IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
ISSUED FOR
THE GENERAL APPROVAL
NOTES SHEET
NOT FOR CONSTRUCTION
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
B 24/10/22 DA RFI ZT
C 28/10/22 DA RFI ZT
D 10/11/22 DA RFI ZT
copyright and design rights) subsisting in the drawings and related
construction. ADG makes no warranties, either express or implied,
E 15/11/122 RFI ZT
ADG accepts no responsibility or liability for any loss or damage
F 02/12/22 RFI ZT
purposes only and may not contain the full details required for
All intellectual property rights (including, without limitation, all
information belongs to ADG Engineers (Aust) Pty Ltd ("ADG").
G 05/12/22 RFI ZT
of merchantability and fitness of the drawings or data for any
Drawings or information are provided for general information
H 18/05/23 RFI RESPONSE TB
caused to the recipient or any third party through use of the
I 30/06/23 RESPONSE TO 2ND RFI ZT
1
A65-07
drawings or related information in any way.
18 CARPARKS
CABIN 1
particular purpose.
10m WIDE BUSHFIRE ASSET EMT X
PROTECTION ZONE
EMT B
RL 11.022
CABINS 14 & 15
4
2 A65-09
A65-09
RL 10.730 CABINS 2 & 3 RL 11.022
LEGEND
EMT A Ex1
CABINS 12 & 13
Site Grade Direction
A
0
60 0
200 mm deep Stormwater
Swale (Vegetated) LOT 3
Existing Trees
Bio-infiltration Basin
0
400
CABINS 10 & 11
3
A65-09
CABINS 4 & 5
06 21.07.23 Issued For Approval TM RS
RL 11.640
CABINS 8 & 9 05 13.07.23
03.05.23
Issued For Approval TM RS
AM
04 Preliminary TM
03 14.12.22 Preliminary TM AM
02 29.09.2 Preliminary TM MVI
2
01 03.06.19 Issued For Approval BP MVI
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
CABINS 6 & 7 60
00 BOAQ 4487
RL 11.810
T:1300 657 402 E: [email protected] W: www.adgce.com
BUILDING DESIGNERS
Quality Assurance ISO 9001:2015 | Work Health Safety ISO 45001:2018
ASSOCIATION
Env ironmental Management ISO 14001:2015
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
Aspect Architects
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
RACV NOOSA ECO RESORT
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
94-142 RACV
NOOSA
NOOSADR, NOOSA
RESORT - ECO
PROJECT
RESORT
POST DEVELOPMENT
FOR
ROYAL AUTOMOBILE CLUB OF
CATCHMENT
VICTORIA
PLAN
CONCEPT DESIGN
@
94-142 142
NOOSA DR,
NOOSA DRIVE,
QLD 4567
NOOSA
NOOSA HEADS
DRAWING TITLE
CIVIL PRELIMINARY
TM SITEAM
PLAN RS
N
22366
DATE
TM
SCALE @ A1
NTS
DRAWN CHECKED
(at A1)
Catchment T
1:250
0 2 4 6 8 10 20 SK02
30/06/23
DRAWING No.
21-0910_ A10-01
1 : 250 ZT
ISSUE
06I
TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.