08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66

of 85

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

 

 

 

 

rebuilding
For more information go to schedule
2 table 4 of the IP Regulation.

Assessment period 5 days. No
response is a deemed refusal,

Creer a eaeinas may 114. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may

purposes trigger a referral to the focal government as the concurrence agency.

For more information go to schedule ‘

2 table 1 of the IP Regulation,

Assessment period 15 days. No —— — —- -~———|

fesponse is a deemed refusal. .

Design and siting 15. An application may trigger referral to the local government as the concurrence agency if the building

edict dkarheaa 90 te schedule work does not comply with the performance criteria of parts 11 and 12 of the Queensland

Assessment period § days. No Development Code.

response is a deemed refusal. 16. An application may trigger referral to the local government as the concurrence agency if the building
work does not comply with the qualitative statement for building clearance and site cover.

17. An application may trigger referral to the local government as the concurrence agency if the building

work does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the
Queensland Development Code, part 11 or 12.

a tans ee 18. An application may trigger referral to the local government as the concurrence agency to determine

For more information goto schedule the building will comply with the fire safety standard under the Building Act 1975 when the building

2 table 1 of the IP Regulation, work has been completed.

Assessment period 15 days. No

response is 3 deemed refusal,

tigher Ask personal appearance 149 An application may trigger referral to the local government as the concurrence agency to determine

For more inlormation go to schedule ifthe building work

2 table 1 of the IP Requilation and * — complies with the performance criteria of the Queensland Development Code, part 15; and

the QDC pat 15. © — the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No

response is a deemed refusall.

Burcing work for residentlat 20. An application for building work for premises in which residential care service under the Residential

Fox more infomation go to schedule Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will

2 table 1 of the IP Regulation and trigger referral to the local government as the concurrence agency.

the QDC part 20.

Assessment period 15 days. No

response is a deemed refusal. .

Building work for removal or 21. An application for the removal and/or rebuilding at another site of a building or other structure, will

trigger referral to the local government as the concurrence agency.

 

Building work for rainwater tank
tn designated rainwater tank area
For more information go to schedule
2 table 1 of the IP Requiation and
the QDC part 25.

Assessment period 15 days. No
rasponse is a deemed refusal.

 

22.

 

An application may trigger referral to the loca! government as the concurrence agency to determine

if the building work or structure complies with the relevant performance criteria if -

© Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of
relevant building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an
acceptable solution for a relevant performance criterion.

 

 

Disclaimer:

 

While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained
on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on
the information without first making your own enquiries regarding the interpretation and application of the applicable fegislation
to your circumstances.

To the full extent permitted by law DLGPSR expressly disclaims all liability (including but not limited to liability for negligence) for;
errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may
arise from your reliance on this process and the information contained on this form.

 

-47-

 

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.