Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118

of 82

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (35.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                              RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                     ADG Ref: 22366 C R10 Rev07 21.07.2023.docx

                                                                                                       July 2023




                                                                  Developable
                                                                   Site Area




                      Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)


         Furthermore, review of Noosa Shire Council’s 2019 Draft Planning Scheme Policy Coastal Hazards
         mapping indicates the subject site is located within an area subject to Sea Level Rise HAT
         inundation and Stormtide inundation 1% AEP events. Refer to Appendix G for Council flood
         mapping plots regarding extents of the above-mentioned inundation events.


         In response to Council’s information request, ADG note the proposed cabin lodge’s will be
         suspended structures along with the walkways and carpark. The minimum habitable floor level for
         the suspended cabins is RL3.4m AHD. Appendix G which illustrates the council flood mapping,
         plots this defined flood event (DFE) extents at approx. RL2.4m AHD. Give the finished floor level
         (FFL) is at minimum RL3.4m AHD, there is a minimum of 1.0m between the assumed DFE and FFL.




BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA       Page 10

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.