CONSULTING ENGINEERS 108 No. DMG No.| ISSUE
- 4 Easton Street (Cnr Maud Street), Maroochydore OLD 4558, APPENDIX A | APPA | _A

 

 

Telephone (07) 5443 6585 Facsimile (07) 5479 1754 IDRAWN |SCALE |DATE
Postal Address PO Box 5960 Maroochydore BC OLD 4558 | JTT | NTS.) SEPT 98”
JOB

APPENDIX A RESIDENTIAL FOUNDATION DESIGN

 

 

 

 

 

 

 

 

CONCRETE SPOON DRAIN 7

 
   
  

 

 

 

 

 

OR GRASSED VEE DRAIN !~
120 120
MIN FALL MIN FALL
—. —~<—
Lj ~~ &
GRop s
NN TR Fee Fe _ ce
AG PIPE & RUBBLE ATION REMOVAy—~
DRAIN REFER NOTE 2

 

RETAINING WALLS GENERALLY REQUIRED
WHERE BATTERS EXCEED A MAXIMUM FALL
OF 2 INS.

RETAINING WALLS GENERALLY REQUIRED

IF PLATFORM CANNOT EXTEND S x FILL DEPTH
FROM FOOTING LINE.

(ENGINEER DESIGN RECOMMENDED)

NOTE:
“MBD* - DENOTES MINIMUM BATTER DISTANCE
REFER TO LOCAL AUTHORITY REQUIREMENTS
FOR MINIMUM BATTER DISTANCE FROM BOUNDARY

NOTES:

1. ALL TOPSOIL CONTAINING VEGETATION AND ORGANIC MATERIAL IS TO
BE STRIPPED FROM THE CONFINES OF THE CONSTRUCTION SITE.
THE FILL MATERIAL AND THE TOP 150mm OF NATURAL MATERIAL IN ANY
CUT SECTIONS ARE TO BE COMPACTED (IN LAYERS FOR FILL MATERIAL)
TO ATTAIN A UNIFORM FIELD DENSITY OF 95% OF ITS RELATIVE DRY DENSITY.
THIS DEGREE OF COMPACTION IS TO BE VERIFIED USING A COMPACTION TEST.

THE COMPACTION TESTING IS TO BE IN ACCORDANCE WITH TEST No. El.1, E3.1, E4.1 AS1289-199}
(STANDARD) ,

2. IF GROUNDWATER 1S ENCOUNTERED OR THE SITE IS KNOWN TO HAVE A HISTORY OF

GROUND WATER PROBLEMS, A SUB-SURFACE RUBBLE DRAIN WITH SLOTTED AGRICULTURAL
PIPE WILL BE REQUIRED.
THE DRAIN IS TO HAVE A MINIMUM DEPTH OF 1200mm OR TO THE MAXIMUM DEPTH OF FILL.
5. BUILDING PLATFORM TO FALL AWAY FROM HOUSE AT 1 IN 20 MINIMUM, IF FALL

IS TO BE ACHIEVED BY PLACING TOPSOIL AFTER THE FOOTINGS ARE CONSTRUCTED.
OVER EXCAVATE THESE AREAS AS REQUIRED TO COMPLY WITH LOCAL AUTHORITY
REQUIREMENTS REGARDING DIFFERENCE BETWEEN SLAB HEIGHT AND FINISHED GROUND LEVEL
(GENERALLY 225mm MINIMUM)

DRAINAGE ON FLAT SITES TO BE ACHIEVED BY INCREASING SLAB LIFT OR USING IMPORTED FILL
PLATFORMS.

4. DISCHARGE DOWNPIPES VIA BUBBLERS AWAY FROM FOOTING.

 

5. REFER CSIRO INFORMATION PAMPHLET 10-91 FOR SITE FOUNDATION MAINTENANCE.

1200 1200 "BD"

  

PROPERTY BOUNDARY

 

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0066 - Operational Works - Landscaping, Drainage Works & Stormwater [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.