1.0 INTRODUCTION SCG Consulting Engineers have been commissioned by Capital Prudential to complete a Stormwater Management Plan (SWMP) for a residential development at Lots 75-77 RP 71151 & Lot 3 SP 208257, 79-83 Eumundi Noosa Road & 26 Headland Drive, Noosaville. The proposed development involves the construction of 38 townhouse/apartment dwellings. The objective of this (SWMP) is to demonstrate that the following measures will be incorporated into the design and construction of the development: • Maintain stormwater quality – Protect receiving waters (during and post construction) • Manage stormwater peak flow rates of runoff and existing flow path characteristics • Protect against flooding • Adopt Water Sensitive Urban Design (WSUD) principles throughout • Implement Stormwater Harvesting and re-use for landscaping. This report should be read in conjunction with our detailed site stormwater management plans (Appendix D) Drawing No. SCG 33132 – SW1.1, SW1.2 & SW1.3 & SW1.4 The proposed development has been assessed against the following guidelines and planning documents: • Queensland Urban Drainage Manual 2017 (QUDM) • Water Sensitive Urban Design (WSUD) – Technical Design, Guidelines for South East Queensland • Noosa Plan 2020 • AS/NZS 3500.3:2018 – Plumbing and Drainage Part 3 – Stormwater Drainage • State Planning Policy 2017 • Sunshine Coast Stormwater Management Guidelines VI - 2020. • QDC MP1.4 – Rainwater Tanks & Other Supplementary Water Supply Systems • Water by design Stormwater Harvesting Guidelines SCG Consulting Engineers Page 3 SCG Ref: 33132(SWMP).RevC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.