Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.0, 3 September 2007
DECLARED FISH HABITAT AREA; WILD RIVER AREA
413
ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994
no —
0 Yes
If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es)
« — The maintenance of existing structures, including for example the following structures, []No {(] Yes
if the structures were constructed in compliance with all the requirements, under any
Act, relating to a structure of that type -—
+ — Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;
« — Existing powerlines or associated powerline infrastructure
e Educational or research purposes relating to the fish habitat area C1No (1 Yes
* — Monitoring the impact of development on the declared fish habitat area Ono (Yes
© — Other purposes (No (1 Yes
If yes to “other purposes”, is that proposed operational work to be carried out in a wild river area declared under
the Wild Rivers Act 2005?
OO No- {Complete Part Oz} This application requires assessment by the Department of Primary Industries and Fisheries ~~
(DPI&F). If DPI&F is not the Assessment Manager for the application, the agency will have jurisdiction as
Concurrence Agency.
Ol Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes — Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment
by the Department of Primary Industries and Fisheries (DPI&F) and assessment for the purposes of the
Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.
O No
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
| No — Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Pert O2) This application requires
assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the
declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005.
If DPI&F is nat the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
An application for the operational work would be taken to be not properly made and the assessment
manager must refuse to receive the application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.