Council archive · source document
2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (35.2 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 81 pages
Page 2
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Document Verification
Job Title RACV Noosa Resort – Proposed Eco Resort Extension
Job Number 22366
Document Title Site Based Stormwater Management Plan
Document Control
Revision
Date Document Author Reviewer
No.
04.06.2019 Site Based Stormwater Management Plan 00 B Plunkett M Van Itallie
11.09.2019 Site Based Stormwater Management Plan 01 J Hewitt M Van Itallie
15.06.2022 Site Based Stormwater Management Plan 02 T Mathew M Van Itallie
04.07.2022 Site Based Stormwater Management Plan 03 T Mathew M Van Itallie
T Mathew /
14.12.2022 Site Based Stormwater Management Plan 04 M Van Itallie
A Mallard
13.07.2023 Site Based Stormwater Management Plan 05 T Mathew R Stanford
17.07.2023 Site Based Stormwater Management Plan 06 T Mathew R Stanford
21.07.2023 Site Based Stormwater Management Plan 07 T Mathew R Stanford
Approval for Issue
Name Signature Date
Theres Mathew
21.07.2023
Rawdon Stanford 21.07.2023
© Document copyright of ADG Engineers (Aust) Pty Ltd
This document is and shall remain in the property of ADG. The document may only be used for the purpose
for which it was commissioned and in accordance with the Terms of Engagement for the commission.
Unauthorised use of this document in any form whatsoever is prohibited.
To the extent permitted by law, ADG expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. ADG does not admit that any action, liability or claim exist or be available to any third
party.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 2
Page 3
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Contents
EXECUTIVE SUMMARY 5
1 INTRODUCTION 7
1.1 Background 7
1.2 Background Information 7
1.3 Property Detail 7
2 EXISTING SITE 8
2.1 Existing Site Features 8
3 FLOODING 9
3.1 Flooding Considerations 9
4 STORMWATER INFRASTRUCTURE 11
4.1 Existing Infrastructure 11
4.2 Lawful Point of Discharge (LPD) 11
4.2.1 Existing LPD 11
4.2.2 Proposed LPD 11
4.3 External Catchment 11
5 STORMWATER QUANTITY ASSESSMENT 12
5.1 Proposed Development and Associated Issues 12
6 STORMWATER QUALITY ASSESSMENT 12
6.1 Treatment Objectives 12
6.2 Site Analysis and Design Strategy 13
6.2.1 Pre-Development Phase 13
6.2.2 Bulk Earthworks Phase 14
6.2.3 Construction Phase 14
6.2.4 Maintenance 15
6.3 Operational Phase Treatment 15
6.3.1 Bio infiltration basin 15
6.4 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank 15
6.4.1 Internal Demand 15
6.5 MUSIC Model 16
6.6 On-site Treatment Lifecycle Costs 18
6.7 Water Quality Monitoring 19
6.8 Maintenance 19
7 CONCLUSION 20
Figures
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22) 8
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 3
Page 4
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Figure 2 - Site Layout (as accessed from Nearmaps 20.04.2022) 9
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017) 10
Figure 4 – Treatment Train for Pre-Development 16
Figure 5 - Results for the Pre-Development Model 17
Figure 6 - Treatment Train for Proposed Development 17
Tables
Table 1 - Property Detail 7
Table 2 - South East Queensland (SEQ) Targets 13
Appendices
Appendix A Site Survey
Appendix B Architectural Drawings
Appendix C ADG Preliminary Plans
Appendix D Concept Rehabilitation Plan
Appendix E Noosa Shire Council Code Responses
Appendix F Noosa Shire Council Erosion Hazard Assessment
Appendix G Noosa Shire Council (Interactive Mapping)
Appendix H MUSIC Modelling Information
Appendix I Geotechnical Report
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 4
Page 5
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
EXECUTIVE SUMMARY
ADG Engineers (Aust.) Pty Ltd has been engaged by Aspect Architects to prepare a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) as
additional information in support of a Development Application for a Material Change of Use for a
proposed Eco Resort Extension to the current RACV Noosa Resort located at 94-142 Noosa Drive,
Noosa Heads QLD 4567.
The proposed development as shown in Aspect Architects plans issued on 30.06.2023 is for eight
(8) double storey eco resort style units, raised boardwalk footpath links and associated carparking.
The proposed application to Council also includes works involving converting an existing pond
internal to the RACV Noosa Resort site into a new pool. ADG make note that this existing pond does
not form part of an existing site-based stormwater treatment train nor provides further stormwater
detention management. The pool works is to form part of separate application submitted to Council
for building approval.
The report comprises of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
assessment is undertaken to determine the required stormwater treatment measures to be
implemented on site.
The stormwater quantity objective was to demonstrate that there are no impacts from storm events
up to and including the 1% AEP storm event. The purpose is to ensure that the existing infrastructure
and/or downstream properties are not adversely affected. Due to negligible increase in peak flows
from the subject site and the subject site being located close to the downstream waterway hence in
the lower portion of the regional catchment, it is considered unnecessary to include provision for
stormwater quantity management as the proposed runoff is intended to infiltrate into the existing sub-
surface utilising bio infiltration basin. The In-situ Constant Head Permeability Test using the Talsma-
Hallam Test method (per AS1547) undertaken by Tectonics Geotechnical & Environmental
Engineers has confirmed the hydraulic conductivity of the soil is capable to infiltrate the retained
water with an exfiltration rate of 115 mm/hr.
Currently no stormwater quality management measures are in place for the Eco Village subject site.
Stormwater treatment measures are proposed to be implemented on site in accordance with Industry
Best Practice, WSUD Engineering Guidelines and, Council’s Land Development Guidelines to
provide stormwater treatment for this site. ADG recommends the use of the following devices to meet
the water quality objectives identified within the SPP 2017 and Council’s WSUD Planning Scheme
Policies:
Combined 40kL Rainwater Tank (Reuse) and downpipes to convey the overflow to the bio
infiltration basin area.
60m2 bio infiltration basin that will permit flows to infiltrate into the subject sites sub-surface.
The eMUSIC model compares the pre and post-development stormwater pollutant residual loads in
Section 6.6 of this report. ADG advise the post-development pollutant residual loads are now below
the pre-development stormwater pollutant residual loads and that water is intended to infiltrate into
the sub-surface strata of the subject site through the drainage layer of the proposed bio infiltration
basin. This results in no increase in gross pollutants, total suspended solids, total phosphorus, nor
total nitrogen compared to the pre-development scenario.
To address the Noosa Shire Council’s RFI dated 6th April 2023, the following has been added to this
SBSMP:
The originally proposed 30m2 bio infiltration basin area is upsized into 60m2 surface and filter
area. Refer to Appendix C of this report for updated plans with bio basin details.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 5
Page 6
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
An In-situ Constant Head Permeability Test using the Talsma-Hallam Test method (per AS1547)
was undertaken by Tectonics Geotechnical & Environmental Engineers and confirmed that the
site has 0.6m sand clay topped over silty sand which is up to 1.7m deep. Saturated soil
permeability (Ksat) was assessed from the results and confirmed the rapid infiltration at the test
location with an ex-filtration rate at 115mm/hr. There are no ground water investigated at the
boreholes during the tests.
The in-situ saturated hydraulic conductivity results have been updated in the MUSIC model to
reflect the In-Situ Constant Head Permeability Test results. Refer Appendix H of this report for
updated MUSIC model details.
The overflow from rainwater tanks are proposed to be conveyed using down pipes and discharge
into bio basin area through localised 200mm deep vegetated swales, where the natural
topography falls away from the discharge point. The runoff from raised timber walkway will fall
directly to the natural surface below, which as demonstrated has adequate exfiltration properties.
In the post-developed MUSIC model, the timber walkway node is modelled using the parameters
for existing vegetated surface as agreed by NSC Assessment Officer (Leon Rowland from
Switchback Consulting on behalf of NSC). Further, it is not considered practical to capture water
run-off from a raised timber walkway structure. The bio infiltration basin has been oversized to
compensate for the water quality catchment area of the walkway structure.
All relevant standards and guidelines are addressed in this Stormwater Management Plan
including criteria from the Noosa Shire Council Planning Scheme Policies, Queensland Urban
Drainage Manual (QUDM) 2016, State Planning Policy (SPP) 2017 Plumbing and Drainage Code
AS3500.3 and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 6
Page 7
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
1 INTRODUCTION
1.1 Background
ADG Engineers (Aust.) Pty Ltd was engaged by Aspect Architects to carry out a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) and
any required referral agencies for a proposed Eco Resort Extension to the current RACV Noosa
Resort located at 94-142 Noosa Drive, Noosa Heads QLD 4567.
The purpose of this Stormwater Management Plan is to provide advice on the proposed development
about stormwater drainage, stormwater quality and quantity measures, and flooding. The required
infrastructure will be subject to the conditions attached to the Development Approval to be provided
by Noosa Shire Council and any nominated referral agencies.
1.2 Background Information
This report was compiled using information from the following sources:
‘Dial Before You Dig’ (DBYD) As-Constructed information;
NSC interactive mapping (Refer to Appendix G);
NSC flood and storm tide inundation mapping (Refer to Appendix G);
Detailed survey plan prepared by Skyline Surveyors (Refer to Appendix A);
Architectural drawings by Aspect Architects issued on 30.06.2023 (Refer to Appendix B);
Geotechnical Tests Results commences & completed on 12.04.2023 by Tectonic and
Google Maps Aerial Imagery.
1.3 Property Detail
The details of the property for the proposed development can be seen in Table 1 below.
Table 1- Property Detail
Title Lot 203 on SP267424, Lot 0 on SP203415 and Lot 3 on SP126203
Street Address 94 - 142 Noosa Drive, Noosa Heads QLD 4567
Total Site Area 63,839 m2
Developable Site Area 6167.7 m2 (Lot 3 on SP126203)
The location of the proposed development is demonstrated in Figure 1.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 7
Page 8
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
N
Subject Site
Development Site Area
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22)
2 EXISTING SITE
2.1 Existing Site Features
The subject site is currently occupied by the RACV Noosa Resort.
The site is bound by:
Noosa Drive to the east
Sanctuary Drive (internal road within RACV Noosa Resort) east of the development site area
Weyba Creek Bushland Reserve North, west of the development
Existing college buildings and ancillary structures internal to the site boundary to the east
and south; and
Existing college sporting ovals and Cooroy Creek internally to the west and south-west.
The site generally slopes from the east to the west at a grade of approximately 6%. The existing site
features can be seen in Figure 2.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 8
Page 9
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Location of existing
pond converted to
new pool.
Submitted as part
of separate building
approval
Subject Site
application to
Council
Development
Site Area
Figure 2 - Site Layout (as accessed from Nearmaps 20.04.2022)
The existing contours, surface levels and the location of the existing buildings are identified on the
survey plan drawing as attached in Appendix A of this report.
3 FLOODING
3.1 Flooding Considerations
Review of Councils interactive flood hazard overlay mapping has identified the subject site is located
within an area subject to flooding as can be seen in Figure 3. Any habitable buildings are to ensure
they are suspended above the existing surface with allowance for freeboard flood immunity reflective
of the nominated Council defined flood level.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 9
Page 10
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Developable
Site Area
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)
Furthermore, review of Noosa Shire Council’s 2019 Draft Planning Scheme Policy Coastal Hazards
mapping indicates the subject site is located within an area subject to Sea Level Rise HAT
inundation and Stormtide inundation 1% AEP events. Refer to Appendix G for Council flood
mapping plots regarding extents of the above-mentioned inundation events.
In response to Council’s information request, ADG note the proposed cabin lodge’s will be
suspended structures along with the walkways and carpark. The minimum habitable floor level for
the suspended cabins is RL3.4m AHD. Appendix G which illustrates the council flood mapping,
plots this defined flood event (DFE) extents at approx. RL2.4m AHD. Give the finished floor level
(FFL) is at minimum RL3.4m AHD, there is a minimum of 1.0m between the assumed DFE and FFL.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 10
Page 11
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
4 STORMWATER INFRASTRUCTURE
4.1 Existing Infrastructure
A Noosa Shire Council DBYD search and detailed survey identified the following stormwater
infrastructure within the vicinity of the subject site:
Existing 1050mm stormwater pipe and associated gully pit traversing the southern portion of 94
Noosa Drive (Lot 203 on SP267424) and the existing Sanctuary Drive Road via kerb and channel
adapters to the north-east of the proposed extension;
Existing Council stormwater infrastructure consisting of 375-525mm stormwater pipes and gully
pits external to 142 Noosa Drive (Lot 3 on SP126203) within the south-eastern roundabout.
Refer to Appendix A for the detailed survey for further information regarding the existing stormwater
infrastructure.
Note: A diversion swale exists within existing RACV Noosa Resort along the development sites
northern boundary internal to the resort development property. ADG refer reader to previous site
reporting documents for details.
4.2 Lawful Point of Discharge (LPD)
4.2.1 Existing LPD
Based on information gathered via survey and contour data, aerial imagery and site investigation it
has been determined that the development site discharges stormwater flows via overland flow
towards Weyba Creek.
4.2.2 Proposed LPD
It is proposed to maintain the existing ultimate lawful point of discharge being Weyba Creek to the
west. Any increased runoff because of the proposed development is anticipated to be infiltrated
onsite.
Refer to Appendix C for the Preliminary Layout Plans prepared by this office.
4.3 External Catchment
No significant upstream catchment directly acts on the developable site area, other than the carpark
extents beyond the boundary line. The area within Sanctuary Drive discharges to the existing council
infrastructure within the road via kerb and channel adapters, this it to remain unchanged.
Refer to Appendix A for the detailed survey for further information regarding the existing site
features.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 11
Page 12
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
5 STORMWATER QUANTITY ASSESSMENT
The aim of the stormwater quantity assessment is to ensure that the development shall impose no
adverse effects on downstream properties or receiving water bodies and that the conveyance of
flows will be in a safe manner with minimal risk of human endangerment as well as the following
objectives:
Address the need for stormwater quantity control measures.
Ensure there is no actional impacts from the subject site for events up to and including the 1% AEP
event.
Ensure proposed quantity control measures detain and convey flows in accordance with QUDM
(2017) minimum freeboard recommendations.
5.1 Proposed Development and Associated Issues
In this development, the developable site area leads to negligible increase in peak flows downstream
of the subject site and is located close to the downstream waterway being Weyba Creek, hence in
the lower portion of the regional catchment. It is anticipated that the bio infiltration basin drainage
system will allow for infiltration on-site of the additional flows which will permeate into the sub-surface
strata, hence it is considered unnecessary to include provision for stormwater quantity management.
6 STORMWATER QUALITY ASSESSMENT
6.1 Treatment Objectives
This assessment identifies issues relating to stormwater quality runoff and assesses possible
methods of treatment if required. The aim of this section of the report is to determine practical
approaches for achieving improvements in the quality of the stormwater run-off from the site that can
be readily implemented.
The SPP 2017 proposes criteria which apply to ‘high-risk’ development for stormwater. The criteria
include one or more of the following:
A Material Change of Use (MCU) for an urban purpose which involves greater than 2,500m2 of
land that:
will result in an impervious area greater than 25% of the net developable area; or
will result in six (6) or more dwellings
A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
2,500m2 and will result in six (6) or more lots; or
Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
The proposal includes an MCU for a land area of 2,500m 2 that will result in impervious area greater
than 25% of the developable area. Hence, the development is classed as ‘high risk’ for water quality
and the SPP 2017 applies.
The SPP 2017 suggests the development aims to:
Avoid or otherwise minimises adverse impacts on the environmental values of receiving waters,
arising from:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 12
Page 13
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
altered stormwater quality or flows, and
wastewater (other than contaminated stormwater and sewage), and
the creation or expansion of non-tidal artificial waterways, and
Demonstrate compliance with the SPP code - Water quality (Appendix 3).
Appendix 2 (Table B) of SPP 2017 suggests ‘Post Construction Phase – Stormwater Management
Design Objectives’ as:
Table 2 - South East Queensland (SEQ) Targets
Total Suspended Solids Total Phosphorus Total Nitrogen Gross Pollutants
(TSS) (TP) (TN) >5mm
80% Removal 60% Removal 45% Removal 90% Removal
Along with the SPP 2017, The Noosa Plan 2020 Water Quality and Drainage Code acceptable
outcome AO6.1 states that;
Stormwater runoff discharging into High Ecological Value waters as a result of development causes
no increase in gross pollutants, total suspended solids, total phosphorous or total nitrogen compared
to a pre-development scenario.
Since the development site slopes toward and discharges to Weyba Creek, no pollutants compared
to pre-development can be discharged from the site.
The objective is to provide the following:
Nitrogen and Phosphorous removal
Gross Pollutant and Suspended Solids Removal
All of the site’s impervious areas discharge to suitable treatment device/s
Treatment device selection criteria are to be in accordance with Industry Best Practice and,
WSUD Engineering Guidelines
6.2 Site Analysis and Design Strategy
6.2.1 Pre-Development Phase
An Erosion Hazard Assessment has been carried out for the proposed development – refer to
Appendix F for a copy of the completed Noosa Shire Council form. As a result of this assessment,
it was determined that the overall site is a ‘low’ risk.
Prior to construction commencing, the following erosion and sediment control measures will need to
be installed around the subject site to minimise disturbance and ensure the quality of runoff
discharging from the site is of an acceptable standard:
Sediment barriers to be installed on all entrances to downstream stormwater infrastructure (i.e.
gully pits);
Designation of transport routes through the site to minimise vegetation disturbance;
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 13
Page 14
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Maximise retention of existing vegetation to reduce soil disturbance and provide filter strip
treatment for runoff;
Install construction entry and exit shakedown areas;
Sediment fences are to be installed on the downstream boundaries of the subject site; and
Install dust control measures as required.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
Further to the above considerations, it is the developments intent to limit ground disturbing activities
to a minimum. Other than a portion of the carparking area, all structures and footpaths are proposed
to be suspended over the existing surface.
6.2.2 Bulk Earthworks Phase
During the bulk earthworks phase, the following erosion and sediment control measures will need to
be installed in addition to the aforementioned measures (Pre-Development Phase) to ensure there
is minimal disturbance to downstream receiving water bodies:
Construction chutes to control runoff over earthworks batters;
Construction of temporary bunds at the top of all earthworks batters to ensure runoff is directed
away from exposed batters;
Sediment basins to be constructed at low points within each stage of the proposed development;
Sediment fences to be installed on the downstream side of any stockpiles; and
Stabilisation of all batters upon reaching the finished earthworks levels.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.3 Construction Phase
During the construction phase of the development, there is a risk of sedimentation transport due to
disturbed land. The following erosion and sediment control measure will need to be installed in
addition to the aforementioned measures (Pre-Development and Bulk Earthworks Phases) to ensure
there is minimal disturbance and the quality of runoff is maintained to an acceptable standard:
Construction of temporary diversion drains to divert water to sediment basins;
Construction of temporary diversion drains to divert water to protect bio infiltration and treatment
devices as required;
Sediment barriers to be installed on all entrances to newly constructed stormwater infrastructure
(i.e. gully pits);
Sediment fences to be installed on the downstream side of any stockpiles and batters; and
Re-vegetation of all disturbed areas within two (2) weeks of completion.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 14
Page 15
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.4 Maintenance
All erosion and sediment control devices are to be maintained through the entire phase of the
development leading up to the operational phase. Erosion and sediment control devices will need to
be monitored closely throughout the entire project to ensure they are operating correctly and
efficiently. No erosion and sediment control devices are to be removed unless otherwise authorized
by a suitably qualified engineer or the site superintendent.
6.3 Operational Phase Treatment
Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
from the site. It is expected that sediment laden runoff and the erosion potential at the subject site
during the operational phase will be minimal. This is due to impervious developed areas in the form
of roofs, driveways and carparking. It is understood that the footprint of these impervious areas has
been reduced as much as practicable. The proposed landscaped areas will be maintained in a
manner that will minimise erosion.
Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
behind retaining walls, etc.
6.3.1 Bio infiltration basin
A minimum 60m2 surface area bio infiltration basin is proposed.
The bio infiltration basin will remove contaminants and sedimentation from stormwater runoff via
infiltration through layers of soil media. The basin is made of a 400mm filter media layer, a 100mm
transition layer and a minimum 200mm drainage layer located above the silty sand sub-strata. The
basin is to be vegetated, as per the Concept Rehabilitation Plan’s recommendations as attached to
Appendix D or with suitable plants listed in Table 19 of the bio infiltration Technical Design
Guidelines (Water by Design, 2014). These plants provide additional treatment and will prevent
clogging of the basin. Runoff within the bio infiltration area gradually infiltrates the soil layers,
assuming the in-situ soil of the area is sand. This assumption is based on the The In-situ Constant
Head Permeability Test using the Talsma-Hallam Test method (per AS1547) undertaken by
Tectonics Geotechnical & Environmental Engineers has confirmed the hydraulic conductivity of the
soil is capable to infiltrate the retained water with an exfiltration rate of 115 mm/hr.
6.4 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank
To satisfy Council’s code performance outcomes by reducing the need for mains water, the roof area
is to be connected to a rainwater tank with a minimum capacity of 5,000L in accordance with
Department of Housing and Public Works MP4.2 – Rainwater Tanks and Other Supplementary Water
Supply Systems. For the eight proposed cabins this equates to a total rainwater tank volume of 40
kL. Each rainwater tank is to be plumbed to be available for outdoor cleaning, washing machines
and toilet flushing in accordance with Council’s WSUD Planning Scheme Policies. Any overflow from
the rain water will be directed to down pipes and suspended pipes clamped on the raised timber
walkway leading into the bio-basin area.
6.4.1 Internal Demand
To calculate expected internal demand, the following assumptions were made:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 15
Page 16
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Toilet requires 25 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Laundry requires 21 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Peak occupancy of two (2) people per dwelling for the proposed 16x 2-bedroom units for the
holiday accommodation in accordance with Table 4.3 of the MUSIC Modelling Guidelines 2010.
Based on these assumptions the required volume for the internal demand component of the
rainwater tank is calculated as;
25 L/day (per person) + 21 L/day (per person) x 2 people per dwelling (peak) = 92 L/day
Daily demand (representing indoor use) = 92 L/d * 16 units = 1,472 L / day = 1.472 kL / day
6.5 MUSIC Model
The sites stormwater run-off for both the pre and post development were modelled using MUSIC
(version 6.3.0) and the water quality objectives for South East Queensland specified in the SPP 2017
of 80% TSS reduction, 60% TP reduction, 45% TN reduction, and 90% Gross Pollutants reduction.
Since the site slopes towards Weyba Creek which is a High Ecological Value waters, the post-
development pollutant discharge cannot be more than that of the pre-development discharge
according to The Noosa Plan 2020 Water Quality and Drainage Code.
Figure 4 – Treatment Train for Pre-Development
The pre-developed site situation is modelled in MUSIC and the arrangement is as given in Figure 4. The
Suspended Walkway node in the post development model has used the ewater parameters for the existing
vegetated surface as agreed by Noosa Council (Leon Rowland from Switchback Consulting on behalf of NSC).
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 16
Page 17
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Figure 5 - Results for the Pre-Development Model
Figure 6 - Treatment Train for Proposed Development
The treatment train effectiveness and residual loading of the post-development MUSIC model is presented in
Figure 7.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 17
Page 18
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Figure 7 - Results for Post-Development Model at Receiving Node
As shown above in Figure 7, a significant pollutant reduction is shown at the receiving node.
Based on the results from the In Situ Constant Head Permeability Test using the Talsma-Hallam Test
method (per AS1547) undertaken by Tectonics Geotechnical & Environmental Engineers, the site has
sand and sandy soil texture up to a minimum depth of 1.7m. Saturated soil permeability (Ksat) was
assessed from the results of in situ constant head test. The test site was pre-soaked using a minimum
15L of water prior to testing. It is noted that the pre-soak waters drained away rapidly, as would be
expected of typically sandy media. Refer to Appendix I for the test results.
Since the majority of the stormwater runoff from the roof will be re-used by the rainwater tanks and the
rest of the runoff is intended to infiltrate onsite through the bio-basin, no discharge will be proposed
from the site.
Currently it is assumed that a silty sand sub-strata will have a hydraulic conductivity of approx. of
3 .19 × 10−5 m/s, for a 60 m2 bio infiltration basin area, this equates to a yearly capacity of 60,356
𝑚3 /yr which exceeds the infiltration rate of the receiving node being 2.93 ML/yr (2,930 𝑚3 /yr). It is
therefore understood that the existing subgrade will have sufficient capacity to infiltrate all treatable
flows with no additional stormwater infrastructure required to be implemented to the downstream
waterway.
Details of the MUSIC model are attached within Appendix H for further information.
Refer to Appendix C for the Preliminary Layout Plans prepared by ADG.
6.6 On-site Treatment Lifecycle Costs
A lifecycle cost analysis is not a part of the scope of this report. All the recommended water quality
treatment infrastructure lies within the development site and it shall be maintained and serviced by the
owners of the development at no cost to Council.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 18
Page 19
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
6.7 Water Quality Monitoring
No water quality monitoring is proposed for this development at this stage due to the nature of the
development and the expected pollutant levels.
6.8 Maintenance
Maintenance of the SQIDs will be the responsibility of the owners of the development. The
maintenance should be carried out in accordance with the manufacturer’s recommendations.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 19
Page 20
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
7 CONCLUSION
In preparing this report, we have achieved all requirements for Site Based Stormwater Management
Plans as described in the State Planning Policy (2017), Noosa Shire Council Planning Scheme
Policies, Queensland Urban Drainage Manual (QUDM) 2016, Plumbing and Drainage Code
AS3500.3 and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 20
Page 21
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix A
Site Survey
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 22
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 23
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 24
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 25
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 26
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 27
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 28
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Page 29
Page 30
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix B
Architectural Drawings
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 31
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
B 24/10/22 DA RFI ZT
C 28/10/22 DA RFI ZT
D 10/11/22 DA RFI ZT
E 15/11/122 RFI ZT
F 02/12/22 RFI ZT
G 05/12/22 RFI ZT
H 18/05/23 RFI RESPONSE TB
I 30/06/23 RESPONSE TO 2ND RFI ZT
1
A65-07
65 SQM BIO RETENTION
AREA
18 CARPARKS
CABIN 1
10m WIDE BUSHFIRE ASSET EMT X
PROTECTION ZONE
EMT B
1
A65-09 RL 11.022
CABINS 14 & 15
4
2 A65-09
A65-09
RL 10.730 CABINS 2 & 3 RL 11.022
EMT A
CABINS 12 & 13
0
60 0
LOT 3
0
400
CABINS 10 & 11
3
A65-09
CABINS 4 & 5
RL 11.640
CABINS 8 & 9
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
CABINS 6 & 7 60
00 BOAQ 4487
RL 11.810
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
CONCEPT DESIGN
@
142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
DRAWING TITLE
SITE PLAN
N DATE SCALE @ A1 DRAWN CHECKED
30/06/23 1 : 250 ZT TB
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 21-0910_ A10-01 I
Page 32
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix C
ADG Preliminary Plans
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 33
01
X
X
02
03
04
TM
CIVIL
22366
X
X
SK01
17.05.23
15.06.22
03.06.19
13.07.23
T:1300 657 402
All intellectual property rights (including, without limitation, all
copyright and design rights) subsisting in the drawings and related
information belongs to ADG Engineers (Aust) Pty Ltd ("ADG").
TM
AM
Drawings or information are provided for general information
purposes only and may not contain the full details required for
CATCHMENT PLAN
ISSUED FOR APPROVAL
construction. ADG makes no warranties, either express or implied,
PRE DEVELOPMENT
ISSUED FOR APPROVAL
XISSUED FOR INFORMATION
XISSUED FOR INFORMATION
E: [email protected]
of merchantability and fitness of the drawings or data for any
ASPECT ARCHITECTS
particular purpose.
RS
NTS
ADG accepts no responsibility or liability for any loss or damage
Env ironmental Management ISO 14001:2015
caused to the recipient or any third party through use of the
Approval
NOT FOR CONSTRUCTION
PRELIINARY
drawings or related information in any way.
94-142 NOOSA DR, NOOSA DR
X
X
PRELIMINARY
TM
TM
TM
BP
W: www.adgce.com
Quality Assurance ISO 9001:2015 | Work Health Safety ISO 45001:2018
04
X
X
RS
AM
MVI
MVI
RACV NOOSA ECO RESORT
A
Legend
Catchment ID
Site Grade Direction
Stormwater Catchment B'dy
A
EX1
Page 34
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
ISSUED FOR
THE GENERAL APPROVAL
NOTES SHEET
NOT FOR CONSTRUCTION
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
B 24/10/22 DA RFI ZT
C 28/10/22 DA RFI ZT
D 10/11/22 DA RFI ZT
copyright and design rights) subsisting in the drawings and related
construction. ADG makes no warranties, either express or implied,
E 15/11/122 RFI ZT
ADG accepts no responsibility or liability for any loss or damage
F 02/12/22 RFI ZT
purposes only and may not contain the full details required for
All intellectual property rights (including, without limitation, all
information belongs to ADG Engineers (Aust) Pty Ltd ("ADG").
G 05/12/22 RFI ZT
of merchantability and fitness of the drawings or data for any
Drawings or information are provided for general information
H 18/05/23 RFI RESPONSE TB
caused to the recipient or any third party through use of the
I 30/06/23 RESPONSE TO 2ND RFI ZT
1
A65-07
drawings or related information in any way.
18 CARPARKS
CABIN 1
particular purpose.
10m WIDE BUSHFIRE ASSET EMT X
PROTECTION ZONE
EMT B
RL 11.022
CABINS 14 & 15
4
2 A65-09
A65-09
RL 10.730 CABINS 2 & 3 RL 11.022
LEGEND
EMT A Ex1
CABINS 12 & 13
Site Grade Direction
A
0
60 0
200 mm deep Stormwater
Swale (Vegetated) LOT 3
Existing Trees
Bio-infiltration Basin
0
400
CABINS 10 & 11
3
A65-09
CABINS 4 & 5
06 21.07.23 Issued For Approval TM RS
RL 11.640
CABINS 8 & 9 05 13.07.23
03.05.23
Issued For Approval TM RS
AM
04 Preliminary TM
03 14.12.22 Preliminary TM AM
02 29.09.2 Preliminary TM MVI
2
01 03.06.19 Issued For Approval BP MVI
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
CABINS 6 & 7 60
00 BOAQ 4487
RL 11.810
T:1300 657 402 E: [email protected] W: www.adgce.com
BUILDING DESIGNERS
Quality Assurance ISO 9001:2015 | Work Health Safety ISO 45001:2018
ASSOCIATION
Env ironmental Management ISO 14001:2015
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
Aspect Architects
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
RACV NOOSA ECO RESORT
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
94-142 RACV
NOOSA
NOOSADR, NOOSA
RESORT - ECO
PROJECT
RESORT
POST DEVELOPMENT
FOR
ROYAL AUTOMOBILE CLUB OF
CATCHMENT
VICTORIA
PLAN
CONCEPT DESIGN
@
94-142 142
NOOSA DR,
NOOSA DRIVE,
QLD 4567
NOOSA
NOOSA HEADS
DRAWING TITLE
CIVIL PRELIMINARY
TM SITEAM
PLAN RS
N
22366
DATE
TM
SCALE @ A1
NTS
DRAWN CHECKED
(at A1)
Catchment T
1:250
0 2 4 6 8 10 20 SK02
30/06/23
DRAWING No.
21-0910_ A10-01
1 : 250 ZT
ISSUE
06I
TB
Page 35
PROPERTY BOUNDARY
VEGETATED SWALE 'V' DRAIN.
NOMINAL 200MM DEEP, 1:4V BATTERS.
ARBORIST TO DETERMINE EXTENT OF
ROOT REMOVAL. HAND EXCAVATION AND
VACUUM SUCKER TRUCK REMOVAL OF
SOIL AROUND ANY STRUCTURAL TREE
ROOT ZONES.
DOWN PIPE CONNECTION PIT
AND SCOUR PROTECTION
DP
18 CARPARKS
60m2 INFILTRATION CABIN 1
IN-SITU
SUB-STRATA
10m WIDE BUSHFIRE ASSET
DP EMT X
PROTECTION ZONE
ABOVE GROUND RETAINING WALL
DP
TO AVOID GROUND DISTURBANCE EMT B
RL 11.022
DP
CABINS 14 & 15
VEGETATED SWALE 'V' DRAIN.
NOMINAL 200MM DEEP, 1:4V BATTERS.
ARBORIST TO DETERMINE EXTENT OF ROOT
REMOVAL. HAND EXCAVATION AND VACUUM RL 10.730 CABINS 2 & 3 RL 11.022
SUCKER TRUCK REMOVAL OF SOIL AROUND
ANY STRUCTURAL TREE ROOT ZONES. EMT A
CABINS 12 & 13
DP
LOT 3
DP
TYPICAL BIO-INFILTERATION SECTION DP CABINS 10 & 11
EXISTING SURFACE DP
EXTENDED RETENTION
0.2m 0.10m 0.40m 0.30m
CABINS 4 & 5
RL 11.640
FILTER MEDIA CABINS 8 & 9
TRANSITION SAND
DRAINAGE LAYER
DP
IN-SITU SANDY SUB-STRATA
115MM/HR INFILTERATION RATE
CABINS 6 & 7
RL 11.810
INFILTRATE TO NATURAL SOIL (SAND)
0 5 10 15m ISSUED FOR
SCALE 1:250
AT ORIGINAL SIZE (A1)
APPROVAL
Client Discipline Status Title
ASPECT ARCHITECTS CIVIL APPROVAL BIO-INFILTERATION BASIN -
04 21.07.2023 Issued for Approval TM RS Project Name Designed By Checked By Approved By
PRELIMINARY DETAILS
TM AM RS
03 13.07.2023 Issued for Approval TM RS
RACV NOOSA RESORT Project No. Drawn By Scale at A1
02 03.05.2023 Issued for Information TM AM
94-142 NOOSA DRIVE, 22366 TM 1:250
01 14.12.2022 Issued for Information TM AM T:1300 657 402 E: [email protected] W: www.adgce.com
Quality Assurance ISO 9001:2015 | Work Health Safety ISO 45001:2018 NOOSA HEADS QLD 4567 The concepts and information contained in this document are the copyright of ADG Drawing No.
00 28.09.2022 Issued for Information TM SQ Environmental Management ISO 14001:2015 Engineers (Aust) Pty Ltd. Use or copying of the document in whole or in part without the
Date Description By Chk
written permission of ADG Engineers (Aust) Pty Ltd constitutes an infringement of copyright. SK03 04
Do not scale drawings. If in doubt, ask!
Page 36
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix D
Concept Rehabilitation Plan
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 37
IMPORTANT:
DEVELOPMENT FOOTPRINT (LOT 3) ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
SITE AREA 5453m2
DEVELOPED AREA (LOT 3) 1797m2 AMENDMENT SCHEDULE
33%
REHABILITATION AREA: ISS DATE DESCRIPTION BY
TOTAL REHABILITATION AREA FOR LOT 3 & LOT 203 3141m2 A 29/06/23 REHAB. ZONE ZT
TOTAL REHABILITATION AREA FOR LOT 3 3041m2 B 30/06/23 RESPONSE TO 2ND RFI ZT
SPECIES FOR REHABILITATION ZONES
AREA OF CARPARK
(LOT 203) 171m2
AREA OF CARPARK
(LOT 3) 330m2
AREA OF BOARDWALK
(LOT 203) 17m2
ZONE 1
781m2
ZONE 2
ZONE 3 98m2 (Lot 203)
68m2 CABIN 1
ZONE 4 CABINS
357m2 14 & 15
CABINS
2&3
CABINS
12 & 13
ZONE 5
1,295m2
AREA OF BOARDWALK
(LOT 3) 349m2 CABINS
10 & 11
NOTE ON SPECIES SELECTION
• SPECIES SELECTION INCLUDES SPECIES FROM TECHNICAL DESCRIPTION FOR RE12.2.7 AND
•
RECORDED ON SITE AND SURROUNDS.
BUSHFIRE “SUITABLE” SPECIES CONSIDERED FOR ZONES WITH BUSHFIRE MANAGEMENT
CABINS
CONSTRAINTS (^ SPECIES IDENTIFIED BY BUSHFIRE CONSULTANT FOR ZONE 4). ROOF PLAN AREA OF CABINS 4&5
•
•
SPECIES WITH * DEFINED AS KOALA HABITAT/FEED TREE.
FINAL SPECIES PLANTING AND SELECTION DETERMINED BY PLANTING SUITABILITY AND
(CABIN 1 EXCLUDED BEING OVER CARPARK)
SPECIES AVAILABILITY. (LOT 3) 1118m2 CABINS
• INTENT IS TO MAXIMISE SPECIES DIVERSITY AND % GROUND/MID STOREY COVER AND
SUPPLEMENT WITH CANOPY/KOALA TREES. 8&9
• DETENTION BASIN PLANTING SPECIES IN ACCORDANCE WITH WSUD GUIDELINES (ALSO
SPECIES IN LOCALITY AND FROM RE12.2.7 TECHNICAL DESCRIPTION) AND TO BE MAINTAINED
(BUSHFIRE CONSULTANT ADVICE) TO 1M WHERE NECESSARY.
LEGEND
ZONE 2
CABINS 542m2 (Lot 3)
ZONE 1 – WETLAND/HEATHLAND REHABILITATION (NORTHWEST)
• NO PLANTING RESTRICTIONS. 6&7
• WEED CONTROL/MANAGEMENT.
• PLANTING WITH SPECIES APPROPRIATE TO RE12.2.7 AND LOCALLY
OCCURRING.
• INCLUDE KOALA FEED TREES.
TOOWOOMBA | BRISBANE | MOOLOOLABA
ZONE 2 – REHABILITATED SCREEN (SOUTH AND EAST) www.aspectapm.net
• DENSE PLANTING ALONG SOUTHERN AND EASTERN BOUNDARY WITH ABN 96 071 786 948 ACN 071 786 948
SUITABLE NATIVE SPECIES. BOAQ 4487
• MID TO HIGH STRATA SCREENING TO BE ACHIEVED.
• WEED CONTROL/MANAGEMENT.
• INCLUDE SCATTERED KOALA FEED TREES.
BUILDING DESIGNERS
ASSOCIATION
ZONE 3 – DETENTION BASIN GENERAL NOTES
• PLANTING WITH SPECIES RECOGNISED AS SUITABLE FOR DETENTION THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
BASINS. RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
• GRASS AND SEDGE SPECIES ABLE TO BE MANAGED (MAINTAINED AT SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
APPROPRIATE HEIGHT 1M AS NEEDED). THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
• PROVIDE HABITAT AND WATER MAINTENANCE FUNCTION. IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
ZONE 4 – BUSHFIRE (APZ) MANAGEMENT COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
• WEED CONTROL. DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
• GROUNDCOVERS AND LOW SHRUBS. PERMISSION OF ASPECT .
• RETAIN INDIVIDUAL TREES AS IDENTIFIED. PROJECT
• NO FURTHER TREE PLANTING. RACV NOOSA RESORT - ECO
ZONE 5 – BALANCE REHABILITATION AMONGST CABINS RESORT
• AREA OF INTENSE WEED CONTROL/MANAGEMENT (ESSENTIALLY ALL FOR
UNDERSTOREY IS NON-NATIVE AND WEED VINE ON TREES TO BE
TREATED).
ROYAL AUTOMOBILE CLUB OF
• DENSE PLANTING OF GROUNDCOVERS AND LOW SHRUB/MIDSTOREY VICTORIA
CONCEPT DESIGN
(I.E. COVER GROUND AND CONTROL WEED ESTABLISHMENT AND @
CREATE A FULLY VEGETATED GREENSPACE ADJACENT AND AMONGST
ELEVATED CABINS AND BOARDWALKS).
142 NOOSA DRIVE, NOOSA HEADS
• INTER-PLANTING WITH SMOOTH-BARK KOALA AND OTHER TREE QLD 4567
SPECIES. DRAWING TITLE
CONCEPT REHABILITATION PLAN
N DATE SCALE @ A1 DRAWN CHECKED
30/06/23 1 : 300 ZT TB
DRAWING No. ISSUE
21-0910_ A10-13 B
Page 38
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix E
Noosa Shire Council Code Responses
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 39
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Floodplain protection, immunity and safety - for AO1
development areas The finished flood level is not less than the minimum Development will comply
PO1 design levels specified in Table 8.2.6.4
Development provides that for all flood events up to and
including the DFE:
1. the safety of people on the site is protected; and
2. the risk of damage to property on the site is avoided
or minimised as far as practicable.
PO2 AO2 Development will comply
All lots have sufficient area that is above the DFE flood level The minimum area above flood level (flood free area) for
or where modelling is not available, the highest each lot, is in accordance with Table 8.2.6.5.
recorded flood level, to safely and adequately accommodate
the intended use.
Page 1 of 9
June 2021
Page 40
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO3 AO3
For reconfiguring a lot or operational works, development is Development areas are not filled to reduce flood risk. Development will comply
undertaken in a manner that ensures:
1. natural hydrological systems are protected from
erosion, scour or flood damage on the premises
or other premises;
2. natural landforms and drainage lines are
maintained to protect the hydraulic performance
of waterways and flood plain; and
3. development integrates with the natural
landform rather than modifying the landform to
suit the development as far as practicable.
PO4 AO4.1 N/A
For reconfiguring a lot, development does not compromise Development provides an effective evacuation route that
the safety of people resulting from the flood risk associated remains passable, with sufficient flood warning time, to
with events exceeding the DFE. enable people to progressively evacuate to safe areas
above the PMF in the face of advancing flood or waters for
events that exceed the DFE.
OR
AO4.2 N/A
Development provides for an area of sufficient size and
dimensions on site above the PMF that allows for safe
congregation and refuge.
Page 2 of 9
June 2021
Page 41
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO4.3 N/A
Where the existing roads servicing a development
provide a specific flood immunity (as determined by
the Qld Transport Road and Drainage Design Manual,
Queensland Urban Drainage Manual and the
Australian Rainfall and Runoff Guide), all lots
have access to the flood free area identified in Table
8.2.6.5 that matches the road immunity.
Page 3 of 9
June 2021
Page 42
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO5 AO5 Development will comply
For reconfiguring a lot or operational works, development In the Flood Hazard Overlay, or in areas otherwise
does not directly, indirectly or cumulatively alter the flood determined to be subject to the DFE or DSTE,
characteristics external to the development site for all development ensures:
flooding and inundation events up to and including 1. there is no loss of on-site flood storage
the DFE or DSTE based on:
capacity;
1. current climate conditions; and 2. all changes to level, depth, duration and
2. incorporating an appropriate allowance for the velocity of floodwaters are contained
predicted impacts of climate change. within the site for all flood events up to
and including the DFE based on current
climate and predicted impacts of climate
change at 2100;
3. there is no acceleration or retardation of
flows, or any retardation in flood warning
times, elsewhere on the floodplain and to
any overland flow paths; and
4. there is no increased stormwater ponding
on sites upstream, downstream or in the
general vicinity of the site.
Resilient building design and form AO6.1 Development will comply
PO6 Buildings are designed to integrate well with the street
Development ensures that building design and building form: level and the levels of adjoining properties to facilitate
1. accounts for potential flood risk; pedestrian flows and visual and physical connectivity
2. is resilient to flood events; and between the footpath and ground floors.
Page 4 of 9
June 2021
Page 43
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
3. maintains a functional and attractive street AO6.2 N/A.No under-storey proposed.
address appropriate to the intended use. Buildings incorporate appropriate screening to ensure
that any under-storey is not visible from the street,
where such screening does not impede flood water
flows.
AO6.3 Development will comply
Residential buildings minimise risk from flooding by
providing parking and other low intensive, non-
habitable uses at ground level, rather than habitable
uses.
AO6.4 Development will comply
Non-residential buildings and structures are oriented
to the street by activating the street frontage with
appropriate uses and urban design treatments such
as recessed wall treatments, screening or
landscaping, whilst allowing for flow through of flood
waters on the ground floor.
AO6.5 N/A. No basement or underground
Basements and underground car parking areas are parking areas are proposed.
designed to drain and function safely during a flood
event and power failure.
PO7 AO7.1 To be complied with at detailed
Water quality treatment systems use natural processes and Water quality treatment systems are designed to be
materials, whenever possible, and are integrated into design / construction stages.
integrated into the landscape consistent with the
development to enhance biodiversity and landscape benefits . technical design guideline published by Healthy Land
and Water Water by Design for the feature. (eg. For
Bioretention Basins: Bioretention Technical Design
Page 5 of 9
June 2021
Page 44
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Guidelines (October 2014) and for Wetland Systems
the Wetland Technical Design Guideline (May 2017).
Essential network infrastructure AO8 To be complied with at detailed
PO8 Essential network infrastructure that is likely to fail to design / construction stages.
Essential network infrastructure maintains effective function or may result in contamination when
function during and immediately after flood and storm tide inundated by flood water (e.g. water supply pipeline
inundation events. air valves and the like) is located above the DFE level
(or where the DFE has not been modelled for the
area, above the highest recorded flood level for the
area).
Essential community infrastructure AO9.1 N/A
PO9 Essential community infrastructure is sited and
Essential community infrastructure is able to function constructed to ensure that flood levels comply with
effectively during and immediately after flood events. flood immunity requirements specified in Table
8.2.6.4.
Page 6 of 9
June 2021
Page 45
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO9.2
Essential community infrastructure which is located
below the specified flood immunity requirements:
N/A
1. is designed and constructed to function
effectively during and immediately after
the recommended flood level event;
and
2. has direct access to low hazard
evacuation routes or an emergency
rescue area above the PMF, if it is
for emergency services (including
emergency shelters, police facilities,
hospitals and associated facilities).
Page 7 of 9
June 2021
Page 46
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
Earthworks AO10 To be complied with at detailed design /
PO10 Filling, other than accessways: construction stages.
Excavation and filling for operational works only occur where
they: 1. does not extend more than the equivalent of 3
metres around the main building, measured
1. result in the protection, rehabilitation and repair from the outer walls of the building;
of ecologically important areas, watercourses, 2. is limited to a maximum of 500m2 and
drainage lines and wetlands; 3. does not impact on the local drainage of
2. do not adversely impact on the overall adjoining properties.
hydrology, hydraulics and flood capacity of
a waterway;
3. do not directly, indirectly or cumulatively cause
adverse impacts external to the site;
4. do not cause increased flooding, which
adversely affects the safety or use of any land
upstream or downstream;
5. do not cause ponding of water on the site or
nearby land;
6. do not result in a reduction in flood storage
capacity;
7. do not adversely affect the flow of water in any
overland flow path; and
8. do not adversely affect the privacy or visual
amenity of surrounding property.
Page 8 of 9
June 2021
Page 47
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Hazardous materials AO11.1 To be complied with at detailed
PO11 Materials manufactured or stored on site are not
Development ensures that public safety and the design / construction stages.
hazardous or noxious, or do not comprise materials that
environment are not adversely affected by avoiding the may cause a detrimental effect on the environment if
release of hazardous materials into flood waters and the discharged in a flood event.
environment.
OR
AO11.2 N/A no essential community
If a DFE is adopted, structures used for the manufacture or infrastructure is proposed as part
storage of hazardous material are located above of the development.
the DFE level.
Page 9 of 9
June 2021
Page 48
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Stormwater drainage design AO1
PO1 A stormwater management plan is prepared consistent Development will comply. Refer to
The development and its stormwater management system is with PSP6 Engineering Design Standards - Roads, Stormwater Management Plan, in
planned and designed having regard to: drainage and earthworks. specific stormwater quality and
1. the natural features of the site;
quantity section prepared by this
2. the need to avoid impacts and potential risks
office.
to ecologically important areas;
3. the likely effectiveness of erosion and sediment
control and stormwater drainage measures during
rainfall events during and post construction; and
4. the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1 To be complied with at detailed
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction design / construction stages in
constructed to: is in accordance with PSP6 Engineering Design conjunction with the Stormwater
Standards - Roads, drainage and earthworks and the Management Plan, prepared by
1. incorporate allowance for increased flood risk latest version of the Queensland Urban Drainage Design
and tidal inundation through pipework as a this office.
Manual.
result of climate change and sea level rise; AO2.2 Rainwater captured in Bio
2. ensure the development is adequately drained; The stormwater drainage system connects to a lawful Infiltration Basin will gradually
and point of discharge in accordance with PSP6 Engineering
3. ensure stormwater is managed and lawfully
infiltrate to soil layers and freely
Design Standards - Roads, drainage and earthworks. discharges subsoil to an outfall to
discharged without altering stormwater
drainage characteristics external to the site. Weyba Creek
AO2.3 Development will comply, refer to
Stormwater flows discharging from the development are Stormwater Management Plan, in
demonstrated to be consistent with pre-development specific stormwater quantity
characteristics. section prepared by this office.
Page 1 of 12
June 2021
Page 49
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO2.4 Development will comply, refer to
Development provides for the management of Stormwater Management Plan
stormwater to incorporate appropriate allowance for prepared by this office.
climate change impacts (including rainfall intensity and
sea level rise), in accordance in accordance with PSP6
Engineering Design Standards – Roads, Drainage and
Earthworks.
PO3 AO3.1 N/A. No stormwater from the site is
Stormwater drainage infrastructure conveys run-off in a Stormwater drainage infrastructure meets the desired directed towards roads.
manner that allows roads to deliver desired standards of standards of service for roads functionality set out in PSP6
service appropriate to the local conditions and local Engineering Design Standards - Roads, Drainage and
stormwater drainage characteristics. Earthworks.
PO4 AO4.1 N/A. Rainwater captured in Bio
Stormwater infrastructure is compatible with existing The location, design and construction of stormwater Infiltration Basin will gradually
infrastructure, allows for easy access for the ongoing drainage structures is in accordance with PSP6 Engineering infiltrate to soil layers and freely
maintenance by Council, is cost effective across its design Design Standards - Roads, drainage and earthworks. discharges subsoil to an outfall to
life.
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
Page 2 of 12
June 2021
Page 50
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO4.2 N/A. Rainwater captured in Bio
Where infrastructure is located on private land an easement Infiltration Basin will gradually
is dedicated over the infrastructure in accordance with PSP6 infiltrate to soil layers and freely
Engineering Design Standards - Roads, drainage and discharges subsoil to an outfall to
earthworks. Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
AO4.3 N/A. Rainwater captured in Bio
Any alterations or repairs to infrastructure as a result of Infiltration Basin will gradually
the development are made at no cost to Council. infiltrate to soil layers and freely
discharges subsoil to an outfall to
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
AO4.4 Development will comply.
Development avoids stormwater inflow and infiltration to
the sewer infrastructure network.
AO4.5 N/A. Rainwater captured in Bio
Stormwater infrastructure is designed to minimize Infiltration Basin will gradually
maintenance costs and the requirement for specialized infiltrate to soil layers and freely
equipment for maintenance techniques. discharges subsoil to an outfall to
Weyba Creek. Refer to Stormwater
Management Plan prepared by this
office.
Page 3 of 12
June 2021
Page 51
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO5 AO5.1 N/A
Stormwater drainage infrastructure is aligned to avoid Stormwater drainage infrastructure avoids crossing
crossing waterways, wetlands, drainage lines and waterways, wetlands drainage lines and ecologically
ecological important areas, or where it is demonstrated this
is unavoidable, disturbed areas are reinstated and
important areas or follows the edge of existing disturbed
revegetated upon completion of works. areas.
AO5.2 N/A
Stormwater drainage infrastructure is co-located with
other infrastructure within a combined utility corridor
where appropriate.
AO5.3 N/A
Temporary vehicular crossings of waterways must be
designed and constructed to be consistent with the
current International Erosion Control Association Best
Practice Book Series.
Stormwater quality and protection of receiving waters AO6.1 Development will comply as
PO6 Stormwater runoff discharging into High Ecological Value Noosa Shire Council interactive
Development is located, designed, constructed and operated waters as a result of development causes no increase in mapping indicates the site is in an
to protect and enhance environmental values and water
gross pollutants, total suspended solids, total phosphorous environmentally significant area.
quality of waterways, wetlands, lakes, ground waters and
drainage systems. or total nitrogen compared to a pre-development scenario. Refer to Stormwater Management
Plan, in specific stormwater
AND quality section prepared by this
Editor’s note: Environmental values of waters and water office.
AO6.2
quality objectives are prescribed in Schedule 1 of the
Environmental Protection (Water) Policy 2009 and are
All stormwater runoff is treated to achieve maximum
identified on the State Planning Policy Interactive Mapping removal of nutrients, gross pollutants and suspended Development will comply, Refer to
System. solids as determined by cost to efficiency ratios. (e.g. Stormwater Management Plan, in
Page 4 of 12
June 2021
Page 52
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
bioretention basins must be sized to achieve at least 80% specific stormwater quality section
reduction in total suspended solids, 60% reduction in total prepared by this office.
phosphorous, 45% reduction in total nitrogen and 90%
reduction in gross pollutants >5mm).
OR N/A
AO6.3
Developments achieve a minimum 3 drop rating consistent
with the Water by Design Living Waterways Scoring Guide
(Healthy Land and Water).
PO7 AO7.1 Development will comply, Refer to
Water quality treatment systems use natural processes and Water quality treatment systems are designed to be
materials, whenever possible, and are integrated into Stormwater Management Plan, in
integrated into the landscape consistent with the technical
development to enhance biodiversity and landscape benefits . specific stormwater quality section
design guideline published by Healthy Land and Water
Water by Design for the feature. (eg. For Bioretention prepared by this office.
Basins: Bioretention Technical Design Guidelines (October
2014) and for Wetland Systems the Wetland Technical
Design Guideline (May 2017).
PO8 AO8.1 N/A. Water quality treatment
Water quality treatment infrastructure to be dedicated as Detailed life cycle costing is provided for the entire infrastructure will not be dedicated
public assets are proven to be suitable for its use and of a treatment train system including replacement costs of to Council.
cost effective and efficient standard.
asset parts.
AO8.2
Treatment systems dedicated as public assets are designed
to minimize maintenance, renewal and adaption costs and
Page 5 of 12
June 2021
Page 53
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
the requirement for specialized equipment, material or
maintenance techniques
AO8.3
Vegetated stormwater management systems to be
dedicated as public assets are established and maintained
during the maintenance period to ensure optimal
vegetated growth and that the functional elements of the N/A
system achieve the design function at the end of the
maintenance period.
PO9 AO9.1 To be complied with at detailed
Treatment systems are designed to eliminate or minimise Free draining inlets and outlets are provided to ensure that design / construction stages.
health, safety and aesthetic hazards, including risks
associated with insect breeding, odour and public safety.
waters do not pond for more than 24 hours.
AO9.2 To be complied with at detailed
Developments are designed to eliminate retaining walls in design / construction stages.
excess of 0.8m for any water quality treatment device.
Hydrology and waterway stability AO10
Development will comply, Refer to
PO10 The development is designed to: Stormwater Management Plan.
Development prevents increased bed and bank erosion and 1. limit the peak 1 year ARI event discharge
sedimentation in receiving waterways by avoiding changes within the receiving waterway to the pre-
in low rate, peak flow run-off and flow duration.
development peak 1 year discharge;
2. maximise pervious areas by using pervious
alternatives for otherwise impervious areas
wherever possible;
Page 6 of 12
June 2021
Page 54
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
3. provide for capture and reuse of stormwater
for non-potable purposes for gardening, toilet
flushing, laundry and hot water supply uses;
4. incorporate appropriate detention features;
and
5. incorporate natural channel design principles
PO11 AO11.1
N/A. No new channels natural
Water sensitive urban design principles are applied to The design and construction of a natural channel or natural
achieve multifunctional design of waterways, wetlands and channel or natural channel
channel rehabilitation works are in accordance with the
drainage lines that provide for: Natural Channel Design Guidelines (Brisbane City rehabilitation works are proposed.
1. stormwater conveyance that uses natural
channel design;
Council) having regard to local topography, geology, and
2. protection of landscape features and ecological geomorphology.
important areas including terrestrial and aquatic AO11.2 To be complied with at detailed
habitat; Landscape features, plant species and habitat types used design / construction stages.
3. aesthetic and passive recreation values; in stormwater conveyance channels are complementary to
4. flood management and conveyance of external the local context and natural waterways.
catchment stormwater through the AO11.3 To be complied with at detailed
development; Bank and bed stability and planting densities result in a design / construction stages.
5. landscaping that incorporates local native stable channel over the long term and minimal potential
species; and for pest plant species.
6. bed and bank stability. AO11.4
Development Complies, Water
Water Sensitive Design measures are incorporated into the
Sensitive Design measures were
development, as detailed in the document Water Sensitive
Designs small improvements, new ideas, concepts and incorporated in the SBSMP.
Page 7 of 12
June 2021
Page 55
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
sketch designs for stormwater filtration systems (Healthy
Waterways Water by Design).
AO11.5
Development will comply..
Floodplain management is designed in accordance with
the Framework for the Integration of Flood
and Stormwater Management into Open Space published
by Healthy Waterways Water by Design (version current at
the time of development application).
PO12 AO12.1 Development will comply, pre-
Development protects in-stream ecology by maintaining Where run-off from or within the site passes through or development low flows will be
pre-development low flow discharge regimes and drains to natural channels, waterways or wetlands, maintained in accordance with the
maintaining fish passages. development protects in-steam ecology by maintaining
frequent flow management
pre-development low flow discharge regimes in
objectives in PSP6 Engineering
accordance with the frequent flow management objectives
in PSP6 Engineering Design Standards - Roads, drainage Design Standards - Roads,
and earthworks drainage and earthworks
AO12.2 N/A no instream structure are
Instream structures such as roads, bridges, culverts, and proposed within this SBSMP
other stormwater infrastructure do not cause barriers to prepared by this office.
fish passage and facilitate the movement of terrestrial and
aquatic fauna along waterway corridors.
AO12.3 Development will comply.
Benthic substrate retains a continuous grade with the
direction of flow consistent with the natural bed profile.
Page 8 of 12
June 2021
Page 56
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO13 AO13.1 To be complied with at detailed
Development is designed and constructed to maintain The location and form of stormwater discharge points do design / construction stages.
surface and ground water balances that sustain the not alter the pre-development hydrology of receiving
environmental values of water dependent ecosystems, surface water or groundwater.
including downstream aquatic, riparian, wetland and
terrestrial ecosystems. AO13.2 N/A Development is not located
Developments located on groundwater recharge or on groundwater recharge or
discharge areas are designed and managed in accordance discharge areas.
with a groundwater recharge and discharge management
plan prepared by a suitably experienced and qualified
groundwater hydrologist. The groundwater recharge or
discharge must demonstrate that the development does
not affect groundwater balances beyond the property
boundaries.
Construction and establishment of stormwater AO14.1 To be complied with at detailed
management systems An erosion and sediment control plan prepared in design / construction stages.
PO14 accordance with the International Erosion Control
Construction methods provide for appropriate controls to Association Best Practice Books demonstrates that the
avoid entry and transport of litter, sediment, and capture and release of stormwater achieves the design
associated prescribed water contaminants into receiving objectives listed in Table A: Construction phase –
waters. stormwater management design objectives of the State
Planning Policy (Appendix 2).
AO14.2 To be complied with at detailed
Construction works are designed and managed to restrict design / construction stages.
the extent of clearing and soil exposure to the minimum
Page 9 of 12
June 2021
Page 57
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
necessary for access, and safe construction at any one
time.
AO14.3 To be complied with at detailed
For buildings: design / construction stages.
1. upstream runoff is diverted around
the construction site;
2. sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and waterways ,
wetlands or drainage lines either on
or off the site; and
3. temporary or permanent downpipes
are connected to the stormwater
system before laying the roof; or
4. Localized erosion is avoided by
directing flow from downpipes over
non-erosive areas.
AO14.4 To be complied with at detailed
Chemical flocculants used as part of an erosion and design / construction stages.
sediment control plan do not harm the environmental
values within receiving waters.
AO14.5 To be complied with at detailed
design / construction stages.
Page 10 of 12
June 2021
Page 58
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Appropriately sized litter containment areas, with
provision for sorting recyclables are provided for the type
of litter expected to be generated onsite.
AO15 N/A
Wastewater management and effluent disposal Wastewater (non-sewage) generated from the
PO15
development is collected and contained on-site, and is:
Development does not discharge wastewater unless it
can be demonstrated to not compromise environmental
1. lawfully disposed to sewer; or
values of waters and water quality objectives
2. transferred off-site for treatment/disposal to
an appropriately licenced facility;
3. reused on-site in a closed-cycle irrigation
scheme, industrial processes, washing or
cleaning or other purpose; or
4. treated to meet the drinking water supply
environmental values prior to release.
PO16 AO16 N/A
On-site effluent treatment and disposal systems are An onsite effluent system and disposal area is:
designed, constructed and managed to not compromise
the environmental values of waters and water quality 1. not located on a slope greater than 1 in
objectives. (10%);
2. not located at or below the 1% annual
exceedance probability (AEP flood event);
3. not located within a riparian buffer
area mapped on a Biodiversity, Waterways
and Wetlands Overlay Map; and
Page 11 of 12
June 2021
Page 59
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
4. setback 400 metres minimum from the full
supply level of Lake Macdonald.
Page 12 of 12
June 2021
Page 60
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix F
Noosa Shire Council Erosion Hazard Assessment
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 61
SCHEDULE 2—EROSION AND SEDIMENT CONTROL
Proposed Amendments August 2015
ASSESSMENT
The Noosa Plan
1. Preamble
Erosion and sediment control on building sites
Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.
Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.
Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.
Effective on-site erosion and sediment control provides the following benefits—
A better looking, more marketable site;
Improved wet weather working conditions;
Reduced stockpile losses;
Less mud and dust problems;
Reduced clean-up costs;
Fewer public complaints;
Better public image;
Cleaner watercourses; and
Better fishing and swimming in our nearby watercourses.
2. Erosion Hazard Assessment Form
Controlling Factors Points Score Checking
Predominant slope1 of the whole site, prior to
building works:
0 - 3% slope 0
>3% - 5% slope 1
>5% - 10% slope 2 1
>10% - 15% slope 4
> 15% slope 5
Soil type: (see 1 below)
Sandy soil/gravel 0
Sandy loam 1 1
1
The term ‘predominant slope’ is defined in Part 2 Section 2.12.
S2.1
Page 62
Controlling Factors Points Score Checking
Clay loam 2
Proposed Amendments August 2015
The Noosa Plan
Clay soil 2
Anticipated duration of site disturbance: (see 2 below)
Duration < 2 weeks 0
2 weeks Duration < 3 months 2 5
3 months Duration < 6 months 4
Duration > 6 months 5
Month that works are undertaken: (see 3 below)
August, September 0
April, May, June, July, November, October 1 1
March December 2
January February 3
Offsite sediment control (i.e. down slope of the soil
disturbance):
Score 1 point if there is no purpose built, operational 1
and well maintained sediment traps (eg. sediment 1
basin, gross pollutant trap or purpose built wetland)
to catch sediment before it enters a water body with
environmental values (eg. creek, natural wetland,
river or bay) (see 4 below)
Run-off entering the site:
Score 1 point if stormwater run off entering the site is 1 0
not diverted away from the soil disturbance
Extent of site disturbance:
Score 2 points if building work requires reshaping of
the ground surface (eg. ‘cut and fill’ works) (see 5 2
below) 2
Score 5 points if the area to be disturbed is greater 5
than 600m²
Works within environmentally sensitive areas:
Score 11 points if the disturbance is within the banks
of a watercourse (see 6 below) 11
Score 5 points if the disturbance is within 50m of the 2
top of bank of a watercourse 5
Score 2 points if the disturbance is between 50m
and 100m of the top of bank of a watercourse 2
TOTAL SCORE (See 7 & 8 below) 13 LOW
Notes:
1. Where there is more than one type of soil on the site, select the category with the highest point value.
2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
be fully stabilised (eg. grassing).
3. If this time span covers more than one category, select the category with the highest point value.
Note that if there is no grass/vegetation cover on the site before building work has started, the time
span starts from the time this form is completed.
4. If you are not sure, score 1 point.
5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
intermittently.
7. For a high risk site, the total score is 14 points.
8. For a low risk site, the total score is < 14 points.
S2.2
Page 63
Proposed Amendments August 2015
3. Erosion and Sediment Control Methods
The Noosa Plan
Element Solution
Minimise disturbance when excavating Retain as much grassed area as possible on the
site.
These areas not only improve the appearance
of the site they also filter much of the sediment
from stormwater run-off before it reaches the
drainage system.
Catch drains and perimeter banks Allow for diversion of up slope stormwater
around the work site and other disturbed
surfaces.
Install a sediment barrier Install sediment barriers down slope of the
building site to filter coarse sediment before it
can wash into gutters, drains and watercourses.
Purpose designed geotextile sediment
fabric (i.e. not shadecloth) attached to posts
with the geotextile buried in an upstream
trench; or
Place turf of a minimum 600mm width along
kerb line; or
Straw bales, staked in a 100mm (min) deep
trench.
Single gravelled entry-exit Restrict vehicle access to one entry-exit point.
Gravelling the access point will allow all
weather access, will reduce the amount of
soil carried off the site by vehicles, and will
provide a permanent base for the driveway.
Early stormwater drainage connection Connect a temporary or permanent downpipe/s
to the stormwater system before laying the roof
or slow and spread the flow from downpipe/s to
avoid localised erosion. Downpipe/s may be
temporarily removed during wall construction.
All stormwater must discharge in a manner that
does not cause soil erosion.
Concrete waste and washing Waste concrete and household paint must not
be allowed to wash into the gutters or the street.
Sand and soil stockpiles Stockpiles must be placed wholly on the
construction site and behind a sediment barrier.
S2.3
Page 64
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix G
Noosa Shire Council (Interactive Mapping)
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 65
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 66
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 67
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 68
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 69
10} r168CP8495 16) 0 148MCH4796 0 167CP849516 ~ & G latels (S62 Road Labels = Major 2 ga Intermediate e | —— S7REII0234 Property Label 620 SO . — aN pe PlaceNames 9 “4 ‘85RP94023) 5 Fs 28% D poi PS. pes 84RP94023 a Foy FOOpegso1 RP94023} 42 2s Y55'00) 1928) ie fie Peest A BY he ef 81 RP94023) isis 29 Ieee 3 eB i80RP94023) = 57RP94023) 24) 3} ‘ 27 "i 9RP94023) Se 78RP94023) 1 IS8RP940: Q Ai 10: “ la = 20 05 M103RP94023) Oe q oS) pace) 105RP94023) F oh 109RP94023) Bian 146RP94023) Py v3. ae “yg87RP94023) : rr abcae cS S “a ‘ 2H 50, 7RP94023 ‘ a Se OY, dopoeans 7, 4 ats = 93RP94023) z a SF iy 20s ee Py i \ Bo ea reo i94RP94023 me ag arias a boS!00) 3. S Ope | ot . S 2235 4 De "A118RP94023) u137RR94023 FS 16 vay Site 24) peeecanrs “145RP94023 ms nH M'56RP94023¢_ fo) _ ASSRP94023 M47RP94023) 74 6 y 1 54RP94023} g Fire Management g Brigade Areas 3) Rural Brigade Areas (DCS) E29) Urban Brigade Areas (DCS) BQA D AV FireBreaks Trails ME Bushfire Hazard Area (Bushfire Prone Area) Gm Very High Potential Bushfire Intensity HB High Potential Bushfire Intensity ME Medium Potential Bushfire Intensity Potential Impact Buffer & Contours Az Contour Labels /\/ Contours (1m) g Transport and Facilities Emergency Services Facilities Evacuation Centres /V/ Minor QB Beach Access On-Road Bike Routes BAZ /V/ Cycle bus lane SV Cycle lane Cycle parking lane Green treatment /V/ Greenlink /\V/ Intersection /V/ Intersection signalised /V/ Mixed traffic street /\/ Roundabout /V/ Sealed shoulder Shared zone ,>, Other Noosa Trail Trail 1 Trail 2 AN Trait3 f\¢ Trail 4 JN ¢ Trail 5 AN Trail Trail 7 Trail 8 SV/ Pathways Oe Railway Water Skiing Areas Permitted Prohibited @ On-Water Navigation Aids 21/04/2022 Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying OOSA COUNCIL upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability whatsoever for any errors, faults, defects or omissions in the information. 1:2257
Page 70
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:2257
Page 71
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 21/04/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
1:4514
Page 72
Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying 1/12/2022
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability NSC - Flood Hazard Overlay
whatsoever for any errors, faults, defects or omissions in the information.
1:2257
Page 73
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix H
MUSIC Modelling Information
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 74
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
MUSIC Model Information
Introduction:
The quality of stormwater runoff and the impact of the proposed stormwater quality improvement measures
were analyzed using MUSIC Version 6.3.0 according to the MUSIC Modeling Guidelines Version 1.0, Water
by Design 2010. The source nodes in the model are split into two types and a summary of the area breakdown
is presented below:
Meteorological Data:
The MUSIC model was carried out using the following parameters:
- Modeling period should be 10 years with a time step of 6 minutes
- The nearest available 6 minute time step rainfall series to the subject site is Cooroy (Rainfall Station ID
040059), with a mean annual rainfall of 1595 mm, and data from: 1/1/1973 to 31/12/1983. Evaporation was
applied as monthly mean. The mean annual evaporation was 1201 mm.
Source Nodes, Fractions Impervious:
The areas of the source nodes were estimated from the Post Development Stormwater Catchment Plan as
shown in Appendix C
Source Nodes - Pollutant Exports:
Rainfall runoff and pollutant export parameters were assigned per Tables 3.7 and 3.8 of the Water by Design
MUSIC Modeling Guidelines Version 1.0 (2010).
The rainfall runoff and pollutant export parameters for an Urban development were adopted.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 75
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Properties of Bio Infiltration Basin:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 76
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Treatment Train for Prost Development:
Results for Post-Development:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 77
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Treatment Train for Pre-Development:
Results for Pre-Development:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 78
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
MUSIC Parameters – Existing Vegetated Surface/Suspended Timber Walkway:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 79
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Appendix I
Geotechnical Report
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Page 80
CONSTANT HEAD TEST
Talsma Hallam Metod AS/NZ 1547:2000 Appendix 4.1F
Client ADG Hole No Permeability 1
Project Bio-Basin Test Date April 12, 2023
Location RACV Noosa Resort Project No. 23109
dh
Tested by MS Checked MT
Depth of Hole (Lh) 40.00 cm Vegetation
Tube below Surface (Lt) 10.00 cm Area may be occasionally inundatedwith
Length to Air Inlet (Ls) 1.0 cm stormwater.
Test Section (H) 30 cm Soil moisture prior to test Lt
Diameter of test section (Dh) 10.00 cm Saturated for 5-10 min prior to test. Dt Lh
Ls
Diameter of tube (Dt) 5.000 cm Continuously draining (>15L).
Static depth to gw (hs) cm General comments (soil structure, H
Dh
Depth Impermeable Layer (S) cm macro pores, water logging etc)
Radius of Tube (R) 2.50 cm
SAND, Fine to Meduim Grained. S
Radius of Test Section (r) 5.00 cm
Impermeable Layer
i = 1, 2, 3, ....n
50 Level in Difference
i Time Tube in level
45
t h dh K
40 (min) (cm) (cm) (m/s)
1 0.0 0.0
35
2 0.5 10.0 10.00 2.9E-05
30 3 1.0 21.0 11.00 3.2E-05
4 1.5 32.0 11.00 3.2E-05
25
y = 22x - 0.6 5 2.0 44.0 12.00 3.5E-05
R² = 0.999 20 6
7
15
8
10 9
5 10
11
0 12
-5 13
0.0 0.5 1.0 1.5 2.0 2.5 14
15
Time t (min) 16
17
18
19
Calculation of Hydraulic Conductivity, K : 20
21
π R 2 ∆h 22
0.5sinh-1 H − r r
4.4 2 + 0.25 + 23
∆t 2r H H
24
K =
2πH 2 25
26
27
28
29
30
Equilibrium Hydraulic Conductivity : 31
32
Time Height 33
Start from 1 0.0 0.0 34
End at 5 2.0 44.0 35
K = 3.2E-05 m/sec 36
Page 81
Borehole No.
HA1
Page 1 of 1
Engineering Log - Borehole Project No.: 23109
Client: Aspect Architects Commenced: 12/4/2023
Project Name: Proposed Bio-Basin Completed: 12/4/2023
Hole Location: 94 & 142 Noosa Drive, Noosa Heads Logged By: MS
Hole Position: 508265.3 m E 7080053.1 m N MGA2020 Zone 56 Checked By: MT
Drill Model and Mounting: Hand Auger Inclination: -90° RL Surface: No survey
Hole Diameter: 100 mm Bearing: 360° Datum: AHD Operator: Tectonic
Drilling Information Material Description and Observations
Relative Density
Classification
Pocket DCP TEST
Penetration
Consistency
Graphic Log
Samples Material Description
Penetrometer
Recovery
Condition
Tests soil type: plasticity or particle characteristics,
Moisture
UCS Blows per 100 mm
Symbol
Method
Remarks secondary and minor components, colour
Water
RL Depth (kPa)
(m) (m) 0 5 10 15 20 25
100
200
300
400
500
DS SAND, (FILL), fine grained, pale brown, with
HW
0.0-0.3m organics, trace cobbles, 70mm
VL to
L
without cobbles, trace organics
MD
0.5
CI Sandy CLAY, (FILL), medium plasticity, pale grey, 120
St
red brown, orange
SM Silty SAND, (ALLUVIUM), fine to medium
grained, grey
Not Encountered
M
TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 23109.GPJ <<DrawingFile>> 13/4/2023 11:54 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30
DS
0.8-1.0m
L
HA
1.0
MD
1.5
DS becoming dark grey
1.5-1.7m
M to
D
W
SM Indurated SAND, (ALLUVIUM), fine to medium
grained, dark grey, weakly cemented
Hole Terminated at 1.80 m
Hand auger refusal on indurated sand
2.0
Method Penetration Water Samples and Tests Moisture Condition Consistency/Relative Density
AD/T-Auger Drilling TC Bit VE - Very Easy Level (Date) U## - Undisturbed Sample (## mm) D - Dry VS - Very Soft
AD/V-Auger Drilling V Bit E - Easy DS - Disturbed Sample M - Moist S - Soft
RT - Rotary Tri-cone Bit Inflow BDS - Bulk Disturbed Sample W - Wet F - Firm
RD - Rotary Drilling F - Firm SPT - Standard Penetration Test VSt - Very Stiff
Partial Loss
NMLC -Rock Core H - Hard H - Hard
VH - Very hard Complete Loss
HA - Hand Auger Plastic Limit VL - Very Loose
Graphic Log/Core Loss L - Loose
Classification Symbols and < PL MD - Medium Dense
Core recovered (hatching Soil Descriptions
indicates material) = PL D - Dense
Based on Unified Soil < PL VD - Very Dense
Core loss Fr - Friable
Classification System
Page 82
Adelaide Brisbane
Level 6, 19 Grenfell Street 596 Milton Road
Adelaide SA 5000 Toowong, QLD 4066
Phone: 1300 657 402 Postal: PO Box 1492 Toowong
Email: [email protected] BC QLD 4066
Phone: 1300 657 402
Email: [email protected]
Darwin Gold Coast
Suite G01, Manunda Place Suite 201, Level 1, 1 Short Street
38 Cavenagh Street Southport, QLD 4215
Darwin, NT 0800 Postal: PO Box 208
Phone: 1300 657 402 Southport, QLD 4215
Email: [email protected] Phone: 1300 657 402
Email: [email protected]
Hobart Melbourne
Tenancy 1B, Level 1, 321 / 838 Collins Street
199 Collins Street Docklands, VIC 3008
Hobart TAS 7000 Phone: 1300 657 402
Phone: 1300 657 402 Email: [email protected]
Email: [email protected]
Perth Sunshine Coast
Suite 9, Level 2, 23 Railway Road, Level 3, 2 Emporio Place
Subiaco WA 6008 Maroochydore, QLD 4558
Phone: 1300 657 402 Postal: PO Box 5014
Email: [email protected] Maroochydore BC, QLD 4558
Phone: 1300 657 402
Email: [email protected]
Sydney Toowoomba
Suite 22.02, Level 22, Tenancy 8, 158 Margaret Street
111 Pacific Highway, Toowoomba QLD 4350, Australia
North Sydney, NSW, 2060 Phone: 1300 657 402
Phone: 1300 657 402 Email:
Email: [email protected]
Driven by passion and vision, courage, and optimism, we truly believe that no
project or challenge is beyond us. At ADG, we design with purpose, to make a
difference.
ADG Engineers
www.adgce.com
Used in these records
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.