Council archive · source document
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published] · 142008.66
Field Investigation Report cont'd Client: JOHN TITMUS CONSULTING ENGINEER Job No: 15158 Site Location: No. 23 Edward Street, NOOSAVILLE Your Ref: OCP Values Bore No.: 3 0 eee 2 Location: 7.5 metres front boundary. 1.5 metres left hand (southern) side boundary. 0.2 1 122 2 0.31 12.3 2 0.4 3 124 2 05 3 (25 2 06 1 126 2 0.7 2 [2.7 2 08 3 (2.8 2 09 3 129 3 10 3 |3.0 2 1.1. 3 13.1 3 1.2 3 132 5 5 133 7 14 5 [3.4 18 15 3 13.5 16 4 (36 41.7 3 13.7 18 3 138 19 3 139 2 |40 DCP Values Bore No.: 4 0 et 3 Location: 5 metres rear boundary. 1.5 left hand (southern) side boundary. 0.2 14 42.2 2 03 4 42.3 2 04 4 424 2 0 142.5 1 a. 2.6 1 0.7 1 :42.7 2 08 2 128 2 09 3 12.9 2 10 4 |30 2 1.1 5 [3.1 2 1.2 3 132 5 1.3 3 133 9 14 3 |3.4 10 15 3 |3.5 19 16 2 136 1.7 3 |37 418 2 138 19 3 13.9 2.0 3 14.0 Wednesday, 24 October 2007 Page 3 of 5 i 2.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.