Skip to the record
Accept no imitations.

Council archive · source document

08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66

of 85

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

S EC Tl 0 N 5 The following question only applies when the application is seeking approval to carry out buifding work to the

extent the work is in a declared fish habitat area.

 

 

 

DECLARED FISH HABITAT AREA soo
5.1 | |s the-Proposed building work in a declared fish habitat area under the Fisheries Act 1994?
No
CO Yes

 

 

If yes, indicate what the proposed building work is reasonably necessary for (Tick applicable boxes)

« — The maintenance of existing structures, including for example the following structures, No [Yes
if the structures were constructed in compliance with all the requirements, under any
Act, relating to a structure of that type -

+» Boat ramps, boardwatks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;

+» — Existing powerlines or associated powerline infrastructure

« Educational or research purposes relating to the fish habitat area Ono (CL) Yes
* — Monitoring the impact of development on the declared fish habitat area Ono (Yes
© — Other purposes Ono OYes

Ifyes to “other purposes", is the proposed building work to be carried out in a wild river area declared under the Wild River
Act 2005?

(No - (Comptete Part Oz) This application requires assessment by the Department of Primary industries and Fisheries
(DPI8F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
O1 Yes
If yes, is all of the building work for specified works under the Wild Rivers Act 2005?

oO Yes - Unless the application is consistent with any property development plan applying to the land, the assessment
manager must refuse to receive it. (Complete Part O2) This application requires assessment by the Department
of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area,
assessment for the purposes of the Wild Rivers Act. if DPI&F is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency.

0 No
If no, is any of the proposed building work to be carried out in a wild river high preservation area?

(11 No - Unless the application is consistent with any properly development plan applying to the land, the
assessment manager must refuse to receive it. (Complete Part Oz) This application requires assessment
by the Department of Primary industries and Fisheries (DPI&F) and, subject to the dectaration for the
relevant wild river area, assessment for (ha purposes of the Wild Rivers Act 2005. If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(1 Yes - An application for ihe building work would be taken to be not properly made and the assessment manager
must refuse to receive it,

 

 

744+

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.