Original source · versioned page text
Garnet Street RFI_20150513_ITC (Part 1)
Attached to the e-mail OPW15/0044 Response to Information Request Email 1 of 1.
Response
As part of the tender documents, the Contractor is required to submit a CPESC certified erosion and sediment
control plan and the works undertaken in accordance with all relevant environmental legislation. A certified
erosion and sediment control plan will be provided to Council prior to the commencement of the pre-start
meeting.
Should you require any further information, please do not hesitate to contact the undersigned.
Regards,
Brad Downes
BE (Env) MIE Aust RPEQ (Civil) CPEng (Civil)
Urban Engineering Principal - Sunshine Coast
SMEC Australia Pty Ltd
Attachments
1. Certification letter from Rob Stewart
2. Risk Assessments
3. Garnet Street Drawing Set
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.