Council archive · source document
080620 FINAL PN 2896 eReport June 08 V1.pdf [As Published] · 132008.1128
SUNRISE BEACH RETIREMENT VILLAGE
GRASSTREE COURT, SUNRISE BEACH
NOISE IMPACT ASSESSMENT
Table 5: Noise Impact Assessment Criteria
Time Noise Sensitive Place Limit (Refer Section 3)
7am – 6pm LAmax adj <= L Agb + 5 dB 38 dB(A) + 5dB
6pm – 10pm LAmax adj <= L Agb + 5 dB 35 dB(A) + 5dB
10pm – 7am LAm ax adj <= LAgb + 3dB 31 dB(A) + 3dB
The Environment Protection Regulations (1998) presents offence limits for mechanical plant
noise emissions. This mechanical plant includes refrigeration equipment and air conditioning
equipment. The offence limits are shown in Table 6 and the derived limits are shown in Table
7.
Table 6: Offence noise limits at a noise sensitive place
Period Noise level at noise sensitive place measured as the adjusted
maximum sound pressure level (L Amax,adj,T14 )
6 am – 6 pm LAmax,adj,T not greater than 50 dB(A)
6 pm – 10 pm LAmax,adj,T not greater than 50 dB(A)
10 pm – 6 am LAmax,adj,T not greater than the higher of:
40 dB(A) or
Background noise level plus 5 dB(A).
Table 7: Derived noise limits at a noise sensitive place
Period Noise Limit
6 am – 6 pm 43 dB(A)
6 pm – 10 pm 40 dB(A)
10 pm – 6 am 34 dB(A)
5.2 Assessment
To comply with these limits, there are a number of engineering solutions available. Low
noise levels are achieved by the engineered selection and application of:
Low sound power level equipment
Silencers
Acoustic enclosures
Noise barriers
Vibration isolation systems
The application of such principles and treatments, along with providing maximum separation
distances between noise sources and sensitive areas will ensure that noise from plant and
equipment complies with limits.
For noise sensitive places within the development noise impacts from mechanical plant
should be engineered not to exceed 40 dB(A) when measured inside apartments.
14 LAma x,a dj,T is obtained by making adjustments for tonality and impulsiveness as specified in AS1055
PN 2896 Report June 08 V1.doc| 20 June 2008 5 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080620 FINAL PN 2896 eReport June 08 V1.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.