                                                              RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                     ADG Ref: 22366 C R10 Rev07 21.07.2023.docx

                                                                                                       July 2023


 Contents
 EXECUTIVE SUMMARY                                                                                            5
 1     INTRODUCTION                                                                                           7
       1.1   Background                                                                                       7
       1.2   Background Information                                                                           7
       1.3   Property Detail                                                                                  7
 2     EXISTING SITE                                                                                          8
       2.1   Existing Site Features                                                                           8
 3     FLOODING                                                                                               9
       3.1   Flooding Considerations                                                                          9
 4     STORMWATER INFRASTRUCTURE                                                                             11
       4.1   Existing Infrastructure                                                                         11
       4.2   Lawful Point of Discharge (LPD)                                                                 11
             4.2.1     Existing LPD                                                                          11
             4.2.2     Proposed LPD                                                                          11
       4.3   External Catchment                                                                              11
 5     STORMWATER QUANTITY ASSESSMENT                                                                        12
       5.1   Proposed Development and Associated Issues                                                      12
 6     STORMWATER QUALITY ASSESSMENT                                                                         12
       6.1   Treatment Objectives                                                                            12
       6.2   Site Analysis and Design Strategy                                                               13
             6.2.1     Pre-Development Phase                                                                 13
             6.2.2     Bulk Earthworks Phase                                                                 14
             6.2.3     Construction Phase                                                                    14
             6.2.4     Maintenance                                                                           15
       6.3   Operational Phase Treatment                                                                     15
             6.3.1     Bio infiltration basin                                                                15
       6.4   Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank                                   15
             6.4.1     Internal Demand                                                                       15
       6.5   MUSIC Model                                                                                     16
       6.6   On-site Treatment Lifecycle Costs                                                               18
       6.7   Water Quality Monitoring                                                                        19
       6.8   Maintenance                                                                                     19
 7     CONCLUSION                                                                                            20


 Figures
 Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22)                                  8

BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA        Page 3

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.