s SCRC CORRESPONDEN

Vv
as aarp

$0018294
10 February 2009

ATTENTION: Ms Trish Sweeney wo ollam

 

Sunshine Coast Regional Council CONSTRUCTIONS
Locked Bag 72

SUNSHINE COAST MAIL CENTRE QLD 4560 since 1884
Dear Sir/Madam,

DEVELOPMENT PERMIT -.2005/353. REQUEST TO CHANGE AN EXISTING APPROVAL —
REQUEST. TO-EXTEND THE CURRENCY PERIOD

Please find enclosed our duly completed Form 2 — Request, to.Change an Existing Approval,

Owner's Consent and cheque for the application fee in the sum of $600.

  

ee seul

 

Quality
Endorsed
Company

With respect to item 11 of that document we set out the following details upon which we rely as
justification for this request;-

1. The development permit issued on the 15" March 2006. Clause 10 of the development permit
states it lapses if “the use is not happened by 31 March 2009 unless an application to extend the
currency is approved by council” obviously this currency period is less than the ‘normal’ 4 years in
which to commence the use.

2. Construction commenced on site simultaneous to construction on two adjacent sites (Lots 702 and
732) in or about August 2006. Construction has continued non-stop and in earnest since that date.

3. Unfortunately we have been troubled by three major issues, those being:

‘a. The impact of adverse wet weather regularly and for extended periods throughout
construction.

b. The availability of certain subcontractors, most particularly a Sheet Piling subcontractor
which in itself delayed work by 3 — 4 months.

c. The impact of poor performance by certain subcontractors. In particular we have experienced
significant difficulties with window manufacturers and installers who have failed to comply
with the contract and who initially delivered and installed windows which were not fit for
purpose. Those windows have needed to be taken out of the building and replacement
windows have been manufactured and are in the process of being installed. This has had a
significant effect given its consequentia! effect on other trades, for exampie, carpenters,
plasterers, plumbers and painters.

Our current program for works presently sees all construction on lots 702, 732 and the subject site,
703 complete by July/August of this year, subject to weather.

We therefore respectfully make the request that the period of time for the commencement of the use
be extended to the end of this year. Please contact the written if you require and further information
or assistance.

{eaied Ryko [3]3]o$
Paceiidee Towanhn [2}2109

 
 
  

afnconstructions.com.au QBSA No. 1343 NSW No. 165793C ACN 009 676064 ABN 94009676064 ATF Woollam & Son Pty Ltd’ Company

 

BRISBANE MACKAY ROCKHAMPTON BALLINA

71 Lytton Road 36 East Gordon Street 31 Quinn Street 31 De Havilland Crescent
East Brisbane Mackay Kawana Ballina

PO Box 7154 PO Box 1618 PO Box 5165 PO Box 5069

East Brisbane QLD 4169 Mackay QLD 4740 Central QLD MC QLD 4702 Ballina NSW 2478

ph : 07 3456 1600 ph : 07 4944 6000 ph : 07 4937 5000 oh : 02 6618 1300

fax: 07 3456 1650 fax: 07 4944 6050 fax: 07 4937 5050 fax: 02 6618 1350

Used in these records

About this file

File size
514 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05_0353 - Change to Development Approval [As Published].pdf · 514 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.