2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (35.2 MB): may take a few minutes to open.
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO3 AO3
For reconfiguring a lot or operational works, development is Development areas are not filled to reduce flood risk. Development will comply
undertaken in a manner that ensures:
1. natural hydrological systems are protected from
erosion, scour or flood damage on the premises
or other premises;
2. natural landforms and drainage lines are
maintained to protect the hydraulic performance
of waterways and flood plain; and
3. development integrates with the natural
landform rather than modifying the landform to
suit the development as far as practicable.
PO4 AO4.1 N/A
For reconfiguring a lot, development does not compromise Development provides an effective evacuation route that
the safety of people resulting from the flood risk associated remains passable, with sufficient flood warning time, to
with events exceeding the DFE. enable people to progressively evacuate to safe areas
above the PMF in the face of advancing flood or waters for
events that exceed the DFE.
OR
AO4.2 N/A
Development provides for an area of sufficient size and
dimensions on site above the PMF that allows for safe
congregation and refuge.
Page 2 of 9
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.