan. Detailed staging plans and specifications, based on and
      generally in accordance with the Plan shall be prepared and submitted (after consultation with
      officers of the Council) with the relevant applications for operational works.
      Drainage Works
74.   The Developer shall complete the drainage works progressively in conjunction with
      development of the site and generally in accordance with the approved Stormwater and Water
      Quality Management Plan. Detailed drainage plans and specifications, based on and
      generally in accordance with the approved Drainage Plan, the EMP and these Conditions,
      shall be prepared and submitted (after consultation with officers of the Council) with the
      relevant applications for operational works.
75.   All drainage works as required by the Drainage Plan shall be provided by the Developer at its
      own cost.
76.   A holding tank shall be provided on site with a capacity to hold at least 20,000 l for the
      purposes of providing a water supply for non-potable uses such as landscaping.
Land Development
Vehicle Access
77.   A 5.5 metre wide concrete crossover driveway shall be constructed from Serenity Close
      generally in accordance with Council’s Standard Drawing R-0051.
78.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any level difference. Should any driveways be
      constructed to grades that do not comply with Council’s Standards or AS/NZS 2890.1-2004,
      Council will require that the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
79.   All vehicles shall enter and leave the site in a forward direction.
80.   Full engineering details of the proposed driveway and carparking area shall be submitted for
      approval prior to obtaining a Development Permit for Operational Works.
Internal Driveways
81.   The development shall have an internal driveway that complies with the width requirements as
      set out in AS/NZS 2890.1-2004.
Service Bay
82.   One of the carparking spaces towards the frontage of the development shall be used as a
      shared service bay for small delivery/maintenance vehicles. This space shall be clearly line-
      marked and sign posted for use by Service Vehicles between the hours of 6am to 6pm.
      Outside of the specified hours the space could be used as a standard visitor space.
Carparking
83.   Carparking shall be provided within the site as generally shown on drawing number A-WD-2-1-
      10 M dated September 2008 by DBI Design, except as modified herein.
84.   A minimum of 38 carpark spaces shall be provided on site, comprising:
      84.1 36 covered carpark spaces (within the basement), consisting of 18 resident spaces and
           18 visitor spaces (including 1 disabled space),
                                                                                 Page 13 of 24

Page 14

                                                                                         2003/220653

      84.2 Two (2) uncovered carpark spaces (towards the frontage of the development).
85.   All carparking areas shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      and AS/NZS 2890.6:2009 with a minimum head clearance (headroom) at any point of 2.2m on
      the vehicle paths and 2.5m within disabled spaces and adjacent shared areas.
86.   All carpark spaces shall be clearly defined by line marking each space and by providing
      appropriate signage defining the space usage purpose as indicated on plan number A-WD-2-
      1-10 M dated September 2008 by DBI Design. To this extent:
      86.1 One (1) of the single carpark spaces within the basement must be line-marked and
           signed specifically as a disabled carparking space.

      86.2 The tandem carpark spaces within the basement must be line-marked and signed so
           that visitors can only park behind the car parking space assigned to the resident that
           they are visiting.

      86.3 One (1) of the uncovered carpark spaces (towards the frontage of the development)
           must be line-marked and signed specifically as a disabled carparking space.

      86.4 One (1) of the uncovered carpark spaces (towards the frontage of the development)
           must be line-marked and signed specifically for “Service Vehicles” between the hours of
           6am to 6pm.

      86.5 The uncovered carpark spaces (towards the frontage of the development) must be line-
           marked and signed specifically for “Visitor Parking Only”.

      86.6 All carparking spaces as defined shall remain as parking spaces and are not to be
           converted to storage or enclosed.

        The requirements of this condition are to be included in the Community Management
        Statement for the development.
87.   Access to the visitor car parking in the basement shall be controlled via an intercom system,
      which ensures that these spaces are available to visitors.
88.   A small sign shall be installed within the site (in a clearly visible location for all vehicles to see
      near the entry gates) to advise visitors that visitor car parking spaces are provided within the
      basement carpark and to use the intercom system to contact the manager or the unit they are
      visiting to enable entry to the basement and to these spaces.
Vegetation Protection
89.   All trees to be retained shall be clearly defined on all drawings and clearly marked on site to
      prevent any damage occurring to these trees.
90.   Any works required within the drip zone of any trees to be retained shall be carried out by
      hand, not by machinery.
91.   The internal driveway (or any other form of hard pavement for that matter) within the drip zone
      of any trees on site to be retained shall be designed to allow the flow of water through the
      pavement or be designed to direct stormwater runoff to the trees root system. To this extent
      the uncovered visitor spaces towards the frontage of the development may be able to
      incorporate Grass Rings or a similar device that allows water penetration.
92.   All pavements shall be constructed so as not to damage the root system of any trees to be
      retained and in this regard temporary fencing shall be provided around the trees during
      construction to help protect them.



                                                                                        Page 14 of 24

Page 15

                                                                                       2003/220653

93.   Plans shall be submitted to the Council for approval that clearly show the type and extent of
      pavements proposed, how they comply with the above conditions and also illustrating any
      temporary fencing to protect the trees prior to obtaining a Development Permit for Operational
      Works.
Frontage Works
94.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Serenity Close frontage of the site (if not already provided) in accordance with Planning
      Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds.
95.   A new 1.5 metre wide concrete path shall be constructed along the Serenity Close frontage of
      the site (if not already provided) in accordance with Council’s design standards and to an
      alignment that protects any significant vegetation or any underground services.
96.   All paths shall be designed and constructed to ensure pedestrian safety using non-slip
      materials and to produce an evenly graded surface finish.
Stormwater Drainage
97.   A stormwater management plan shall be prepared by a RPEQ, specialising in stormwater and
      water quality management incorporating the principles of the Environmental Management Plan
      for the Settlers Cove Development 23118 DA, that demonstrates water reuse strategies,
      infrastructure capacity and effective treatment methodology. The use of rainwater harvesting
      tanks for irrigation purposes shall be incorporated in the overall design plans. These plans
      shall be submitted to Council for approval prior to obtaining a Development Permit for
      Operational Works.
98.   All stormwater drainage shall be collected on site and discharged so there is no net increase in
      stormwater runoff from the site.
99.   On site swale drains will be required to capture and direct any overland stormwater runoff to
      the Infiltration Pits proposed on site. These swales shall be sized to carry a 3-month storm
      event and plans detailing their capacity, location, length, width and grades shall be submitted
      to Council for approval.
100. To ensure polluted run-off does not enter any of the proposed Infiltration Pits, and ultimately
     the water table, stormwater run-off from the carparking areas and the driveways shall have the
     first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor (or similar
     device) provided on site prior to discharging into the infiltration pits.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.

      All other clean stormwater, such as roof water, can be collected on site and discharged directly
      into the infiltration pits, bypassing the grease/oil arrestor.

      A Development Permit for Building Works shall not be granted until a Development Permit or
      Operational Works has been issued in regard to the drainage scheme.
101. All site stormwater drainage shall be by means of a gravity system.
102. Plans of the entire on site drainage design shall be prepared by a Registered Professional Civil
     Engineer and submitted to Council prior to obtaining a Development Permit for Operational
     Works.
Sewer Mains
103. The site shall be connected to Council’s existing sewerage reticulation systems and be
     constructed in accordance with Council’s standards and requirements at no cost to Council.

                                                                                      Page 15 of 24

Page 16

                                                                                      2003/220653

Town Water Supply
104. The site shall be connected to Council’s existing town water supply and be constructed in
     accordance with Council’s standards and requirements at no cost to Council.
105. Each water connection to the water reticulation system shall extend to the property boundary
     and be metered. Where multiple units are served by a single service, multiple water meters to
     each individual unit and for the body corporate shall be installed. All fees for the supply of
     water meters shall be paid to the Council.
Service Easements
106. All existing and proposed easements within the site shall be shown on the plans submitted for
     Operational Works / Building Works approval.
107. Registered easements shall be created over any Council service within the subject site in
     accordance with Council’s requirements (if not already created) and at no cost to Council.
      The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
      the Title Deed and the easement documents will be lodged at the Land Titles Office and any
      additional Titles Office forms or requisitions requiring the consent of Council will be attended to
      promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

      Any changes required by Council’s Solicitor must be corrected immediately.

Earthworks
108. Plans and details outlining the extent of earthworks required on site and any trees to be
     retained shall be submitted to Council for approval prior to obtaining a Development Permit for
     Operational Works.
109. All major excavations (including the basement and driveways) shall be shored to prevent
     batters extending into areas and vegetation that are to be retained. All trees to be retained
     should be adequately tagged to Council’s satisfaction and enclosed with a barrier fence to the
     drip line to prevent damage.
110. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
     determine the soil classification, establish whether any measures are required to protect the
     stability of adjoining buildings and/or structures and/or land, and make recommendations on
     the type of foundation system(s) best suited for the proposed development. The
     recommendations of this report shall be incorporated into the design and construction of the
     proposed development.
111. Earthworks shall not cause the ponding of water on any adjoining lands or the blockage of, or
     interference with, any natural watercourses or overland flow path.
Erosion and Sediment Control
112. Any person acting on this permit shall prevent erosion and sediment export from leaving the
     site. Site control measures such as silt fencing, controlled gravel access to the site, controlled
     disposal of waste, catch drains, and temporary infiltration or sump pump-outs will be
     necessary.
      Plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
      The applicant is advised that a simple silt fence by itself is unlikely to meet the objectives of
      best practice for Erosion & Sediment Control.


                                                                                     Page 16 of 24

Page 17

                                                                                   2003/220653

Construction Issues
113. A Construction Management Plan addressing all construction phases, including traffic
     management, shall be prepared and submitted to Council for approval prior to obtaining a
     Development Permit for Operational Works.
      The report should aim to address every foreseeable problem that could occur during the
      construction process and include recommendations on how these can be overcome or
      minimised. The report shall be to the reasonable satisfaction of the Manager Land
      Development.
Community Management Statement Requirements
114. The Applicant and all future owners of the site shall comply with the Environmental
     Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with the
     EMP shall be referenced in any community management statement over the site.
115. The Fire Management Plan is to be implemented by the Developer and future owners of the
     site and is to be referenced in any community management statement.
116. The owners of the allotment shall not object to the construction of a boardwalk along Noosa
     Inlet beside allotment 7 for the purpose of providing public access. Any Community
     Management Statement established over any allotment shall also detail that the body
     corporate will not object to the provision of a boardwalk as detailed above.
General
117. A Registered Professional Engineer of Queensland shall certify engineering drawings and
     specifications for all engineering works, which shall be submitted in conjunction with an
     application for a Development Permit for Operational Works.
118. Any damage caused to any public utility during the course of construction shall be repaired to
     Council’s standards and at no cost to Council.
119. Any alteration of any public utility or other facilities necessitated by the development of the
     land or associated construction works external to the site shall be at no cost to Council.
120. The transportation of all materials to and from the site shall be undertaken in a manner such
     that no particle matter escapes onto a public road. All vehicles carrying materials either to or
     from the site shall be covered to prevent materials including dust being windblown from the
     vehicle.
Building
121. To meet the needs of people across a range of abilities and ages and be adaptable for the
     changing needs of people over time, at least 3 dwelling units shall include the following:
      121.1   All doors to habitable rooms, kitchen, laundry and bathrooms are a minimum of
              870mm wide; and
      121.2   Hallways are a minimum of 1.2m wide; and
      121.3   All entries into the dwelling unit and internal doorways, have no more than a 10mm
              change in level, other than access to balconies where building code sill weatherseal is
              to be maintained. A ramp can be retrofitted to provide access in accordance with
              Australian Standards 1428.1 – 1993 Design for Access and Mobility Chapter 7
              Doorways, Doors and Circulation Space at Doorways – Ramped Threshold; and
      121.4   Has an accessible toilet and bathroom, complete with reinforced walls, that can be
              reached along an accessible path; and
      121.5   A sliding door or window, no higher than 600mm from the floor is provided in at least 1
              bedroom to allow for a seated person to look out of and open and close the sliding
              door or window; and
                                                                                  Page 17 of 24

Page 18

                                                                                     2003/220653

      121.6   A minimum of one power point to each habitable room is placed up from the floor
              (minimum 600mm) and out from the corner (minimum 500mm) to facilitate disabled
              access.
122. The following shall be complied with the development of the site:
      122.1   There is to be no uncontrolled discharge of water onto the slope;
      122.2   Stripping of vegetation for construction purposes should be minimised. If vegetation is
              destroyed it should be reinstated immediately after construction is completed;
      122.3   The recommendations of all Golder Associates Pty Ltd reports on slope stability over
              the Settlers Cove site are to be adhered to for the design, construction and
              supervision of the development;
      122.4   Additional load due to fill, construction equipment or stockpiled materials should not be
              located on the dune slope;
      122.5   Vibration monitoring shall be carried out by the geotechnical engineer and appropriate
              action taken should vibration effects be a concern;
      122.6   A condition survey is to be carried out of adjoining buildings, structures and services
              prior to any demolition works or construction works taking place on site. If distress
              already exists, a photographic survey shall be undertaken, the distress measured and
              a plan to monitor changes to distress shall be implemented. A copy of this report is to
              be submitted to Council within 5 business days of survey and prior to construction
              work proceeding;
      122.7   Deleted.
      122.8   A RPEQ shall be engaged by the client to oversee any piling works.
      122.9   The construction of the whole of the foundations is to be carried out in accordance
              with the recommendations of the applicant’s consulting Geotechnical engineer,
              including any on-site supervision required by these recommendations. Such works
              shall only be carried out during dry weather conditions and if there is a risk of sand
              movement occurring, all work shall be suspended until such steps, approved by the
              applicant’s Geotechnical engineer have been taken to ensure that no further slippage
              will result.
123. A verification survey of the building is to be carried out by a Licensed Surveyor and a
     certificate lodged with Council at completion of the work confirming compliance with the
     maximum building height above natural and finished surface, required by the provisions of the
     Planning Scheme.
Environmental Health
124. The developer shall comply with the Refuse Management Plan Reference Ryter Planning RCU
     1005.
125. The developer must provide a suitably screened imperviously paved area large enough for all
     refuse and recycling containers. A wash down area is required with a cold-water tap, hose and
     drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry
     to the sewerage system.
126. Street litter bins to a design approved by Council, shall be supplied and installed at the
     developers expense at agreed locations.
127. Refuse chutes must be provided, in accordance with Council’s Policy for Refuse Chutes and
     Accessories in Multi Storey Buildings.




                                                                                    Page 18 of 24

Page 19

                                                                                      2003/220653

128. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
     located in a manner which prevents a noise nuisance beyond the subject land in accordance
     with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
     fines apply for such offences.
129. Air conditioning units shall be located in a manner which prevents noise nuisance beyond the
     subject land in accordance with the nuisance provisions of the Environmental Protection
     Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. On the spot fines
     apply for such offences.
      An occupier of premises where there is air-conditioning equipment must not use or allow the
      use of the equipment -
      129.1       before 7am or after 10pm on any day if it makes noise or causes noise to be made
                  of more than the higher of the following -
                  -      40 dB(A)
                  -      3 dB(A) above the background noise level from 7am to 7pm on any day if it
                         makes noise or causes noise to be made of more than the lower of either of
                         the following -
                  -      50 dB(A)
                  -      5 dB(A) above the background noise level
      129.2       from 7pm to 10pm on any day if it makes noise or causes noise to be made of
                  more than 3 dB(A) above the background noise level.
130. The area is in close proximity to vector breeding areas and the following conditions are
     required.
      130.1     All windows and doors shall be screened with mosquito-proof gauze not coarser
                then 1mm aperture to prevent the ingress of mosquitoes. It should be noted that
                these screens will not necessarily restrict the ingress of Biting Midge due to their
                reduced size.
      130.2     The developer is to undertake a public education/awareness program for all persons
                visiting the premises on the potential health risk of and ways to prevent being bitten
                by Mosquitoes and Biting Midge.
      130.3     A notation shall be added to Council’s records whereby any applicant undertaking a
                health/property search is advised that this premises is located near major breeding
                areas of Mosquitoes and Biting Midge and may be subject to associated problems.
131. All rooftop terrace and accessway balustrades and upstands are to be constructed of open or
     transparent materials.
132. The rooftop terrace shall not be covered with any fixed structure or the like.
Additional Condition - Access & Services Easement (1/7/2010)

133. An access and services easement shall be created over the proposed shared driveway that
     gives access to the basement carparking of Lot 8 on SP195871 through Lot 7 on SP195871
     and over any services that supply Lot 8 on SP 195871 but stand within Lot 7 on SP195871.
     The easement shall be of sufficient width to encompass the whole of the driveway and any
     manoeuvring area (with the width being increased where necessary to accommodate passing
     lanes or to provide the specified clearances from cut/fill batters) and shall be of sufficient width
     to permit maintenance and replacement of the services. The easement shall be to the benefit
     Lot 8 on SP195871 and burden Lot 7 on SP195871.



                                                                                      Page 19 of 24

Page 20

                                                                                        2003/220653

      In this regard, plans submitted for Operational Works approval shall accurately show the
      location of the easement.

      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

      Any changes required by Council’s Solicitor must be corrected immediately.

      Should the subject site (Lot 7 on SP195871) be amalgamated with the adjoining site (Lot 8 on
      SP195871) the requirement for the access and services easement shall not apply.

5     REFERRAL AGENCY CONDITIONS
Not applicable.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in Item 4
Assessment manager conditions, condition 1.

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
      under the Disabled Discrimination Act (DDA) in regard to the installation of disabled access
      and the provision of disabled facilities, and that access to this building and the provision of
      sanitary facilities may need to comply with the requirements of Section D Part D3 and Section
      F Clause F2.4 of the Building Code of Australia.
2.    The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from
      making noise from:-
      2.1.   Monday to Saturday, before 7:00am or after 6:30pm
      2.2.   Sunday or public holiday, at any time.
      A maximum penalty of $1,500 applies to an offence under these provisions.
3.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
      it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
      course. On the spot fines apply for such offences.
4.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service levy is required to
      be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
      form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
      that confirms that the requirements of the Act have been satisfied. A statutory declaration
      outlining the cost of the operational works must be submitted to Council with the lodgement of
      any application for operational works over the site.
5.    A Registered Professional Engineer of Queensland shall certify engineering drawings and
      specifications for all engineering works, which shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
                                                                                       Page 20 of 24

Page 21

                                                                                      2003/220653

6.    All designs for engineering works involving the construction of pavements, kerb and channel,
      vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
      reticulation shall be prepared in accordance with the requirements of Council's Engineering
      Design Standards, shall reference where applicable to Council’s Standard Drawings and shall
      incorporate best engineering practice.
7.    The applicant is informed that this development permit will trigger a revised Infrastructure
      Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for
      the estimated amount of $38,706.00 and is subject to variations in the Consumer Price Index,
      All Groups Brisbane from March 2010 until the date of payment. An Infrastructure Charge
      Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
8.    Please        contact      Council's     Infrastructure    Charges      Officer      (email:
      [email protected]) a minimum of 5 business days prior to payment of the
      infrastructure contributions and/or charge notice so a payment advice detailing the amounts
      applicable at the time of payment may be issued to accompany the payment.
Additional Advisory Note (1/7/2010)

9.    The applicant is advised that development contributions and infrastructure charges applicable
      to this development approval have been based on the following Uses Class/ Uses and
      applicable quantities:-
                 Existing Development                        Approved Development
       Existing Use Class /                           Approved Use Class Approved
                             Existing Quantity
       Use                                            / Use              Quantity
                             Vacant Land
                             (credit    for     1
                                                      Multiple Housing -
                             Detached     House                                20 x 3 Bedroom
       Detached House                                 Type      4      –
                             per              Lot                              Units
                                                      Conventional
                             Reconfiguration
                             23118 DA)
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable.
9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable.




                                                                                     Page 21 of 24

Page 22

                                                                                         2003/220653


10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required             Subject of the required Development Permit
 Development Permit for Building Works           Multiple Dwelling (20 Dwelling Units)
 Development        Permit   for   Operational   Landscaping, car parking and access, frontage
 Works                                           works, stormwater disposal, sediment and erosion
                                                 controls filling of the site, roadworks, sewer
                                                 reticulation (including new mains, relocations,
                                                 diversions, pump stations and rising mains), water
                                                 reticulation, earthworks;

11     SELF ASSESSABLE CODES

Not applicable.
12     SUBMISSIONS

Not applicable.

13     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

14     OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Decision Notice History
4 November 2004                    Original Decision Notice
24 August 2005                     Compiled Decision Notice
1 July 2010                        Approved Change to Conditions
                                   1,5,10,77,78,81,82,83,84,85,86 &
                                   110 and Advisory Notes 7 & 8,
                                   addition of Condition 133 &
                                   Advisory Notes 9 and extend the
                                   relevant period
Yours faithfully,




Denis Wallace
Senior Development Planner




                                                                                         Page 22 of 24

Page 23

                                                                                                     2003/220653


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
   (3) If a person withdraws a submission before the                mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.

1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                    Page 23 of 24

Page 24

                                                                                              2003/220653

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 24 of 24

Used in these records

About this file

File size
111 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23176DA Change a Decision Notice [As Published].pdf · 111 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.