Figure 5.3 – Music Modelling Results
The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table
5.1. Details of the proposed bio-retention basin are detailed in the Stormwater Management Plan drawing
no: SCG 33132 - SW1.1 thru to SW1.4 (Appendix D.)
6.0 STORMWATER QUANTITY
Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, requires post development peak flows
leaving the development site will not exceed the pre-development peak flow rates for the required design
storms.
A Stormwater Quantity Analysis has been undertaken of the existing and developed site conditions in
accordance with the following guidelines.
− QUDM 2017
− Noosa Planning Scheme 2020
− Australian Rainfall and Runoff (ARR 2019)
The following section of this report discusses the proposed developments impact on peak stormwater
discharge from the site and the proposed mitigation measures to ensure a non-worsening effect is
achieved to downstream properties.
6.1 Drains Analysis
To calculate the peak discharges for the site under existing (pre-development) and proposed (post-
development) conditions. Hydraulic modelling has been undertaken for the site using the software
SCG Consulting Engineers Page 15 SCG Ref: 33132(SWMP).RevC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.