Original source · versioned page text
Appendix D - Effluent Disposal System
GENERAL NOTES: ABBREVIATIONS
1. All Plumbing and drainage works are to be carried out in accordance with the Plumbing and Drainage AAV AIR ADMITTANCE VALVE ORG OVERFLOW RELIEF GULLY
AC AIR CONDITIONER PLV PRESSURE LIMITING VALVE
Act 2018, the Plumbing and Drainage Regulation 2019 and all relevant Australian Standards and
AES ADVANCED ENVIRO SEPTIC PM POST MIX
Codes. AT ABLUTION TROUGH RCP REINFORCED CONCRETE PIPE
2. These drawings are to be read in conjunction with Architects/ Designers, other consultants drawings AP ACCESS PANEL RL REDUCED LEVEL
BN BASIN RPZD REDUCED PRESSURE ZONE DEVICE
and Building and Plumbing approvals. BTH BATH S SINK
3. Plumbing and drainage work is not to commence until contractor is in possession of Council stamped BS BAR SINK SB SHOWER BATH
BT BUCKET TRAP SHR SHOWER
approved plans and Compliance Permit.
BWU BOILING WATER UNIT SL SURFACE LEVEL
4. The location of existing services on site have not been confirmed. The contractor must verify all C/A CEILING ABOVE SJ SWIVAL JOINT
locations of services before commencement of work. C/B CEILING BELOW SP SAMPLE POINT
CI CAST IRON ST STACK
5. The contractor is to verify that invert and surface levels and required cover over all pipes are correct COS CLEAR OUT TO SURFACE SW STORMWATER
and achievable before commencing work. C/O COMBI OVEN T/A TO ABOVE
CD CONDENSATE DRAIN T/B TO BELOW
6. Where the contractor deviates from the positions or locations nominated or adds additional fixtures or CI CAST IRON TD TUNDISH
makes other changes from the original design, the contractor will be responsible for the resubmission CS CLEANERS SINK TG TEST GATE
of any documents, and any additional fees. CU COPPER TYP TYPICAL
CV CONTROL VALVE TW TEMPERED WATER
7. The contractor is to compile as constructed drawings of the works during construction and to provide CW COLD WATER TMV THERMOSTATIC MIXING VALVE
a copy of the updated drawings to the Architect/ designer at the completion of the contract. CWD COLD WATER DROPPER TV TEMPERING VALVE
CWR COLD WATER RISER U URINAL
8. All materials are to comply and be installed in accordance with the relevant Australian Standards and CWEV COLD WATER EXPANSION VALVE U/B UNDER BENCH
manufacturer's instructions. DCV DOUBLE CHECK VALVE U/GRD UNDERGROUND
DF DRINKING FOUNTAIN UNO UNLESS NOTED OTHERWISE
9. All levels shown are Australian Height Datum (AHD) unless otherwise noted. DG DISCONNECTOR GULLY U/S UNDER SLAB
10. All sanitary drainage to be 100mm PVC installed at minimum grade of 1.65% (1:60) unless otherwise DP DOWN PIPE VB VANITY BASIN
DW DISHWASHER VC VENT COWL
noted. DIS/WC DISABLED WATER CLOSET VCP VITRIFIED CLAY PIPE
11. All existing services which are no longer required are to be removed or sealed off in an approved EJ EXPANSION JOINT VP VENT PIPE
manner. EPD ELEVATED PIPE DROPPER VPR VENT PIPE RISER
EXT EXISTING WC WATER CLOSET
12. All inspection openings under concrete are to be taken to surface level with approved flush mounted F/A FROM ABOVE WM WASHING MACHINE
removable caps. F/B FROM BELOW WP WASTE PIPE
FF FROG FLAP WS WATER SERVICE
13. All water pipe sizes nominated are Nominal Size (DN). Refer to AS/NZS 3500.1:2018 Table 1.1 for FFL FINISHED FLOOR LEVEL WU WALL HUNG URINAL
equivalent pipe sizes. FH FIRE HYDRANT
FHR FIRE HOSE REEL
14. All hose taps are to be fitted with appropiate backflow devices FSD FIRE SERVICE DROPPER
15. Locations of control valves are shown diagrammatically only. Determine location on site in an FSR FIRE SERVICE RISER
FU FIXTURE UNITS
accessible position. FW FLOOR WASTE
16. All stormwater is to be graded at 1% (1:100) unless otherwise noted. FWG FLOOR WASTE GULLY
GAL GALVANIZED
17. Advanced enviro-septic system is to be installed in strict accordance with manufacturer's written GIT GREASE INTERCEPTOR TRAP
instructions. GRD GROUND
GW GLASS WASHER
HC HOSE COCK
LEGEND HD HOUSE DRAIN
HDPE HIGH DENSITY POLYETHYLENE
ALL CONSTRUCTION WORK TO BE H/L HIGH LEVEL
SANITARY DRAINAGE & SANITARY PLUMBING
HW HOT WATER
SW SW SW STORMWATER DRAINAGE CARRIED OUT BY A QUALIFIED,
HWD HOT WATER DROPPER
COLD WATER SERVICE LICENSED INSTALLER
HWR HOT WATER RISER
HOT WATER SERVICE HWF HOT WATER FLOW
TEMPERED WATER SERVICE CONTRACTOR TO VERIFY ALL HWR HOT WATER RETURN
FIRE SERVICE MEASUREMENTS ON-SITE PRIOR TO THE HWU HOT WATER UNIT
WASTEWATER EFFLUENT LINE COMMENCEMENT OF ANY SUCH WORKS. IC INSPECTION CHAMBER
RAIN/TANK WATER SERVICE IJ INSPECTION JUNCTION
OOO OOO OOO
IV INVERT LEVEL
VENT PIPE www.envirowaterdesign.com.au
IO INSPECTION OPENING
PIPE RISER OR DROPPER IOS INSPECTION OPENING TO SURFACE
M: 0427 287 600
E: [email protected] - A: PO Box 639, Hervey Bay Qld 4655
SANITARY PLUMBING FIXTURE IM ICE MACHINE QBCC 15336345 ABN 35 622 809 376
WATER CLOSET FEATURE IW ICE WELL PROJECT:
CAPPED SANITARY SERVICE CLIENT:- __________ JU JUMP UP PROPOSED RESIDENCE
MIXED WATER SERVICE L/L LOW LEVEL
CLIENT:
TW TW TW TRADE WASTE LT LAUNDRY TROUGH
NS NS NS NEW COUNCIL SEWER CLIENT:- __________ LV LANDING VALVE
BROWYN SMIDT & KENNETH CLUCAS
G G G G GAS SERVICE LINE M WATER METER REAL PROPERTY DESCRIPTION:
EG EG EG EXISTING GAS SERVICE LINE DATE:- __________ MH MANHOLE LOT 8 ON RP162815
ETW ETW ETW EXISTING TRADE WASTE DRAINAGE MW MIXED WATER 8 HINTERLAND CLOSE
S S S EXISTING COUNCIL SEWER DRAIN BUILDER:- _ _ _ _ _ _ _ _ _ _ MWD MIXED WATER DROPPER
TINBEERWAH
cw cw cw EXISTING COLD WATER MWR MIXED WATER RISER
EXISTING HOT WATER NRV NON RETURN VALVE DRAWN: DESIGNED: QBCC
hw hw hw DATE:- __________ M.ALLWOOD A.SMITH 15336345
W W W EXISTING COUNCIL WATER MAIN NTS NOT TO SCALE
d d d EXISTING COUNCIL STORMWATER DRAINAGE OD OUTSIDE DIAMETER SCALE: DATE: JOB NO.
sd sd sd EXISTING SANITARY DRAINAGE NTS 24/01/2024 EWD4896
SW SW SW STORMWATER BY CIVIL CONTRACTOR THESE DESIGNS ARE COPYRIGHT AND ARE NOT TO BE USED SHEET SIZE: SHEET:
OR REPRODUCED WHOLLY OR IN PART WITHOUT THE WRITTEN
CONSENT OF 'ENVIRO WATER DESIGN' A3 6 OF 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.