MCU Decision Notice

of 12

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                       MCU16/0043


      Measurement of Noise
8.    Measurement of sound pressure levels (adjusted for tonality and impulse) must be in
      accordance with either: (a) Australian Standard AS1055.1 “Acoustics–Description and
      measurement of environmental noise – General procedures”, or (b) The relevant “Noise
      Measurement Manual” as provided by the Department of Environment and Heritage
      Protection.
9.    A qualified person is considered to be either: (a) a Registered Professional Engineer of
      Queensland, or (b) an environmental consultant with a minimum of 3 years current
      experience in the field of acoustics.
      Acoustic Advice & Design
10.   It is highly recommended that the developer seek the advice and design input of a
      qualified acoustic consultant at the plan development stage to ensure the development
      does not cause a noise nuisance under the Environmental Protection Act 1994. Attention
      should be given to the following (but not limited to) :
           •      building design and construction
           •      design, selection and installation of fixed plant and equipment
           •      the location of air conditioning and heating units, refrigeration plant, pumps,
                  mechanical exhausts and plant rooms etc
           •      the use of acoustic enclosures/screens around noisy plant and equipment
           •      operating times
      Environmental Protection
11.   The development should be undertaken in a manner that causes no unlawful
      environmental nuisance under the Environmental Protection Act 1994 by the creation of
      excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or other
      releases to the environment.
12.   In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or other prescribed contaminants should not to be
      released to or be placed where it could reasonably be expected to move into a roadside
      gutter, storm water drain or a watercourse. On the spot fines apply for such offences.
      Infrastructure Charges
13.   This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
      accordance with Council’s “Charges Resolution” made pursuant to the Sustainable
      Planning Act 2009 and in conjunction with the State Planning Regulatory Provision
      (Adopted Charges).
7.    PROPERTY NOTES

Not Applicable.

8.    PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

Not Applicable.




                                                                                    Page 9 of 12
Log in to download the original file

MCU Decision Notice.pdf · 314 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.