Peak Hour Turn Movement Major Road Traffic
From Major Road Volume Parameter
2018 Base Year Without Development
QR = 39 vph max during AM Peak Hour QM = 1041 vpd total two-way AM Peak Hour
QR = 41 vph max during PM Peak Hour QM = 1076 vpd total two-way PM Peak Hour
QL = 3 vph max during AM Peak Hour QM = 752 vpd total two-way AM Peak Hour
QL = 3 vph max during PM Peak Hour QM = 546 vpd total two-way PM Peak Hour
2028 Design Horizon Year With Development
QR = 73 vph max during AM Peak Hour QM = 1507 vph total two-way AM Peak Hour
QR = 99 vph max during PM Peak Hour QM = 1559 vph total two-way PM Peak Hour
QL = 6 vph max during AM Peak Hour QM = 1086 vph total one-way AM Peak Hour
QL = 9 vph max during PM Peak Hour QM = 781 vph total one-way PM Peak Hour
Figure 3.2: Warrant for Turn Treatments at Elm Street / Pearsons Road Intersection
(Source: DTMR Roads Planning and Design Manual, Chapter 13, Figure 13.23)
This intersection was assessed using SIDRA software modelling. The key outcomes from this analysis are shown below
in Table 3-2.
B14158ER01C | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
I TRAFFIC IMPACT REPORT.PDFRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.