Skip to the record
Beware of cheap imitations.

Council archive · source document

I Traffic Impact Report · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (3 of 3) - Traffic Impact & Acoustic reports.

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

3.2.2     ELM STREET (COOROY CONNECTION ROAD) / LAMONTS ROAD INTERSECTION

The anticipated development traffic movements at this intersection is up to 41vph total in each peak hour period
throughout the assessment period. The total background traffic anticipated in the base year 2018 at the intersection is in
the order of 1,492vph in the AM Peak and 1,546vph in the PM peak. The development traffic as a proportion of the total
background traffic movements at the intersection in the base year 2018 is less than 5%, being 2.7% in both the AM peak
and PM peak. In the design year 2028, the proportion of the development traffic is 1.9% in the AM peak and PM peak.
This is well below the general 5% threshold that triggers more detailed assessments. Notwithstanding, the TMR turn
warrants were examined for this intersection, for the traffic scenario of the base year 2018 only. Please refer Figure 3.3.




               Peak Hour Turn Movement From Major Road               Major Road Traffic Volume Parameter
            2018 Base Year Without Development
                     QR = 4 vph max during AM Peak Hour          QM = 1039 vph total two-way AM Peak Hour
                     QR = 14 vph max during PM Peak Hour         QM = 1075 vph total two-way PM Peak Hour
                     QL = 1 vph max during AM Peak Hour          QM = 753 vph total one-way AM Peak Hour
                     QL = 2 vph max during PM Peak Hour          QM = 544 vph total one-way PM Peak Hour
            2028 Base Year With Development
                     QR = 11 vph max during AM Peak Hour         QM = 1047 vph total two-way AM Peak Hour
                     QR = 44 vph max during PM Peak Hour         QM = 1082 vph total two-way PM Peak Hour
                     QL = 3 vph max during AM Peak Hour          QM = 755 vph total one-way AM Peak Hour
                     QL = 5 vph max during PM Peak Hour          QM = 549 vph total one-way PM Peak Hour

Figure 3.3: Warrant for Turn Treatments at Elm Street / Lamonts Road Intersection
(Source: DTMR Roads Planning and Design Manual, Chapter 13, Figure 13.23)




B14158ER01C | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                      COOROY RETIREMENT COMMUNITY | 15

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

I TRAFFIC IMPACT REPORT.PDF · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.