Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
INTEGRATED PLANNING ACT 1997,
IDAS Assessment Checklist, Version 21.0, 3 September 2007
No
Ino, is any ERA an item 20 ERA (extracting rock or other material) intended to be located outside
waters?
oO No - Unless the application is consistent with any property development plan apptving to the land. and the
application is accompanied by an allocation notice, the Assessment Manager mus! refuse to receive it
(Complete Part G) This application requires assessment by the Administering Authority for the
purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act 2005. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction
as Concurrence Agency.
O Yes
If yes, does the ERA meet the following?
« the activity is located inside a flood management area and a (No OO Yes
borrow pit of not more than 10,000m} for -
» — specified works under the Wild Rivers Act 2005; or
« — residential complexes, as defined under the
Environmental Protection Act 1994
* the activity is located outside a flood management area {JNo [J Yes
if yes {0 either - Uniess the application is consistent with any property davelopment pian applying to the
land, and the application is accompanied by an allocation notice, the Assessment Manager
must refuse fo receive it, (Complete Part G) This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994
and, subject fo the relevant declaration for the wild river area, the Wild Rivers Act 2005. if
the Administering Authority is not the Assessment Manager for the application, the agency
has jurisdiction as Concurrence Agency.
if no to both - An application for the ERA would be taken to be not properly made and the Assessment
manager must refuse to receive it.
4
A 1A
WITHIN T
HE-LIMITS OF A PORT
14
eo part of the premises within the limits of a port under the Transport infrastructure Act 1994?
No
OO Yes
If yes, is that part of the premises below high water mark?
OO No .
(1 sYes - if answers to questions in ather sections of this checklist indicate that the proposed development is assessable under IPA,
schedute 8 - Answer (a) to (c) below. This application requires assessment by the Port Authority for the land. ff you
answer no to (a), (b) and (c) below, the Port Authority for the Port has jurisdiction as Advice Agency.
(a) Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?
LO No
(1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
(b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or
spoil grounds?
1 No :
CI) Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
(C)_ Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
0) No
(1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
Boe aed i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.