Skip to the record
Every meeting, every word.

Council archive · source document

2ND RFI - Attachment 4A - Stormwater Management Plan (2) · MCU22/0118

of 82

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (35.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                             CONSTANT HEAD TEST
                                             Talsma Hallam Metod AS/NZ 1547:2000 Appendix 4.1F

     Client ADG                                                             Hole No           Permeability 1
    Project Bio-Basin                                                     Test Date            April 12, 2023
   Location RACV Noosa Resort                                            Project No.              23109
                                                                                                                                      dh
  Tested by MS                                                             Checked                  MT




                          Depth of Hole (Lh)                 40.00 cm   Vegetation
                     Tube below Surface (Lt)                 10.00 cm     Area may be occasionally inundatedwith
                      Length to Air Inlet (Ls)                 1.0 cm                  stormwater.
                             Test Section (H)                   30 cm   Soil moisture prior to test                                             Lt
                 Diameter of test section (Dh)               10.00 cm       Saturated for 5-10 min prior to test.                   Dt               Lh
                                                                                                                                           Ls
                        Diameter of tube (Dt)                5.000 cm         Continuously draining (>15L).
                       Static depth to gw (hs)                     cm   General comments (soil structure,              H
                                                                                                                                      Dh
                Depth Impermeable Layer (S)                        cm   macro pores, water logging etc)
                          Radius of Tube (R)                  2.50 cm
                                                                             SAND, Fine to Meduim Grained.             S
                    Radius of Test Section (r)                5.00 cm
                                                                                                                       Impermeable Layer
                                                                                       i = 1, 2, 3, ....n
                                                                   50                                       Level in   Difference
                                                                                          i     Time         Tube       in level
                                                                   45
                                                                                                  t            h           dh         K
                                                                   40                           (min)        (cm)         (cm)       (m/s)
                                                                                          1      0.0          0.0
                                                                   35
                                                                                          2      0.5          10.0         10.00    2.9E-05
                                                                   30                     3      1.0          21.0         11.00    3.2E-05
                                                                                          4      1.5          32.0         11.00    3.2E-05
                                                                   25
                                          y = 22x - 0.6                                   5      2.0          44.0         12.00    3.5E-05
                                           R² = 0.999              20                     6
                                                                                          7
                                                                   15
                                                                                          8
                                                                   10                     9
                                                                   5                     10
                                                                                         11
                                                                   0                     12
                                                                   -5                    13
       0.0      0.5        1.0      1.5         2.0          2.5                         14
                                                                                         15
                           Time t (min)                                                  16
                                                                                         17
                                                                                         18
                                                                                         19
      Calculation of Hydraulic Conductivity, K :                                         20
                                                                                         21
          π R 2 ∆h                                                                    22
                     0.5sinh-1  H  −      r             r 
      4.4                                      2  + 0.25 +                       23
             ∆t                 2r         H             H
                                                                                     24
K =
                                   2πH 2                                                 25
                                                                                         26
                                                                                         27
                                                                                         28
                                                                                         29
                                                                                         30
      Equilibrium Hydraulic Conductivity :                                               31
                                                                                         32
                                     Time                 Height                         33
              Start from     1        0.0                  0.0                           34
                End at       5        2.0                  44.0                          35
                      K = 3.2E-05 m/sec                                                  36

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2ND RFI - Attachment 4A - Stormwater Management Plan (2).pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.