08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.0, 3 September 2007
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44
ts any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a watercourse,
lake or Spring (other than under the Water Act 2000, section 202), (3) or (5)), or from a dam constructed on a watercourse?
No - —
(1 Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency
If yes, is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 20057
CI Yes — Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be
required for the purposes of the Wild Rivers Act 2008. Also, in certain circumstances an application for operational work is
taken to be nol properly made and the Assessment Manager must refuse to receive the application, (The refevant form for an
application would depend on the nature of the work)
0 No
If no, is the work for the following?
e —Awater pump (No [2 Yes (Complete Part Kz)
« Water storage CONo C1 Yes (Complete Part K:}
¢ — Gravity diversion from a watercourse (No (1 Yes (Complete Part Ke)
¢ — Watercourse diversion CI No [1 Yes (Complete Part Ke)
¢ — Other work for taking or interfering with water CNo LC) Yes (Complete Part Ko}
id nver atta;
PUG sentir 45a
45
Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
No .
(1 Yes - (Complete Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Hares dite
46
|s any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
No
{] Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
« — Awater resource plan under the Water Act 2000 Ono (Yes
¢ — Aregulation under the IPA or another Act UJ No C1 Yes
if yes to either or both - (Complete Pari Ka). This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) 1s any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a
wild river area declared under the Wild Rivers Act 2005?
[J No
| Yes - Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be
required for the purposes of the Wild Rivers Act 2005. Also, in certain circumstances an application for operational work
is taken to be not properly made and the Assessment Manager must refuse to receive it. (Complete Part Kyif an
application is made.)
4:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.