Skip to the record
For the highest quality transcripts.

Council archive · source document

2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118

of 82

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (35.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                                bioretention basins must be sized to achieve at least 80%      specific stormwater quality section
                                                                reduction in total suspended solids, 60% reduction in total    prepared by this office.
                                                                phosphorous, 45% reduction in total nitrogen and 90%
                                                                reduction in gross pollutants >5mm).

                                                                OR                                                            N/A
                                                                AO6.3
                                                                Developments achieve a minimum 3 drop rating consistent
                                                                with the Water by Design Living Waterways Scoring Guide
                                                                (Healthy Land and Water).
 PO7                                                            AO7.1                                                         Development will comply, Refer to
 Water quality treatment systems use natural processes and      Water quality treatment systems are designed to be
 materials, whenever possible, and are integrated into                                                                        Stormwater Management Plan, in
                                                                integrated into the landscape consistent with the technical
 development to enhance biodiversity and landscape benefits .                                                                 specific stormwater quality section
                                                                design guideline published by Healthy Land and Water
                                                                Water by Design for the feature. (eg. For Bioretention        prepared by this office.
                                                                Basins: Bioretention Technical Design Guidelines (October
                                                                2014) and for Wetland Systems the Wetland Technical
                                                                Design Guideline (May 2017).

 PO8                                                            AO8.1                                                          N/A. Water quality treatment
 Water quality treatment infrastructure to be dedicated as      Detailed life cycle costing is provided for the entire         infrastructure will not be dedicated
 public assets are proven to be suitable for its use and of a   treatment train system including replacement costs of          to Council.
 cost effective and efficient standard.
                                                                asset parts.
                                                                AO8.2
                                                                Treatment systems dedicated as public assets are designed
                                                                to minimize maintenance, renewal and adaption costs and




Page 5 of 12
June 2021

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.