NOOSA COUNCIL 10 YEAR CAPITAL PROGRAM
Row Labels Description 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030 Grand Total
Expansion Noosa Heads Pinaroo Park Pathway Lighting $ 20,000 $ 20,000
Noosaville Edwards Street Pathway $ 70,000 $ 70,000
Peregian Beach Shared Pathway Link to Boundary - Design $ 20,000 $ 20,000
Pomona School Road Pathway Linkage Planning and Construction $ 80,000 $ 80,000
Shire Pathway (Non-Trunk) Linkage Planning and Construction $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 3,000,000
Tewantin Butler Street & Crank Street Footpath & Pedestrian Refuge - Design $ 100,000 $ 100,000
Tewantin Furness Drive Bus Stop Pathway DDA Access $ 25,000 $ 25,000
Tewantin Goodchap Street Pathway Linkage Planning and Construction $ 25,000 $ 25,000
Tewantin Griffith Avenue & Golf Course Drive Pathways $ 270,000 $ 270,000
Renewal Noosa Heads Main Beach Boardwalk LED Lighting Renewal $ 120,000 $ 120,000
Noosa Heads Main Beach Boardwalk Renewal (Seahaven - to Western end) $ 1,000,000 $ 1,000,000
Noosaville Wallace Park Pathways Renewal Stage 3 & 4 $ 119,000 $ 119,000
Peregian Beach Plover Street Pathway Renewal $ 60,000 $ 60,000
Shire Pathway Renewal Program $ 332,000 $ 130,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 2,462,000
Sunshine Beach Belmore Terrace Pathway Renewal $ 100,000 $ 100,000
Upgrade Cooroibah Lake Cooroibah Road Pathway Connection from McKinnon Drive to Lake Cooroibah $ 715,000 $ 715,000
Cooroy Lake MacDonald Dr Pathway Connection to Botanic Gardens to Town Centre $ 877,500 $ 877,500
Cooroy Myall St Pathway Ferrells to Town Widen Replace (1035m) $ 336,375 $ 336,375
Cooroy Swift Drive Connection to Town Centre Cooroy Noosa Road Service Road to Olivine Street $ 25,000 $ 25,000
Cooroy Swift Drive Pathway Lake Mac Drive to Gumtree Drive $ 292,500 $ 292,500
Noosa Heads Precinct West End of Sofitel Boardwalk Design & Construction $ 105,000 $ 105,000
Noosa Heads Sunshine Beach Road Pathway Lighting Upgrade (Transit Centre to Bicentennial Drive) $ 100,000 $ 100,000
Noosaville Hoffman Drive Connection of Missing Link $ 27,245 $ 27,245
Noosaville Off Road Trunk Connect Venture Drive Through Reserve to Lane $ 80,000 $ 80,000
Noosaville Rene Street Connection of Missing Link $ 67,600 $ 67,600
Noosaville Sea Eagle Drive Pathway upgrats STIP Grant $ 195,000 $ 195,000
Noosaville Seacove Court Walter Hay Drive Connection of Missing Link $ 56,875 $ 56,875
Noosaville Ventura Drive Gateway Drive to Eumundi Road $ 131,950 $ 131,950
Peregian Beach David Low Way Pathway Service Road to Lane Beside No. 245 (275m) $ 89,375 $ 89,375
Peregian Beach Driftwood Drive Pathway David Low Way to Wavecrest Drive $ 22,750 $ 22,750
Pomona Pathways and Pedestrian Construction Stage 1 $ 150,000 $ 150,000
Shire Pathways & Boardwalks Trunk Network Upgrade - LGIP $ 435,000 $ 493,000 $ 909,000 $ 1,837,000
Sunrise Beach Heathland Dr David Low Way & Edward St Missing link and connections $ 543,012 $ 543,012
Sunrise Beach Off Road Trunk Pathway – Burgess Creek Pathway Extended to Wallum Lane (2100m) $ 477,750 $ 477,750
Sunrise Beach Wollomia Way Pathway Orient Drive to Dame Patti Drive $ 251,875 $ 251,875
Sunshine Beach Pacific Avenue Pathway Edward Street to Hill Street $ 221,000 $ 221,000
Tewantin Beckmans Road connection of Missing Link Noosaville State School to Cooroy Noosa Road $ 812,500 $ 812,500
Tewantin Furness Drive Tewantin Blackheath Drive to St Andrews Drive $ 149,500 $ 149,500
Tewantin Moorindil Street Pathway Poinciana Avenue to Toolar Street (77m) $ 25,000 $ 25,000
Tewantin Moorindil Street Pathway Toolar Street to Bus Turnaround West Side $ 397,150 $ 397,150
Tewantin Outlook Off Road Pathway Upgrade From Behind Hooper Cresent $ 320,000 $ 320,000
Tewantin Poinciana Avenue Pathway Upgrade $ 45,000 $ 45,000
Tewantin Poinciana Memorial Pk Pathway Upgrade $ 150,000 $ 150,000
Pathways & Boardwalks Total $ 766,000 $ 400,000 $ 1,170,000 $ 1,332,750 $ 1,632,500 $ 2,123,375 $ 2,276,995 $ 1,619,875 $ 1,601,762 $ 3,049,700 $ 15,972,957
Planning Scheme
Expansion Shire Project Team Resources for • Planning scheme amendment and supporting policy $ 366,000 $ 366,000
Upgrade Climate Change Adaptation Program $ 210,000 $ 210,000
Shire Project Place Based Approach - Placemaking Program $ 160,000 $ 160,000
Planning Scheme Total $ 736,000 $ 736,000
Public Amenities
Renewal Shire Public Amenities Planning & Construction $ 500,000 $ 500,000 $ 303,000 $ 293,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 3,596,000
Upgrade Noosa Heads Lions Park Upgrade Public Amenities $ 500,000 $ 500,000
Noosa Woods Park Upgrade Public Amenities $ 207,000 $ 207,000
Stan Topper Park Public Amenties Upgrade $ 197,000 $ 197,000
Public Amenities Total $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 4,500,000
Public Transport Infrastructure
Renewal Shire Bus Shelter Disabled Compliant Program: Year 7 $ 250,000 $ 250,000
Shire Bus Shelter Disabled Compliant Program: Year 8 $ 250,000 $ 250,000
Upgrade Cooroy Pines Road / Cooroy Belli Creek Road School Bus Safety Improvements $ 52,000 $ 52,000
Public Transport Infrastructure Total $ 250,000 $ 250,000 $ 52,000 $ 552,000
Sealed Roads Network
Renewal Noosa Heads Arkana Drive Median Strip Stabilisation $ 100,000 $ 100,000
Shire Kerb & Channel Renewal Program $ 130,000 $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 960,000
Shire Reseal Program $ 3,091,726 $ 3,745,440 $ 3,820,349 $ 3,896,756 $ 3,974,691 $ 4,054,185 $ 4,135,268 $ 4,717,974 $ 4,802,333 $ 5,300,000 $ 41,538,722
Shire Sealed Road Network Reconstruction Priority (Design & Construct) $ 700,000 $ 700,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 1,700,000 $ 1,700,000 $ 1,700,000 $ 10,100,000
Shire Sealed Road Network Rehabilitation and Reconstruction Priority (Design & Construct R2R) $ 790,000 $ 790,000
Upgrade Cooroy Mountain, Cooroy Mountain Road - Carriageway Widening $ 185,000 $ 1,665,000 $ 1,850,000
Federal Middle Creek Road Reconstruction $ 1,832,276 $ 1,832,276
Hinterland - Road Section Upgrades - (Design & Construct) $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 632,276 $ 2,132,276
Sealed Roads Network Total $ 3,881,726 $ 5,807,716 $ 4,835,349 $ 6,361,756 $ 5,574,691 $ 5,654,185 $ 5,735,268 $ 6,817,974 $ 6,902,333 $ 7,732,276 $ 59,303,274
Sports Ground and Facilities
Upgrade Cooran Chris Kenny Oval & Straker Park Upgrade Facilities & Field Resurfacing $ 952,200 $ 952,200
Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.