Skip to the record
Accept no substitutions.

Council archive · source document

Decision Notice - Approved by Delegation of Authority OPW21 0049 · OPW21/0049

of 1

Text shows just the words. Original shows the document exactly as it was published.

Officer: 	Diogo Carrico
Direct Telephone: 	07 53296465
Our Reference:	OPW21/0049
Your Reference:	.
10 June 2022
State of Queensland - Reserve for Park &
Recreation under control of Recreation under c
PO Box 141
TEWANTIN  QLD  4565

[email protected]

Dear Sir,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 9 June 2022, Council decided to approve the application subject to conditions.
Details of the decision are as follows:
application details
Application No:	OPW21/0049
Street address:	Claude Batten Drive
Real property description:	Lot 114 MCH 839107
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works – Prescribed Tidal Works
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
A10342-02-02	C	General Arrangement Prepared by BMT	26/05/2022
A10342-02-03	A	Typical Sections and Volumes Prepared by BMT	29/01/2022
Currency Period
The Currency Period for this development approval lapses if all conditions have not been complied with by 9 June 2026, unless an application to extend the currency period is approved by Council.
General Conditions
Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
All works must be undertaken in accordance with the conditions within SARA’s response reference No. 2103-21744 SRA & 2204-28271 SRA.
All works and structures associated with the works must be constructed wholly within the approved area.
Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
Safe pedestrian, vehicle and vessel access in the vicinity of the works must be maintained at all times.
The approval or conditions do not constitute a ruling on structural safety and the Applicant must make their own arrangements to ensure adequacy of design and work. Also, any approval granted does not warrant that such plans and specifications have been checked in detail, nor does it absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or statutory regulations in the execution and/or performance of said works. The Council does not accept any responsibility for the accuracy of such plans and specifications as approved.
Certification by a Registered Professional Engineer of Queensland must be submitted to Council at the completion of the works. The certification must state that the works have been constructed in accordance with best practice methods, are in accordance with Coastal Protection and Management Act 1995, are structurally sound and will have no detrimental affect on the river banks.
referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected]	Planning Regulation 2017 Schedule 10: - Part 5 – Environmentally Relevant Activities; - Part 6 – Fisheries; - Part 17 – Tidal Works or Work in a Coastal Management District.	The agency provided its response on 19/04/2022 (Reference No. 2103-21744 SRA & 2204-28271 SRA). A copy of the response is attached

Advisory notes
ADVISORY NOTES:
General Advisory Notes
The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully

Diogo Carrico
Development Engineer

Enc:	Appeal Rights
Referral Agency Response
Approved Plans/Documents
cc.	[email protected]
	Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer1.xml]
Page 42 of 44

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 44

[Attachment: image10.png (image text)]
Dog Beach Sand Nourishment Project: Marine Plant Monitoring Pan 5
Monitoring Plan

PLANS AND DOCUMENTS iy
feferectointhe REFERRAL We
[AGENCY RESPONSE, =

SARA: esas
Cate: A

 

2.2 Objectives
“The objective ofthis plan is to measure and evaluate the extent, conion and composition of lve
marine plans following constuction of the beach nourishment works and to implement adaptive
measures andlor corrective actions, as required, to ensure iving marine plants inthe cisturbance
area are consistent with pre-construction conditions or beter.

Reter to Noosa Spit Coastal Protection Environmental Assessment for pre-construction marine plant
conditions within the study ste (MT 6" January 2021: RA1032.002.00_ Environmental
‘Assessment docx)

 

2.3. Responsibilities and Obligations
"Noosa Shire Counclis responsible for implementing and reporting on tis plan.

 

2.4 Qualifications

“Monitoring and associated reporting shall be performed by a qualified ecoloaist with experience in
‘marine plant and fisheries habitat site assessments in south-east Queensiand,

25

 

‘+ A post construction monitoring survey within two months of construction completion
“© Survey conducted six months after the post-construction survey

‘Yearly fora period of three years after completion of the works.

Program timing may be adjusted in the event adaptive management measures and! or corective
actions are required.

“The monitoring programme can conclude after a period of three years following completion ofthe
‘works and once itis demonstrated there is no, to very low, potential for long-term impacts on living
‘marine plants associated with sand nourishment. Conclusion ofthe program shall be approved by
‘the Queensland Department of Agriculture and Fisheries (DAF).

2.6 Monitoring

Monitoring assessments ofthe study site will be undertaken by a suitably qualified ecologist fo
measure and evaluate lve marine plants and fisheries resources folowing construction and to
identty any potential management issues.
Site record sheets and permanently established photo monitoring points will be used for recording
and menitring marine plant condition, The assessment wil involve traverses ofthe entre study ite
to deserbe and map the presence of land-based marine plant communities and evidence of
associated fisheries habitat values. Site data wil be recorded at representative locations and will
include:

‘+ Photographs at established monitoring points

Gacmi-share'Admin\A10342.9 pb NoosaSpiSEMP desi ATO342 002.00 Marne Plant
Neco BMT


[Attachment: image11.png (image text)]
Dog Beach Sand Nourishment Project: Marine Plant Monitoring Plan
7 PLANS AND DOCUMENTS 4
Monitoring Plan foforesto inthe REFERRAL Wt
AGENCY RESPONSE, =
SARA ref eaRTasRA
Date Awa

27

28

 

 

* identification of dominant plant species, including native and exotic taxa
estimates of vegetation and species cover

‘+ description ofhabitat features, including fisheries resources and tidal infuence
+ georeferencing of signifeant features.

Evaluation and Adaptive Management

Adaptive management measures will be developed if the monitoring identifies:

+ direct disturbance to ving marine plant communities associated wih sand nourishment works

+ a reduetion in fing marine plant condition andlor extent compared with pre-construction
‘vegetation communities (efer Section 2.2) within a year of completion ofthe works; andlor

‘+ modified site conditions associated with sand nourishment works which may reduce the long-term
values or extent of marine plants, such as weeds and habitat modifications rendering conditions
‘no longer suitable for marine plant growth

‘Adaptive management measures may include pest control andlor ground works to promote
conditions suitable for local marine plants. This plan will be updated as required to reflect adaptive
‘management measures implemented,

‘Any changes to the monitoring plan shall be made in consultation with and approved by DAF.

Corrective Actions

Corrective actions may be required if te monitoring results indicate works associated withthe beach
‘Rourishment project could have a long-term impact or significant residual impact on living marine
plants.

‘Significant residual impacts on marine plants include:
‘+ Private works impacting on more than 17sqm of fish habitat; and

© there is a reduction in the extent of marine plants through removal, destruction or damage of
‘marine plants; or

© fragmentation or increased fragmentation of a marine ecological community; or

© adverse changes affecting survival of marine plants through modifying or destroying abiotic
(nonsiving) factors (such as water, nutrients, or sol) necessary for a marine plant's survival;

© alteration in the species composition of marine plants an ecological community, that causes
‘a dectine or loss of functionally important species; or

© interference with the natural recovery of marine plant communities.

Site-specific corrective actions will be determined in consultation with, and to be approved by, DAF.
“This monitoring plan will be updated to address remediation measures which may include:

Gacmi-share'Admin\A10342.9 pb NoosaSpiSEMP desi ATO342 002.00 Marne Plant
BMT

Neco


[Attachment: image12.png (image text)]
og Bech Sand Noutstmert Project Marine Pant Montorng Pa] pcs anp GODOMENTS ip
Monitoring Plan faorediomtnererera. Se!

[AGENCY RESPONSE
SARA ref ea3rusRA
Date: am

 

 

‘Site restoration (ground works to reinstate conditions suitable for marine plants; revegetation;
pest control);

“Direct offsets (onsitelofsite fish habitat enhancemenY/ restoration! rehabilitation! connectivity!
creation); and/ or

“Indirect financial ofsets.
‘Any changes to this monitoring pian shall be made in consultation with and approved by DAF.

 

 

 

 

 

 

 

 

 

2.9 Reporting
‘Table 2-1 outlines reporting requirements under this plan. All reports are to be submitted to and
signed off by DAF.

Table 21 Monitoring Report Requirements
Report Details = ="
‘Marne pan and shares [+ Within two months of Ouse eosogst
{esouree assessment ‘enanuston Sung
‘Socrdance wah plan, copied,
+ Scmonth flowing the est,
‘ost consuton meniong
Sivey,
+ Yost fora pars of ee
Yeas ier completion ofthe
Movie uniess alapive
‘ensures and corecive
‘sons ae mpiemented
Update oft panto retest | Asrecured Gied eosoost
‘opine management mesures
taka reared
Update oft planioretest | Asveaqured Giied econo
‘Shrecive soto taken
‘quedo a
1 Ste Restoration Plan, andor
+ Ofeet Davey Pan
Final Report surmaryand | Once Wis danonciatedatera | Guaifed cogs
Scmausioncetemontona | mvmom oes years eres
Pan roto very ew pote rong
{mm impacts on ng marine
plane

2.40  Finalisation
“The monitoring plan can conclude ater a period of three years folowing completion ofthe works and
‘once itis demonstrated there so, to very low, potential for long-term impacts on ive marine plans.
Conclusion of the program shall be approved by DAF.

lan sneenana2 mp NespSENP sg ABI en Pat &,

‘MP docx BMT


[Attachment: image13.png (image text)]
BMT has a proven record in addressing today’s engineering and
environmental issues.

Our dedication to developing innovative approaches and solutions
enhances our ability to meet our client's most challenging needs.

 

PLANS AND DOCUMENTS ip
referedto the REFERRAL [Ws
AGENCY RESPONSE =

SARAreh HOLT

Rod Date. waatam

 

 

 

 

 

- se
°
ww,
_
e
Sour @aurinsnvonmest © otros
a seer ve tats
Baca ior em
Sere ern 0 opens Reser set
Potro etna oo nin hou es 209 iia
co a ®
Tere sm Wear aesrous Titans
ei danse racers Tea lcenictgtton
Ena eotometgomjebicon En tomer
ren
oune srioey Mecca
ter gee SI atssmasee eve ate
(eure rato tite Sy Se 207 @
foes soos Titan
IEE axon IPS wars Toa acannon
sees oi bane
Eial‘enromimtmejebicon Ena enenmrttmibalcan a
(renee
ewe ret Pec Mada
[TE cogs ws toe
Nate Neerta300 fot resin at
weet Bae Auta? pei
fist oeear Seniseoechina en hamla cis hase
tot entenetebngebon tn Phat ra709
{eras o0 {a aincbegtaton
hte tht ect
Ne na a
Fin hes Aut 569 Landon ‘Seth adn Soe ute
foo egg vc Sint ‘ngenVRI
AE eosres00 nie oes
tnt latomat tian ee es uta 770
x 15 nec

Tal 020.9000 1566
Email envronmentukebmighbalcom

swrnbmtorg


[Attachment: image14.png (image text)]
 

 

ZOZOCOW a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘Auo suujod nore:
og ula seose ov
ox pew s1 Bul6 pes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


[Attachment: image15.png (image text)]
 

 

r

 

 

val BLOC ma

Led

FER

 

 

 

 

 

 

 

SaNTION aw SNOUSIE WOIAL

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(ein pees

 

 

 

 

 

 

 

 


[Attachment: image16.png (image text)]
Permit
Environmental Protection Act 1994

Environmental authority P-EA-100232409

“This environmental auonly is issued by the administering authority under Chapter 5 of the Environmental
Protection Act 1994

Environmental authority number: P-EA-100232409

Environmental authority takes effect on 0710472022
Environmental authority holder(s)

 

 

|Namets) Registered address
‘Noosa Shire Counel ‘Level 1, @ Pelican St, Tewantin GLD_
Environmentally relevant activity and location details
Environmentally relevant actvitylactivities Location(s)

 

ERA 10 - Extraction and Sereening 1: Dredging. ina | Lot 114 on MCHE3@107: and
year. the following quantity of material (b) more than

Unallocated State Land acjacent to Lot 114 on
10,0008 but not more than 100,000¢

McHe20107.

 

 

 

 

‘Additional information for applicants
End relevant activities

“The descripfon of any environmentally relevant activity (ERA) for which an environmental authority (EA) is
Issued sa restatement of the ERA as defined by legislation at the time the EA is issued. Where there is ary
Inconsistency between that description ofan ERA and the conditions stated by an EA as tothe seal, intensity
‘ec manner of caning out an ERA, the conditions prevalto the extent ofthe inconsistency.

[An EA authorizes the canying out of an ERA and does net authorise any environmental harm unless a condition
‘Stated by the EA specifealy authorises environmental harm.

‘A person carying out an ERA must also be a registered suitable operator under the Envienmental Protection
Act 1994 (EP Act

Contaminated tang

Itis a requirement of the EP Act that an owner or occupier of contaminated Ind give written notice tothe
administering authority they become aware ofthe flowing:

 

 


[Attachment: image17.png (image text)]
Permit

Environmental authority P-EA-100232409

=the happening of an event involving @ hazardous contaminant onthe contaminated land (notce must be
iven within 28 hours):

= _a.change inthe coniton ofthe contaminated land (notice must be given within 24 hours}: or
~_anotiable activity (as defined in Schedule 3) having been caried out, oris being carried cu, on the
‘contaminated land (notice must be given within 20 business days):
‘that is causing, ors reasonably kel to cause, serious or material environmental harm.
For further information. including the form forgiving writen notice, refer tothe Queensland Government website
nu cd cov.au, using the search term duty to natty.
Take efiect
Please note that, in accordance wih section 200 of the EP Act, an EA has effect
2) ifthe authorty is for a presorbed ERA and tates that takes effect on the day nominated by the
holder ofthe authority in 8 writen notice given to the administering authorty-on the nominated day: or
1b) ifthe authorty states a day oran event forit to take effection the stated day or when the stated event
Insppens: or
(©) otherwise-on the day the authority i issued,
However, ifthe EA is authorising an activity that requires an addtional authorisation (a relevant tenure fora
‘resource activity, a development permit under the Planning Act 2016 or an SDA Approval under the State
[Development and Public Werks Organisation Act 1971), this EA will not take effect unl the aditional
authorisation has taken affect.
If this EA takes effect when the adional authorisation takes effec, you must provide the administering
authority writen notice within § business days ofraeiving notfeation ofthe related additonal authorisation
taking eect
Ifyou have incorectyclsimad that an ational authorisation isnot required, camying out the ERA without the

‘adonal authorisation isnot legal and could resultin your prosecution for providing false or misleading
Information or operating without a valid environmental authority.

Amanda Gray Enquiries:
Department of Environment and Science (Coastal and Marine Assessment
Delegate ofthe administering authority Department of Environment and Science
Environmental Protection Act 1994

Date issued: 07 April 2022

Amanda fray,

 


[Attachment: image18.png (image text)]
Permit

Environmental authority P-EA-100232409

‘Obligations under the Environmental Protection Act 1994

In addition to the requirements found inthe condtions ofthis environmental authoriy, the holder mus also mest
‘their obligations under the EP Act and the regulations made under the EP Act. For example, the holder must
‘comply with the folowing provisions ofthe Act:

~ general environmental duty (section 318)
~ duty to noity environmental harm (secon 320-3206)

~ offence of causing serious or material environmental harm (sections 437-436)

= offence of causing environmental nuisance (section 440)

~ offence of depositing preseribed water contaminants in waters and related matters (section 44026)
= offence to place contaminant where environmental harm or nuisance may be caused (section 443)

 


[Attachment: image19.png (image text)]
Permit

Environmental authority P-EA-100232409

‘Conditions of environmental authority
Location: Lt 114 on MCH620107; and Unallocated State Land adjacent to Lt 114 on MCHE20107
‘Activity: ERA 161b) Dredging more than 10,000, but not more than 100,000, in a year.

‘The environmentally relevant actvite(s) conducted atthe location(s) as deserbed above must be conducted in
‘accordance with the following site-specific conditions ofthe approval.

‘Agency interest: General

Condition | Condition
number

 

st The quantity of material removed under this permit must not exoeed 20,000 tonnes per year

 

The acthity under this environmental authority must be undertaken between the months of April and|

 

a The activity under tis environmental aur must be conducted within the Bounds and
specifications ofthe folowing approved plans:
‘© General rangement, prepared by BMT. dated 26/05/2021, Drawing Number A10242-02-02
revision C.
‘+ Typical Sections and Volumes, prepared by BMT, dated 2810112021, Drawing Number A10342-|
02-03, revision B.

 

om ‘Dredge male authorised for placement on Lot 114 on MGHB30107 (Dog Beach) and the|
Unallosted State Land drecty adjacent fo Lot 114 on MCMSQ0107, as per General Arangement,
prepared by BMT. dated 2008/2021, Drawing Number A10342-02-02, revision C.

 

s [A reasonable and practicable measures must be taken to prevent or minimise environmental harm |
caused by the activity.

es [Any breach of a condition of his environmental authorly must be reported fo the administering |
[authority as soon ax practicable within 24 hours of becoming aware ofthe breach. Records must be

Kept inching fl datas ofthe breach and any subsequent actions taken.

ow ‘Other than as permitted by this environmental auhorly, the release of a contaminant into the|
[environment must not our

 

 

 

oe Environmental monitoring results must be Kept untl surender of this environmental authoriy. All other
information and records that are required by he condtions ofthis environmental authority must be ker

Hor a minimum of fve (6) years. Al information and records required by the condtions of this

environmental authority must be provided to the administering authority, or nominated delegate

‘pon request, within the required timeframe and in the spectied format

o [An appropriately qualified person(s) must moniter, record and interpret al parameters that are|
required to be monitored by this environmental authonty and in the manner specified by this|

 

 

 

 

 

 

 


[Attachment: image20.png (image text)]
Permit

Environmental authority P-EA-100232409

 

iO

[Al analyses required under tis environmental auhorly must be caried out by a laboratory that has |
National Association of Testing Authonties (NATA) cerficaton, or an equivalent ceriicaton, for such
analyses. The only exception to this condition i for in of montonng of water quality paramaiers

 

cH

[When required by the administering authority, monitoing must be undertaken in the manner
prescribed by the administering authority. to invesigate 2 complain of environmental nuisance |
[Srsing from the actviy. The moniforing recuts must be provided within 10 business days to the
administering authority upon ts request

 

cz

[Atleast five () business days prior to commencing a dredge operation, wien notfeaion must
be provided othe administering authority ofthe folowing:
“Commencement date f the dredge operation,

2. Expected end date ofthe dredge operation.

 

ons

The characterisation of sediments and sulabiliy for land based disposal of dredged material
‘must be submitted tothe administering authority in accordance wih methodology provided in
the stat ection ofthe:

‘National Environment Protection (Assesment of Site Contamination) Amendment Mescure:

‘© Queensland Acid Sulfate Sol Technical Manual ..and any other relevant guideline specified
by the administering authority, at 20 business days prot tothe commencement of he
‘dredging activity.

ows: sme respnsoity ae petro eta wcter evs caracensaton of seamen acuta 22559
isso ennronmersal value ssocated ue aredgngcanpag own fis nufoetal anor eles

 

ry

(Chemicals and fuels in containers of greater than 15 litres must be sored within a secondary
containment system

 

 

iS

 

Any containment area specifed in condition Gi must be cared by appropriately qualified
Persons) (e.g. registered professional engineer of Queensland) and msinisined to that

 

 

 


[Attachment: image21.png (image text)]
Permit

Environmental authority P-EA-100232409

 

oie

 

cr

 

ce

 

 

(Odours or abome contaminants must not cause environmental nuisance to any sensitive place or
‘commercial place,

 

 

 

 

 


[Attachment: image22.png (image text)]
Permit

Environmental authority P-EA-100232409

‘Agency interest: Water

 

 

[Te only contaminants to be released to surface waters ae:
1. Sediment necessarly disturbed during dredging at locations indicated in condition G3.

 

4

[Where the zone of influence of a sediment plume generated by the activity encroaches upon a|
| sensitive receptor, slightly disturbed or high ecological value waters, sediment plume associated
montoring (SPAN) Be undertaken a5 ews:
‘continuous visual monitoring: and
2. Spo-cheching (wecly and event based concer site montring wih contol site-based
checking).

 

i

“Mentoring of contaminant releases to waters must be undertaken in accordance with condition
W12 and records ofthe resits must be Kept.

 

Tn adation to WTT, the release to waters must not
1. Have any other properies ata concentration that is eapable of causing environment harm,
2. Produce any sick or other vise evidence of cor grease, nor contain vsble floating ol.

‘grease, sum, iter or other veualy objectionable matter.

 

i

(Dredging must cease f the plume from the removal of material extends beyond the limits of the sand|
extraction zone as per General Arrangement. prepared by BMT. dated 26/05/2021, Drawing Number]
10342-02-02, revision C.

 

 

 

u

‘Other than as permitted within this environmental auhoriy, contaminants must not be released to

 

“Trestment and management of acid sufatasols must comply wih the guidance provided ne
‘curent editon of the Queensland Acid Sulfate Soll Technical Manual.

 

 

[Neise generated by the activity must not cause environmental nuisance to any sensitive place oF
‘commercial place

 

 

 

 


[Attachment: image23.png (image text)]
 

Permit

Environmental authority P-EA-100232409

| Agency interest: Waste

 

Vt

 

 

All waste generated in carying out the activity must be reused, recycled or removed toa facity that
‘can lawfuly accept the waste,

 

 

 


[Attachment: image24.png (image text)]
Permit

Environmental authority P-EA-100232409

‘Key tems andlor phrases used inthis document are defined inthis secon and bolded throughout ths document.
‘Applicants should note that where a term isnot defined, the definiton in the Environmental Protecton Act 1994,
‘ts regulations or environmental protection policies must be used. a word remains undefined it has is ordinary

Activity means the environmentaly relevant activites, whether resource activites or prescribed activites, to
‘which the environmental author relates.

Administering authority means the Department of Environment and Science ors successor or predecessors

‘Alert levels represent ties in a hierarchy of inereasing environmental isk and are defined by trigger values.
“Three alert levels (low, mederate, and high) are fypically used in a management action Famework to indicate
adverse conditions and guide management responses that aim to prevent and minimise environmental harm.

Appropriately qualified person(s) means a person or persons who has professional qualifications, taining,
‘lls oF expetence relevant tothe nominated subject matter and can give authoritative assessment, advice and
“analysis t9 performance relative to the subject matter using the relevant protocols, standards, methods or
erature.

‘Commercial place means a place used as a workplace, an ofce or for business or commercial purposes and
Includes 2 place within the cutlage of such a place reasonably used by persons t that place.

‘Completion of dredging means dredged material has been removed from the dredged basin in accordance
withthe plans outined in condition G3.

‘Concem site means.a ste where a sensitive receptor oscus within the zone of influence ofa sediment plume.

‘Continuous visual monitoring means visual appraisal ofthe sediment plume extent and intensity as performed
by the dredge crew throughout the day on an ad hos basis (Le. whenever fis safe and nondisruptve to do so)
‘The continuous visual monitoring requirement is intended to faciitate an early response feature inthe dredge
‘management plan, so that the dredge operator remains copnisant of the extent and itensiy of the sediment
‘plume being generated and reacts according to the dredge management plan accordingly. This requirement must
‘be supplemented wih empirical dats (e.g photography. when water quay instuments are notin use) taken st
‘key indicative points inthe tidal eye (where applicable) to demonstrate the extent and intensity ofthe sediment
plume

Control site refers to 2 monitoring site located beyond the anticipated zone of influence of sediment plumes.
‘snd has site pairing with one or more test sites or sentinel sites. In monforing programs, contol sites sare
‘the same role as do reference sites but only fora defined subset of parameters

 


[Attachment: image25.png (image text)]
Permit

Environmental authority P-EA-100232409

 

 


[Attachment: image26.png (image text)]
Permit

Environmental authority P-EA-100232409

 


[Attachment: image27.png (image text)]
Permit

Environmental authority P-EA-100232409

‘Spot-checking refers toa non-continuous monitoring approach performed ata fixed distance and direction from
_amobile impact source (in the context ofthis guidance, dredging vessels) rat other key points of interest. Spat
‘checking may be routine of event-based, and may also include montering at fixed monitoring sites, such a
‘eference sites or control sites and tet sites or sentinel sites, hough the same stes nead not necessary
‘be monitored on every sampling event

‘Test sites 2 concem site that functions asa test point for compliance, is a monitoring ste stuated within the
_ea where a sensitive receptor cocurs and where environmental mentorng-reiated sessment ertera (eg.

‘Tidal land means land thats submerged at anytime by al water.

“Trigger values are physicochemical. parameter-specific measurement values used to indicate a condition where
‘an environmental value or senstive receptor may be at low, moderate or high risk, or some ciher Ask related
indestor.

Waters includes river, stream, lake lagoon, pond, swamp, wetland, unconfined surface water, unconfined water
‘natural or atfcial watercourse, bed and bank of any waters. dams, non tidal or dal waters (including the ea).
‘Stormwater channel, stormwater dain, radside guter, stormwater run-of, and groundwater and any par thereof

Zone of Influence of a sediment plume is, in its broadest application, defined by the dredge footprint and the
‘area beyond the dredge footprint where atleast some level of sediment plume-associated impacts are
‘Expected to occur. The overall zone of influence may be broken down into more fsk-felevant sub-categories,
‘such as the Zone of Unavoidabe Loss (the dredge footprint and immediately adjacent areas) the Zone of
‘Moderate Impact, oF the Zone of Marginal Impact, with each zone being defined according 10 ts purpose or role
in environmental management.

 

 


[Attachment: image28.png (image text)]
Permit

Environmental authority P-£A-100232409

“Attachments

(General Arrangement, prepare by BMT, dated 2008/2021, Drawing Number A10242-02-02 revision C.

“Typical Secsons and Volumes, prepared by BMT, dated 2/012021, Drawing Number A10242-02-03, revision B.
[END OF PERMIT

 


[Attachment: image3.png (image text)]
 

 

 

 

 

Baur

Dog Beach Sand Nourishment
Project: Marine Plant Monitoring
Plan

Reference: R.A10342.002.00 Marine Plant MP.docx
Date: June 2021
Confidential

7
N\


[Attachment: image30.png (image text)]
 

Val COZOCPEONY an

 

 

 

Cate

 

 

 

‘SaNMON oN SNOLLTES WOLdAL a

 

 

 

2sToua DSNESRNOS SOON |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


[Attachment: image31.png (image text)]
Development Assessment Rules—Representations about a
referral agency response

‘The following provisions are those set out in sections 28 and 30 of the Development Assessment Rulest
regarding representations about a referral agency response

Part 6: Changes to the application and referral agency
responses

 

28 Concurrence agency changes its response or gives a late response

28.1. Despite part 2, a concurrence agency may, after its referral agency assessment period and any
further period agreed ends, change its referral agency response or give a late referral agency
response before the application is decided, subject to section 28.2 and 28.3.

28.2. A concurrence agency may change its referral agency response at any time before the application
is decided it—

(a) the change is in response to a change which the assessment manager is satisfied is a change
under section 26.1; or

(b) the Minister has given the concurrence agency a direction under section 99 of the Act; or

(c) the applicant has given writen agreement to the change to the referral agency response

28.3. A concurrence agency may give a late referral agency response before the application is decided,
ifthe applicant has given written agreement to the late referral agency response.
284. Ifa concurrence agency proposes to change its referral agency response under section 28 2(a),
the concurrence agency must—
(a) Give notice of ts intention to change its referral agency response to the assessment manager,
‘and a copy to the applicant within § days of receiving notice of the change under section 25.1;
and
(b) the concurrence agency has 10 days from the day of giving notice under paragraph (a), or
{further period agreed between the applicant and the concurrence agency, to give an amended
referral agency response to the assessment manager and a copy to the applicant.

+ Pursuant to Section 68 of the Planning Act 2016

2 In the instance an applicant has made representations to the concurrence agency under section 30,
land the concurrence agency agrees to make the change included in the representations, section
28.2(c) is taken to have been satisfied

Page or2


[Attachment: image32.png (image text)]
Part 7: Miscellaneous

30 Representations about a referral agency response

30.1. An applicant may make representations to a concurrence agency at any time before the application
Js decided, about changing a matter in the referral agency response >

> An applicant may elect, under section 22, to stop the assessment manager's decision period in which
to take this action. Ifa concurrence agency wishes to amend their response in relation to
representations made under this section, they must do so in accordance with section 26.

Pagezor2


[Attachment: image33.png (image text)]
RAeN

ueensiand
Government

SARA reference: 2109-21744 SRA & 2204-28271 SRA
‘Council reference: OPW21/0080

19 April 2022

Chief Executive Officer
Noosa Shire Council
PO Box 141

‘Tewantin Qld 4565
mail@noosa .ald.cov.au

Attention: Daniel Wishaw

Dear Mr Wishaw

SARA response—Claude Batten Dr, Noosa Heads

(Referral agency response given under section 58 ofthe Planning Act 2016)

‘The development application described below was confirmed as properly referred by the State
‘Assessment and Referral Agency (SARA) on 31 March 2021

 

 

Response

Outcome: Referal agency response — with conditions

Date of response: 19 Apni'2022

Conditions: ‘The condions in Attachment 4 must be attached to any

development approval

Avice: Advice tote appvantis in Attachment 2

Reasons: ‘The reasons for the referral ageney response are in Attachment 3

Development details

Description: Development permit Material change of use for an
Environmentally relevant acy (ERA 16(1
(©) Dredging material mere tan 10,0008
but less than 100,000t per year)
operational work for Preserved ial works

SARA role: Referral agency

DA Advisory Team (DAAT)
‘Level 13,1 Witam Steet Brisbane PO
Bon 12000 CITY EAST ALD 4002


[Attachment: image34.png (image text)]
SARA trigger:

‘SARA reference:
“Assessment Manager:
Street address:

Real property description:
Applicant name:
Applicant contact details:

Environmental Authority:

Representations

2103-21744 SRA

‘Schedule 10, Part 5, Division 4, Table 2, tem 1 (Planning Regulation
2017). Development application for a Material change of use involving
Environmentally relevant activites.

‘Schedule 10, Part 6, Division 3, Subdivision 3, Table 1, tem 1
(Planning Regulation 2017). Development application for Operational
‘work involving the Removal, destruction or damage of a marine plants.

‘Schedule 10, Part 17, Division 3, Table 2, tem 4 (Planning Regulation
12017). Development application involving Operational work impacting
maritime safety

‘Schedule 10, Part 17, Division 3, Table 1 Item 1 (Planning Regulation
2017). Development application involving Operational work that is tidal
‘works.

2103-21744 SRA
Noosa Shire Council
‘Claude Batten Dr, Noosa Heads
‘On and adjacent to Lot 114 on MCH839107
Noosa Shire Council C/- BMT Global
348 Edward St
Brisbane QLD 4000
[email protected]
‘This referral included an application for an environmental authority
Under section 115 of the Environmental Protection Act 1994. Below
are the details of the decision:
* Approved
Reference: P-EA-100232409
+ Issue date: 7 April 2022
+ Prescribed environmentally relevant activity (ERA): ERA 16 -
Extraction and Screening 1: Dredging, in a year, the following
quantity of material (b) more than 10,000t but not more than
100,000

Ifyou are seeking further information on the environmental authority,
the Department of Environment and Science's website includes a
register. This can be found at: www.des.ald.cov.au

 

‘mn applicant may make representations to a concurrence agency, at any time before the application Is
‘decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4,

‘A copy ofthis response has been sent to the applicant for their information.

For further information please contact John Irving, Principal Planning Officer, on 4758 3421 or via email
[email protected] who will be pleased to assist.

‘State Assessment and Referal Agency

Page 2012


[Attachment: image35.png (image text)]
Yours sincerely

‘Steve Conner
Executive Director

cc _BMT Global, isa [email protected]

‘ene Altachment 1 - Referral agency conditions

‘State Assessment and Referal Agency

2100-21744 SRA

Page 3012

 


[Attachment: image36.png (image text)]
Attachment 1—Referral agency condi

 

2103-21744 SRA

 

(Under seation 58(1)0)0) ofthe Planning Act 2076 the folowing conditona rust be tached te any development
‘approval relating to this application) (Copies of the plans and specifications referenced below are found at
‘Attachment 5)

 

Conditions

Condition timing

 

Operational work

 

whieh
tothe

“The chief executive administering the Planning Act 2016 nominates the Director-General of te
Department of Transport and Main Roads to be the enforeement authority for the development to
this development approval relates for the administration and enforcement of any matter relating

following conditions:

 

1

(a) The construction, operation or maintenance of the approved
development must not damage or interfere (physically or by
electrical or electro-magnetic emissions) with any aid to
navigation.

(b) Inthe event that damage or interference is caused to any aid to
navigation, the Harbour Master must be immediately contacted
‘on (07) 3305 1700 and at the applicant's cost the damage or
interference must be promptly repaired, replaced or interference

(@)
At all times.

©)
As indicated

 

 

 

removed.
2 |(@) Provide writen notice to the Regional Harbour Master (Brisbane) | (a)
~ (address below), when the development authorised under this | At least 20 business
‘approval is scheduled to commence. days prior to the
‘commencement of
() Provide written notice to the Regional Harbour Master (Brisbane) | works
= address below), when the development authorised under this
‘approval has been completed
Each notice must state this application number, the location and | (b)
name of registered place and the condition number under which | Within 20 business
the notice is being given and provided to days of the completion
MSQ IDAS [email protected] or mailto: of works
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008,
3. |(a) Provide a Marine Execution Plan (MEP), prepared by an (a) and (o)

‘appropriately qualified person(s), to the Regional Harbour Master
(Brisbane) at MSQ_IDAS [email protected] or mailed to:
Maritime Operations Base
MacArthur Avenue East
inkenba QLD 4008

() The MEP must ensure the safe management of marine works
‘and should include:
i. forecasted start and end dates
Ji. ours of work
ii methodology overview
iv._contractor details of principal barges and marine

 

 

Atleast 20 business
days prior to the
‘commencement of
‘works

©
For the duration of
‘works

 

 

‘State Assessment and Referal Agency

Page 4012

 


[Attachment: image37.png (image text)]
2100-21744 SRA

 

‘equipment involved
¥. a Barge Mooring Plan
Vi. exteme weather contingency plans
vil. contact details for 24/7 communication during extreme
‘weather events and emergencies
vila Vessel Tratfic Management Plan
ix. marking of navigation hazards.

ic) Undertake the works in accordance with the MEP.

 

(a) Prepare a hydrographic survey (conducted to C class) of the
authorised dredging channel

(b) Provide a copy of the hydrographic survey to Regional Harbour
Master (Brisbane) at
MSQ DAS [email protected] or mailed to:
‘Maritime Operations Base
‘Macarthur Avenue East
Pinkenba QLD 4008

‘Within 20 business
days of completion of
‘the works

 

(@) All vessels, structures, plant and equipment associated with the
works must not impede the safe navigation of other ships or
restrict safe access to or from neighbouring structures, including
‘access across Noosa Bar.

(b) All vessels, structures, plant and equipment associated with the
works must be marked in accordance with the following
specifications:

i. dredging plant to include symbology indicating sate side to
pass

iL allbbarges are to be lt at night, including flashing yellow
lights, characteristics FI.Y.4s on all comers

i. any floating pipeline is to be marked by poles with retro-

reflective tape for daytime and flashing yellow lights,
FLY.4s, at regular intervals
|v. any submerged pipeline us to be marked by yellow special
‘marks indicating obstruction on the seabed
\¥. any barge anchors deployed must be marked with yellow
‘buoys and fitted with flashing yellow lights, characteristics
Fly4s

vi. temporary marker buoys may need to be laid to mark

extremities of work,

(c) Lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting

For the duration of
‘works

 

“The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Environment and Science to be the enforcement authority or the development to which
this development approval relates for the administration and enforcement of any matter relating to the
folowi

ing conditions:

 

 

é

“The dredging and beach nourishment must be undertaken generally
in accordance with the following plans:
i. General Arrangement, prepared by BMT, dated 26/05/2021,

 

 

For the duration of the
‘works

 

 

‘State Assessment and Referal Agency

Page 5 of 12


[Attachment: image38.png (image text)]
2100-21744 SRA

 

Drawing Number A10342-02-02, revision C, as amended in
red by SARA

li, Typical Sections and Volumes, prepared by BMT, dated
2910112021, Drawing Number A10342-02.03, revision A,

 

(@) Prepare a hydrographic survey (conducted to C class) of the
‘authorised dredging channel and beach nourishment area

(b) Provide a copy of the hydrographic surveys to:
‘palm@des ld gov.au or mall to:
Department of Environment and Science
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001

‘Within 20 business
days of the completion
of the works

 

(@) In the event that the works cause disturbance or oxidisation of
acid sulfate soil, the affected soil must be treated and thereafter
‘managed (unti the affected soil has been neutralised or
contained) in accordance with the current Queensland Acid
‘Sulfate Soll Technical Manual: Soil management guidelines,
prepared by the Department of Science, Information Technology,
Innovation and the Arts, 2014.

(b) Provide certification by an appropriately qualified person,
confirming that the affected soll has been neutralised or
‘contained, in accordance with (a) above is to be provided to
_palm@des ald gov.au or mailed to:

Department of Environment and Science
Permit and Licence Management
Implementation and Support Unit

GPO Box 2454

Brisbane Qld 4001

"Note: Appropriately qualified person means a person or persons who
‘has professional qualifications, training, skills and experience
relevant to soil chemistry or acid sulfate sol management and can
{ive authoritative assessment, advice and analysis in relation to acid
‘sulfate soil management using the relevant protocols, standards,
methods or literature.

(@)
Upon disturbance or
‘oxigisation until the
affected soil has been
neutralised or
contained

©
At the time the soils
have been neutralised
‘or contained

 

“The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Agriculture and Fisheries to be the enforcement authority forthe development to which
this development approval relates for the administration and enforcement of any matter relating to the
follow

ing conditions:

 

2.

“The dredging and beach nourishment must be carried out generally
in accordance with the following plans:

i. General Arrangement prepared by BMT dated 26/05/2021,
Drawing Number A10342-02-02 and revision C, as amended
inred by SARA

li, Typical Sections and Volumes, prepared by BMT, dated
29/01/2021, Drawing Number A10342-02.03, revision A,

For the duration of
‘works

 

 

10.

Impacts to marine plants associated with the beach nourishment is

 

‘At all times

 

 

 

‘State Assessment and Referal Agency

Page 6012

 


[Attachment: image39.png (image text)]
12102-21744 SRA

 

limited to the areas identified in Figure 2-1 of Dog Beach Sand
"Nourishment project: Marine Plant Monitoring Plan prepared by BMT
‘dated 29 June 2021, reference R.A10342,002.00 Marine Plant
MP docx, as amended in red by SARA, being

i. the permanent removal of 244.2 m of dead marine wood

li, _ the temporary disturbance of 45.9 m of subtidal detritus.

 

1

(@) Monitoring of impacts to marine plants must be undertaken
‘generally in accordance with Dog Beach Sand Nourishment
project: Marine Plant Monitoring Pian prepared by BMT dated 23
‘June 2021, reference R.A10342.002.00 Marine Plant MP.docx,
‘as amended in red by SARA,

(b) Monitoring reports must be submitted to
[email protected] in accordance with Table 2-1 of the
‘Dog Beach Sand Nourishment project: Marine Plant Monitoring
Plan,

‘As stated in the Marine
lant Monitoring Plan

 

12.

“The works must only be conducted between April and September to
minimise the impacts on fish spawning and the flowering and fruiting
of marine plants,

For the duration of the
‘works

 

18.

Enter into an agreed delivery arrangement to deliver an
‘environmental offset in accordance with the Environmental Offsets
‘Act 2014 to counterbalance the significant residual impacts on the
matter of state environmental significance being 244.2 m* of marine
plants.

Prior to commencing
any works that impact
fon the marine plants

 

14.

Provide written notice to [email protected], when the
‘development authorised under this approval:

(@)
Atleast 5 business
days but no greater

 

 

(@) wil start ‘than 20 business days
prior to the
(0) when it has been completed. tommencement of the
works
‘These notices must state referral response reference 2103-21744
SRA ©
Within 20 business
days of the completion
ofthe fisheries
development works
18. | Spoils managed to prevent acid soil development. At all times
16. | This fisheries development (as defined by the Fisheries Act 1984) | Atallimes

constitutes a place that is required to be open for inspection by an
inspector at all times, pursuant to section 145 of the Fisheries Act
1994.

 

 

7.

 

Marine plants that are temporarily removed, damaged or destroyed
by this development must be restored to pre-disturbance condition,

[Note: Marine plants are matters of State environmental signfcance under
the Environmental Offets Act 2014. Due tothe claims that rectoration will

‘eccur made inthis development application these have not been included in
_2 significant residual impact fr the purpose of caleulating an environmental

 

Within 5 years of|
removal, damage or
destruction of the
marine plants

 

 

‘State Assessment and Referal Agency

Page 7of12


[Attachment: image4.png (image text)]
 

Document Control Sheet

 

 

 

 

 

 

 

 

 

 

Document ‘RATOD#2, 002.00 Marne Plant MP docx
Sere acinar Tite ‘Dog Beach Sand Nourishment Project
Stesoustss Marne Plant Meritoing Plan
sor, pea arene Project Manager| Lisa MeKinnon

es eyo eres “Author ‘Sanne Richards

perceiver Client ‘Noosa Shire Cound

pon sroinenosat con

os (Client Reference:

‘Synopsis: This Monitoring Plan details procedures to assess long term impacts on marine

plants and fisheries resources fllowing installation of the proposed sand plugs
Sna'sand nourishment works at Dog Seach.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REVISION/CHECKING HISTORY
Revision Number_[Date Checked issued by
0 zeker fiw | Pree fom [ra |
DISTRIBUTION
Destination Revision

7D? [=]-[s[*[7[*[s]*
NSE POF
BMT Fie POF
BMT Lary POF

 

 

 

 

 

 

 

 

 

 

 

 

Setar eerie neemennirarems memes Sour

 


[Attachment: image40.png (image text)]
2100-21744 SRA

 

‘offset for this development. Faure fo rehabilfate or restore these marine
plants within 5 yeare wil represent unlawful removal damage or destruction
‘of marine plants under the Ficheriee Act 1994 fom that date

 

18.

Material used in the development (¢.9. debris, construction material,
‘soil, etc.) are to be promptly removed from the intertidal zone,

For the duration of the
‘works the subject of
this approval and to be
maintained

 

18.

Tidal land profiles that are temporafily disturbed by the development
‘works (other than those within the permanent development footprint,
‘as shown on General Arrangement prepared by BMT dated
26/05/2021, Drawing Number A10342-02-02 and revision C, as
‘amended in red by SARA, must be promptly restored to pre-work
Profiles.

‘Upon completion of the
‘works the subject of
this approval

 

Material change of use

 

“The chief executive administering the Planning Act 2076 nominates the Director-General of te
Department of Environment and Science to be the enforcement authority or the development to which
this development approval relates for the administration and enforcement of any matter relating to the

follow

ing conditions:

 

 

20.

“The dredging of up to 100,000t in a year is permitted generally in|
‘accordance with the following plans:

i. General Arrangement prepared by BMT dated 26/05/2021,
Drawing Number A10342-02-02 and revision C, as amended
ined by SARA

li. Typical Sections and Volumes, prepared by BMT, dated
29/01/2021, Drawing Number A10342-02.03, revision A,

 

 

‘tall times

 

 

‘State Assessment and Referral Agency

Page 8 of 12


[Attachment: image41.png (image text)]
2103-21744 SRA

Attachment 2—Advice to the applicant,

 

 

General advice

 

1. | Terms and phrases used in this document are defined in the Planning Act 2076 its regulation or
the State Development Assessment Provisions (SDAP) v2.6. Ifa word remains undefined it has
its ordinary meaning.

 

 

 

 

‘State Assessment and Referal Agency Page 2012


[Attachment: image42.png (image text)]
2100-21744 SRA

Attachment 3—Reasons for referral agency response
{Given under seston S07] of te Panning Ae? 2076)

 

‘The reasons for SARA’s decision ai

 

‘The proposal complies with State code 7: Mantime safety of the State Development Assessment
Provisions (SDAP) due to all vessels, structures, plant and equipment associated with the project will be
limarked in accordance with the required standards such that they do not cause a risk to navigation
safety.

‘The proposal complies with State code 8: Coastal development and tidal works of SDAP: Specially,
the development

‘+ will not adversely impact coastal processes

‘© enhances public use of, and access to and along state coastal land

‘The proposal complies with State code 11: Removal, destruction or damage of marine plants and:
‘Specially, the development:
‘+ maintains marine plant communities and protects ecological functions to which they contribute
‘+ minimises impacts of fisheries resources and fish habitats
‘+ the significant residual impact on matters of state environmental significance will be
counterbalanced through an environmental offset.

‘The proposal complies with State code 22: Environmentally relevant activites of SDAP: Specially, the
development
‘© Is located to minimise environmental harm on environmental values of the natural
‘environment, adjacent sensitive land uses and sensitive receptors
‘© avoids impacts on matters of state environmental significance, and where avoidance is not
reasonably possible, minimises and mitigates impacts
+ adequately mitigates impacts associated with the environmentally relevant activity.

Material used in the assessment of the application
* The development application material and submitted plans
* Planning Act 2016

+ Planning Regulation 2017

The State Development Assessment Provisions (version 2.6), as published by SARA
+ The Development Assessment Rules

+ SARA DA Mapping system

+ Human Rights Act 2019

 

‘State Assessment and Referral Agency Page 10 0f 12


[Attachment: image43.png (image text)]
2100-21744 SRA

 

Attachment 4—Change representation provi

{(p992 le intentonaly bank)

 

‘State Assessment and Referal Agency Page tt of 12


[Attachment: image44.png (image text)]
2100-21744 SRA

Attachment 5—Approved plans and specifications

 

{(p992 le intentonaly bank)

‘State Assessment and Referral Agency Page 12 0f 12


[Attachment: image45.png (image text)]
ee) NOOSA COUNCIL


[Attachment: image5.png (image text)]
Nourahment Project: Manne Pant Montlorng Pan i

 

 

reoresonmentrena, TP

 

 

 

Contents.

4 Introduction
2° Monitoring Plan

21 Scope:

22 Objectives

2.3. Responsibities and Obligatons

24  Qualfestions

25 Timing

28 Monitoring

2.7 Evaluation and Adaptive Management

28 Comective Actions

29° Reporting

2.10 Finalsation

List of Figures

Figure 2-1 Location of Marine Plant Disturbance 4
List of Tables
Table 2-1 Monitoring Report Requirements 7

Gomr

 


[Attachment: image6.png (image text)]
‘Dog Beach Sand Nourishment Project: Marine Pant Monitoring Pl 1

 

2409-21744 SRA: Counc reference: OPW21/0040)

“Rem 1: provide plane ehowing the location andar nm) ofall marin plans to be impacted by
‘the proposal, including dead wood and wrack Plans should include areas to bs both deci and
Indirect mpacted and clearly delineate areas of permanent and temporary dsturbance

+ Rem 2: provide 2 mentoring plan detaling how marine plant restoration will be monitored,
‘nluing an alert action plan to aderess any issues that may aise

Som

 


[Attachment: image7.png (image text)]
‘Dog Beach Sand Nourishment Project: Marine Plant Monitoring Plan 2

Monitoring Flan
LANG AND DOCUMENTS
scener aeseonse

a me eta

2 Monitoring Plan

 

 

 

 

 

 

24

“This Monitoring Plan (the plan) details procedures to assess long term impacts on marine plants and
fisheries resources associated with the construction and operation of sand nourishment works at
Dog Beach.

‘The plan willbe maintained for a period of 8 years after completion ofthe works unless corrective

actions are implemented,

“The plan provides the folowing elements:

+ Seope: actives and locations the plan applies to

+ Objectives: purpose of the monitoring plan

+ Responsibities and obligations for montoring and evaluation

+ Quaiicatons: mandatory qualifcations fr persons undertaking monitoring and evaluaton

+ Timing: sets the frequency and intervals for mentoring events

+ Monitoring: monitoring procedures to be implemented post-constuction including measures of
"vegetation cover and composition: ground/substatetidal conditions

+ Evaluation and Adaptive Management: procedures to evaluate monitoring results and implement
adaptive measures

+ Corrective actions: procedures to implement restoration andlor offsets
+ Reporting: requirements for monitoring and evaluation reporting,

Scope
Figure 2-1 shows the concept design forthe proposed works in elation marine plant communities.
‘The dune woodland adjacent to the proposed sand nourishment area comprises terestal
‘vegetaton sts above Highest Astronomical Tide and isnot considered to support direc sheres
values. However, the foredune supports sparse Cynodon daciylon and Melaleuca quinqueneria,
which canbe considered marine plants under the Fish Habitat Management OperatonalPocy. The
proposed sand nourishment fronting the dune willbe paced © avoid vegetaon and wil not recy
‘impact on ining main plants win the foreshore.

“The sand plug and sand nourishment a the eastern end of Dog Beach will ccur directly adjacent to
Avicennia marina, Excoecaria agallcha, Sporobolus viginicus and Sesuvium portlacactum
‘marine plants. Based onthe concept design forthe proposed works itis antspate there willbe no
rect impacts to marine plants within his area.

Fallen, dead trees on Dog each occur on land and are considered marine plants forthe
purposes of the Fisheries Act 1994, The fallen trunks will be smothered during sand nourishment
‘sulting in the permanent removal of approximately 244 2m of marine plants.

geese age


[Attachment: image8.png (image text)]
og each Sand Nourishment Project Man Plan Moitng Pian | pang nD DOGNENTS 3
Monitoring Plan feomtoneerersnra. te

 

AGENCY RESPONSE Se
Date ener

 

 

 

“The wastem sand plug may impact on 45.0m? of subtidal detritus which is considered marine plant
{forthe purposes of the Fisheries Act 1994. Itis ancipated detritus will reestablish folowing works.
‘and the impacts are likely to be temporary

In summary, the proposed works as illustrated in Figure 2-1 may impact on the following marine
plants:

+ permanent removal of 244.2? of fallen dead trees on tidal lands
+ temporary disturbance to 45.9m? of subtidal detritus.

tis not anticipated marine plants associated with the dune woodland or in intertidal zones at the
easter end of Dog Beach wil be directly impacted by the works

‘This plan will be implemented to monitor impacts associated withthe sand nourishment works on
land-based, live marine plants and to alert an action plan to address any issues that may have long
term impacts on fisheries resources.

ewrtosremnennemrnnms aye


[Attachment: image9.png (image text)]
 

 

wa. S) 1209 a wets eyo 290 THEOL UMBIDPgHESIESE=OMN AAS ZCOI MUUPMENS LURES

‘eouequmisig weld eure jouonescy 1-2 emnBig

 

pig Buyoyuoy
"i ued SuLoNuON weld SuLeH 3>eF014 WoUYSUNON pues Y>eER BQ

Used in these records

About this file

File size
6.0 MB (large file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority OPW21 0049.docx · 6.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.