Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 Septem ber 2007 Table L . . a QLeave Project Number Amount paid Date paid (6 digits, starting with A, B, E, Lor P) [ 1. OFFICE USE ONLY [Date received | ulrls ] [Reterence numbers | OS [otot ] ¥ t FOR COMPLETION BY ASSESSMENT MANAGER \s a Q)éave Notification and Payment Form required for this application? Table M No Yes ~ Complete Table M Column 4 Cotumn2 | Column 3 Column 4 Column § Column 6 i . Date receipted form Description af the work Amount pald | Date paid QLeave Project Number sighted by assessment | Name of oficer who (5) manager sighted the form f 4. NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To: L Council. | have been engaged as the private certifier for the building work referred to in this application. Date of i . engagement Accreditation number Name BSA Certification number Building classification Advice for completing Part A General advice Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’. The assessment manger may refuse to receive an application that Is not properly made. Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications, are stated in other Parts of Form 1.” The IAS Assessment Checktist must also be completed for all development applications, other than those requiring assessment against the Building Act 1975 only. For further information about completing this form go to IDAS Guide 1 (Making and IDAS application Qi The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common. Lot on plan details can be obtained from title documents or through the focal government. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the and). The term ‘land’ is also defined to include the estate in, on, over or under the land. A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA) only. Instead complete Q1(a). Strategic Port Land is within a local goverment area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port Land is declared under the Transport Infrastructure Act 1994. For further information go to [DAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. Q2 Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. . Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.