Skip to the record
Beware of cheap imitations.

Original source · versioned page text

SWMP change reps

of 73

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (23.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

              POLLUTANT / ISSUE                  MINIMAL MEAN ANNUAL LOAD REDUCTIONS

          Total Suspended Solids (TSS)                                    80%

             Total Phosphorous (TP)                                       60%

               Total Nitrogen (TN)                                        45%

              Gross Pollutants (GP)                                       90%


5.3.2    Sources of Contaminants
Gross Pollutants

Gross pollutants include litter, grit and heavier sediments which can be mobilised from within or from
neighbouring sites.

Potential Causes

         •      Unsecured refuse areas.
         •      Un-landscaped areas prone to stormwater scour.
         •      Insufficient drainage for surface runoff from within the site.
         •      Wind Bourne transportation.



Mitigating Measures

         •      Well established refuse areas with ample storage bins. Fenced off where deemed
                necessary.
         •      Provision of ample litter bins across the commercial footprints of the site. Particularly in
                any outdoor dining or areas of congregation.
         •      Promotion of stormwater surface runoff through landscaped areas or similar sediment
                buffering strips/traps.
         •      Provide stormwater pits outside paved areas that receive runoff from areas prone to gross
                pollutants with surrounding buffering measures, such as stone pitching.
         •      Provide gross pollutant inserts into stormwater pits within paved areas that receive runoff
                from areas prone to gross pollutants.

Hydrocarbon Runoff:

Hydrocarbons can be mobilised and transported in stormwater runoff from the site. This can contaminate
stormwater runoff compromising Water Quality Objectives.


SCG Consulting Engineers                    Page 11                              SCG Ref: 33132(SWMP).RevC
Log in to download the original file

SWMP change reps.pdf · 23.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.