Original PDF page 27, section 1. The text section number identifies this passage in the reader.
8.0 CONCULSION The stormwater management report demonstrates under the detailed plans the proposed residential development at , Lots 75-77 RP 71151 & Lot 3 SP 208257, 79-83 Eumundi Noosa Rd & 26 Headland Dr, Noosaville meets the quantity and quality stormwater requirements as described in this report. Sediment generated during the construction phase is to be dealt with in accordance with a Silt and Sediment Control plan and is to be kept on-site throughout construction. The proposed development triggers the State Planning Policy 2017 stormwater quality treatment objectives. An on-site bio-retention basin, grassed swales and a water storage tank for re-use for landscaping irrigation has been incorporated into the proposed development to meet the prescribed water quality objectives, prior to discharging to the lawful point of discharge. On-site detention has been provided to maintain existing peak flow rates and to ensure a non-worsening to flooding of downstream properties. On-site detention is proposed to be contained within a mixture of underground tanks and the onsite bio retention basins and the designed to contain all flows up to a Q100 storm event. The subject site is not affected by localised flooding. SEAN RICHARDSON – RPEQ 5835 For and on behalf of SCG CONSULTING ENGINEERS SCG Consulting Engineers Page 25 SCG Ref: 33132(SWMP).RevC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.