From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
< ss Cardno . ARABIC phase. The effluent will be pumped to this tank via a pump station to be located within the proposed treatment plant compound. frrigation can then be carried out by gravity means to the nighlighted areas in Figure 4. A further storage holding tank will be constructed within the compound and will hold five (5) days of ADWF storage (as specified in the overview EMP). A main will be built to deliver effluent for irrigation purposes for the landscape gardens of the proposed lodge and interpretive centre area. In addition to irrigation, this effluent will also be used for flushing of the toilet fixtures to be installed in the lodge, café and interpretive centre facilities. This strategy will reduce the water demand and will assist in the overall water managemeni cycle of the Noosa North Shore Eco-Tourism Portal. It is proposed that an Irrigation Management Plan will be developed during the detailed design phase to meet any requirements that Noosa Council or the Environmental Protection Agency may request. The size of the irrigation areas has been determined from the evaluation of the results of a MEDLI Model that was prepared for this proposed development. This MEDLI Model is further discussed in section 4.3. As required by the National Water Quality Management Strategy “Guidelines for Sewerage co Systems — Use of Reclaimed Water, and as detailed in the EMP, a program will be developed and implemented to monitor effluent, surface and groundwater water quality to ensure the environmental values of the land and surrounding land are protecied. Treated effluent water will be tested at the nominated frequency for the quality of contaminants as defined within Table 3 of the “Guidelines for the Use of Reclaimed Water in Queensland” for Urban (Non-Potable) Class. The measurement parameters are to include, but not be limited to: continuous monitoring of turbidity, daily monitoring of any disinfection system, weekly monitoring of pH and biochemical oxygen demand; and monthly monitoring of thermotolerant coliforms. 6 @ @ @ The treatment plant will be designed with a monitoring system that will automatically, and at the frequency required, extract and test those parameters defined above. This automatic testing will exclude BOD testing, which will need to be conducted away from the plant. 5.2.1 Proposed SPTP Process Description Set out below is a summary of the process description for the type of package plant that is proposed for this development. Primary Treatment Ail sewage from the sewerage system enters the first of two (2) Primary tanks. The use of two Primary tanks, operated in series, ensures adequate treatment time and helps ~- 4 dampen flow variations to subsequent-treatment units. The Primary tanks provide three separate functions: 1. Solid-Liquid Separation — Incoming solid matter present in the sewage is separated from the waste water through gravity settling and flotation. Solids that settle to the base of the tanks are referred to as a sludge layer. Solids that float to the top of the tanks are referred to as the scum layer. PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 L.\7296-03\Reporf\FINAL REPORT - 18Sept03.dac Commercial in Confidence Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.11F.tifRelated documentApplication case desk ↗
About this file
- File size
- 64 KB (small file)
- File type
- TIF
No other editions are linked here.