Apdx 4 - SWMP
ingeniir
Plate 2: Infrastructure North of Site (Site highlighted Green)
It is achievable to maintain acceptable flows to Coral Tree Avenue from the site in accordance with IPWEAQ
standard drawing RS-081. It is noted that RS-081 applies to roof-water connections which implies that a 5%
AEP is the design event for the 25L/s per discharge location as per note 4.
The developed site in a 1% AEP event is expected to discharge a maximum of 55L/s (a pre-development
increase of 2L/s), and 38L/s in a 5% AEP with 2 proposed discharge points and will therefore comply with the
requirements of RS-081 without the need for on-site mitigation. Refer Appendix 2 | Rational Method
Calculations for pre and post development rational method calculations for the site.
5. STORMWATER QUALITY
5.1 Construction Phase
The State Planning Policy (DILGP, 2017) Appendix 2 – Stormwater management design objectives
Table A: Construction phase – stormwater management design objectives outlines construction phase
requirements for stormwater quality.
The following manuals (as a minimum) should be read and implemented by any contractor proceeding with
the development construction;
• State Planning Policy Appendix 2 Table A – available here
Ingeniir Pty Ltd | 221304-SMP-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 6 | 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original