EGX_PROD_n6243313_115_Eumundi_Noosa_Rd,_Noosaville_L30_SP170751
Attached to the e-mail Referral Agency Response - MCU18/0097.
4
Existing access tracks must be re-instated, repaired or maintained if they are damaged
during construction or other activities.
Energex will require the Developer / owner to supply and install gates where fencing
prohibits access to and along the easement area. To enable travel along the easement
at anytime the gates must be series locked with an Energex padlock. Both the padlock
and a design drawing of an acceptable gate will be provided by Energex.
Lighting structures are not permitted in the easement without prior written consent of
Energex. Lighting designs for proposed developments (e.g. road, carparks etc) on the
easement are likely to require reduced height structures. Please submit detailed design
to Energex for approval. These drawings must clearly show the following;
a. Proposed height of the lighting structures and the ground level at the
structure base,
b. Relative (to lighting structures) ground levels at Energex structures (towers,
pole etc) either side of the lighting structures, and
c. The location of the Energex structures in relation to the proposed lighting
Pools and structures (including lighting structures) or metal fences are not
permitted to be installed on or near Energex easement without prior approval or
notification.
Rubbish, materials and / or tall equipment such as cranes and excavators are
not permitted to be stored or used on the easement.
Excavations or mounding of material under or close to conductors or Energex
structures is not permitted.
Energex must be notified of construction on or near the easement, conductors
or structures prior to commencement of construction.
All construction work must be clear of the easement unless construction risk
hazard is identified. High voltage clearances must be maintained prior to
construction commencing.
Warning signs may be required during and after construction.
Consideration must be given to the type of vegetation planted in Park Areas
within and near the Energex easement. Any proposal for landscaping on the
easement must have prior approval from Energex. Please submit the relevant
landscaping design to Principal Mains Design Engineer for approval. When
considering landscape designs the planting of trees must be kept to the edges of
the easement and not under any overhead conductors. When mature, plants or
trees must not grow in excess of 3.5 metres in height. If pertinent the Energex
Guide to “Powerline Friendly Plants” will be enclosed, please refer to this Guide for
recommended species.
At all times the following clearance must be maintained from the top of any
machinery moving in the vicinity of energised conductors:
132kV and 110kV conductors – 4.5m minimum clearance
33kV and 11kV conductors – 3m minimum clearance
Reference: HBD 6243313
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals