Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118

of 82

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (35.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions



 Earthworks                                                            AO10                                                        To be complied with at detailed design /
 PO10                                                                  Filling, other than accessways:                             construction stages.
 Excavation and filling for operational works only occur where
 they:                                                                          1. does not extend more than the equivalent of 3
                                                                                   metres around the main building, measured
              1. result in the protection, rehabilitation and repair               from the outer walls of the building;
                 of ecologically important areas, watercourses,                 2. is limited to a maximum of 500m2 and
                 drainage lines and wetlands;                                   3. does not impact on the local drainage of
              2. do not adversely impact on the overall                            adjoining properties.
                 hydrology, hydraulics and flood capacity of
                 a waterway;
              3. do not directly, indirectly or cumulatively cause
                 adverse impacts external to the site;
              4. do not cause increased flooding, which
                 adversely affects the safety or use of any land
                 upstream or downstream;
              5. do not cause ponding of water on the site or
                 nearby land;
              6. do not result in a reduction in flood storage
                 capacity;
              7. do not adversely affect the flow of water in any
                 overland flow path; and
              8. do not adversely affect the privacy or visual
                 amenity of surrounding property.




Page 8 of 9
June 2021

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.