J K L M N O P Q
950 4860 4610 4100 4820 2380 920
site boundary 1 1 1
site boundary
400.04 400.05 400.07
con01 roof level
RL36.350
first floor ceiling
450
NGL + 8.0m RL35.900
master ensuite wir her master bedroom
2700
first floor level
rnd01 RL33.200
rnd01 gls01
outdoor dining
3325
guest room living
ground level
RL29.875
3500
lower ground level
RL26.375
building footing shown indicative only
1 Section 04
200.00 1 : 100
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step up code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules low lvl low lvl + 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey
* refer finishes schedule
prior to setting out the new work. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels.
material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0448
aca C 13/12/2024 SD consultant coordination 22 / 512 David Low Way, Justin + Kylie Collum sections SD 400.03 F SCALE As indicated
aca D 20/12/2024 SD client review Castaways Beach QLD 4567
A3
section 04
aca E 12/02/2025 SD issue for pricing
aca F 03/04/2025 SD client review
schematic design 1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.