Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66

of 85

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
SEQ REGIONAL PLAN

 

 

3.11 Sree of the premises within the South East Queensland (SEQ) Regional Plan area?
No
OO Yes . . —.
If yes, is the application seeking approval for subdivision?
(O No
D1 Yes - Answer both {a} and (b) below

(a) Is any part of the premises located within a Major Development Area and not included in a structure plan as defined
under the SEQ Regional Plan Regulatary Provisions?

No
OO Yes
If yes, indicate whether 0 or not ef the following circumstances apply to the subdivision proposal — {Tick if applicable)
: The subdivision:
‘0 Creates lots with a size greater ‘than 1100 hectares CINo (Yes

 

i Creates a residual lot CINo D Yes

i) Creates the same number or fewer tots than the number of lots being subdivided [No - O Yes

 

 

 

‘ {ivy “Creates a single additional fot when 2 an existing loti is severed by aroadthatwas [JNo ((]Yes
gazetted before 2 March 2006

rn ee cee

 

 

| :) Creates a single additional lot for an emergency services facility Oo No , oO Yes
(vi) Creates single additional lot fora water cycle management infrastructure -—<LJNo C1 Yes.
4 (i) ‘Creates a single additional lot for waste management facility ONo 0 Yes
a Creates a single additional tot for r telecommunications inastuctue oO No a Yes ,
|) “Creates a single additional lot for electricity infrastructure : , ONo Dyes
| (x) Creates a single additional lat for cemetery 0 oracrematorium oO No OYes :

 

| (xi) Is carried out in association with a development approval for a material change of [.]No (1 Yes
use of premises that has not lapsed, if the development approval! was for a

i

! development application that was made before 31 October 2006
i wa eee me
i
i

(xii) Is ‘carried out in association with a development approval for a material change of ‘oO No (} Yes
use of premises that -

« — was given for development made assessable under SEQ Regional Plan
Regulatory Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and

+  hasnot lapsed

 

: iit) Creates lots fora purpose or is being carried out in association with development Eno (1 Yes
| other than those stated in (i) - (xii) above

 

 

To the extent the application involves other development under (xili) above - this application must be referred to the
Office of Urban Management (OUM} as
Concurrence Agency.

 

 

 

 

3 For the purposes of the SEQ Regional Plan, subdivision means - (a) creating a lot by subdividing another lot: or (b) dividing land into paris by agreement (other than a
lease for a term, including renewal options, not exceeding 10 years) rendering different parts of a lot immediately available for separate disposition or separate
occupation)

-— 2+ —

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.