23176DA Change a Decision Notice [As Published] · 132003.220653.3
2003/220653
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
Should the subject site (Lot 7 on SP195871) be amalgamated with the adjoining site (Lot 8 on
SP195871) the requirement for the access and services easement shall not apply.
5 REFERRAL AGENCY CONDITIONS
Not applicable.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in Item 4
Assessment manager conditions, condition 1.
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
under the Disabled Discrimination Act (DDA) in regard to the installation of disabled access
and the provision of disabled facilities, and that access to this building and the provision of
sanitary facilities may need to comply with the requirements of Section D Part D3 and Section
F Clause F2.4 of the Building Code of Australia.
2. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from
making noise from:-
2.1. Monday to Saturday, before 7:00am or after 6:30pm
2.2. Sunday or public holiday, at any time.
A maximum penalty of $1,500 applies to an offence under these provisions.
3. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
course. On the spot fines apply for such offences.
4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service levy is required to
be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
that confirms that the requirements of the Act have been satisfied. A statutory declaration
outlining the cost of the operational works must be submitted to Council with the lodgement of
any application for operational works over the site.
5. A Registered Professional Engineer of Queensland shall certify engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
Page 20 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23176DA Change a Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 111 KB (small file)
- File type
No other editions are linked here.