I Traffic Impact Report · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (3 of 3) - Traffic Impact & Acoustic reports.
2 EXISTING ROAD NETWORK 2.1 SITE ACCESS The local access streets that currently provide access to the site are Trading Post Road, the main access, and Lamonts Road, the secondary access. The development is proposed to be serviced by three accesses at Lamonts Road, Trading Post Road and Pearsons Road. The accesses at Lamonts Road and Trading Post Road are proposed to provide entry to the retirement resort Independent Living Units (ILUs) and community facilities. The Pearsons Road entry is proposed to provide access to the 120 bed Aged Care Facility and associated car park only. There is no internal connectivity between the 120 bed Aged Care Facility and the balance of the retirement resort. Vehicles travelling to the site will likely utilise Elm Street (Cooroy Connection Road) and then either Lamonts Road or Pearsons Road. Other roads in the vicinity of the site are Diamond Street (which becomes Tewantin Road (Cooroy-Noosa Road)) located further to the south which provides a link to Noosa and coastal areas to the east. Tewantin Road (Cooroy-Noosa Road) is accessed via the Elm Street / Diamond Street intersection, as Diamond Street becomes Tewantin Road (Cooroy Noosa Road) further east. The Bruce Highway situated to the west of the site is a major road corridor providing a north-south connection to regional destinations such as Gympie to the north, and Eumundi, Nambour, Maroochydore and Brisbane to the south. Bruce Highway is accessed either via Myall Street to the south (permitting, or via Elm Street (Cooroy Connection Road) to the north via the township of Pomona. 2.2 TRAFFIC DATA For the purpose of this traffic impact assessment, the future year traffic volumes were derived from previous traffic survey data as well as traffic count data obtained from Transport and Main Roads, refer Appendix B. A growth rate of 3.5% per annum, compounded annually was adopted to determine future traffic volumes from current data. This is considered to be a conservative assumption. The opening year, or completion of the works, is anticipated to be 2018. The design horizon year is 2028, that is 10 years from the base year of 2018. B14158ER01C | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
I TRAFFIC IMPACT REPORT.PDFRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.