Original source · versioned page text
Appendix E - Code Compliance Reports
From the archive REC14/0005 Reconfiguration of a lot - 178 Eumundi Noosa Road, Noosaville. File date in the archive: 2014-04-04 12:20.
RECONFIGURING OF A LOT CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
O24 S24.1 A/S Alternate Solution – to the extent required, vegetation
Buildings and other structures do not have All lots include a building envelope that will be ultimately cleared in accordance with Condition
a significant adverse impact upon the enables buildings and structures to be 1 of previous operational works approvals for clearing
visual amenity of surrounding areas. sited so they do not— vegetation (Council Ref: OPW12/0257).
a) protrude above ridgelines; or
b) result in the unnecessary removal of
vegetation from the site.
OPEN SPACE
O25 S25.1 N/A Not applicable – refer to S25.2.
Public open space is design and located A minimum of 10% of the total site area, is
to— provided as public open space; or
a) provide for a range of recreational
settings and accommodate adequate and S25.2 Complies – can be implemented through preparation of
appropriate facilities to meet the needs of Park contributions are paid in accordance an Infrastructure Charges Notice.
the community; with PSP12 Public Open Space
b) provide a range of safe and easily Contributions; and
accessible recreational opportunities for
the community, except where dedicated S25.3 N/A Not applicable – refer to S25.2.
for conservation purposes; A park has direct road frontages of a
c) contribute to the legibility, accessibility minimum of 25% of the total allotment
and character of the locality; boundary of the park to provide physical
d) create attractive environment settings access and visibility; and
and focal points;
e) facilitate appropriate measures for S25.4 N/A Not applicable – refer to S25.2.
stormwater and flood management; Recreational facilities (including
f) enable the retention and protection of playgrounds, pergolas, barbeques etc.)
significant vegetation, wetlands, within a dedicated open space area are
watercourses, drainage lines and other setback a minimum of 30m from the top of
native habitat areas, their associated the bank of a watercourse and 10 from
buffers and linkages/corridors and natural the top of the bank of a drainage line; and
and cultural features; and
1 Solution: = Acceptable Solution Appendix E
A/S = Alternative Solution Code Compliance Reports
N/A = Not applicable to this proposal
Gateway Drive, Noosaville Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original