ORDINARY MEETING AGENDA 15 JULY 2021
Plan No. Rev. Plan/Document Name Date
J206156 01A Contour Survey Plan, prepared by Kevin Holt 04/11/2020
Consulting
S4486 NA Site Plan, prepared by Stylemaster 21/01/2021
Sheet 02
S4486 NA Elevations, prepared by Stylemaster 21/01/2021
Sheet 04
S4486 NA Elevations, prepared by Stylemaster 21/01/2021
Sheet 05
Sunset Clause for Referral Agency Response
3. This Referral Agency response is no longer valid if the use has not commenced within 4
years of the date of this notice, unless otherwise extended in writing by Council.
Nature and Extent of Approved Use
4. The approved development is limited to the extent of fill proposed on the site. The
proposed dwelling house does not form part of this approval.
Flood Immunity, Drainage and Earthworks
5. All cut and fill must be in accordance with the Approved Plans.
6. Fill material placed over services must not impose any additional surcharge loading on
the service.
7. Excavation must not be carried out within 600mm of any utility infrastructure (to top, sides
and base of services). A retaining wall must be provided to support the soil surrounding
utility infrastructure where proximate to excavation activities.
8. Compaction with a vibrating roller must not be carried out within 600mm of any utility
infrastructure.
9. Other than for accessways, filling must not extend more than the fill/batter line as shown
on Approved Site Plan, prepared by Stylemaster and dated 21 January 2021.
10. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP6 - Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Erosion and Sediment Control
11. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be
likely to be released should rainfall occur, unless all reasonable and practicable
measures are taken to prevent or minimise the release and concentration of
contamination.
12. Sediment and erosion control measures must be in place prior to works commencing. If
such measures are not in place or are not satisfactory, “on the spot” fines may be issued.
Such fines can be issued if sediments from the site are found to enter or have the
potential to enter Council’s stormwater system, natural waterways, any downstream
stormwater filtration system or adversely impacting on other properties. It is the site's
Principal Contractor who is responsible for ensuring that the sediment and erosion
control measures have:
a. Been revised to address predicted rainfall events, and
b. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures
be found inefficient.
Page 12 of 47