Council archive · source document
2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (35.2 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev07 21.07.2023.docx
July 2023
Contents
EXECUTIVE SUMMARY 5
1 INTRODUCTION 7
1.1 Background 7
1.2 Background Information 7
1.3 Property Detail 7
2 EXISTING SITE 8
2.1 Existing Site Features 8
3 FLOODING 9
3.1 Flooding Considerations 9
4 STORMWATER INFRASTRUCTURE 11
4.1 Existing Infrastructure 11
4.2 Lawful Point of Discharge (LPD) 11
4.2.1 Existing LPD 11
4.2.2 Proposed LPD 11
4.3 External Catchment 11
5 STORMWATER QUANTITY ASSESSMENT 12
5.1 Proposed Development and Associated Issues 12
6 STORMWATER QUALITY ASSESSMENT 12
6.1 Treatment Objectives 12
6.2 Site Analysis and Design Strategy 13
6.2.1 Pre-Development Phase 13
6.2.2 Bulk Earthworks Phase 14
6.2.3 Construction Phase 14
6.2.4 Maintenance 15
6.3 Operational Phase Treatment 15
6.3.1 Bio infiltration basin 15
6.4 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank 15
6.4.1 Internal Demand 15
6.5 MUSIC Model 16
6.6 On-site Treatment Lifecycle Costs 18
6.7 Water Quality Monitoring 19
6.8 Maintenance 19
7 CONCLUSION 20
Figures
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22) 8
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.