Skip to the record
Accept no imitations.

Council archive · source document

SUPERSEDED Negotiated Decision Notice - Concurrence Agency - DNRW [As Published] · 132007.2399

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                       2007/2399



43.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the private roads/driveways shall have the
      first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross
      pollutant trap provided on site prior to being permitted to discharge into the lakes.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly onto the golf course, bypassing the grease/oil
      arrestor/gross pollutant trap.

      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.

      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
44.   All site stormwater drainage shall be by means of a gravity system.
45.   All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
      circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to the issue of Operational Works
      approval and will be determined on the unit rate basis current at the time of approval.

Sewer Mains
46.   Prior to endorsement of the Plan of Survey for Stage 1, the new parcel shall be connected to
      Council’s existing sewerage reticulation systems and be constructed in accordance with
      Council’s standards and requirements at no cost to Council. This work may be covered by an
      uncompleted works bond at 150% of the value of the connection that can be in place for a
      duration agreed to by the Manager Land Development.
47.   Prior to endorsement of the Plan of Survey for Stage 2, the existing sewer main, rising main
      and effluent main that traverse the site shall be relocated generally in accordance with Tate
      Professional Engineers drawing No. C1732/07/J/P04 dated 19/11/07.
48.   Prior to endorsement of the Plan of Survey for Stage 2, if required the applicant shall upgrade
      any existing sewer services (including pumps or pump station) at no cost to Council.
49.   To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
      As such the applicant shall amend Operational Works plans including Building plans to ensure
      compliance.
50.   Design for a sewerage system to connect all new lots within the site to Council's existing
      sewerage reticulation system shall be to the standards and requirements set out in Council’s
      Engineering Design Standards. If the design requires the construction of a pump station and a
      rising main, the connection point to Council's existing system will be nominated by the
      Manager - Land Development.
51.   All connections to sewer system shall be carried out either by Council or by a Council
      approved Contractor and at no cost to Council.
                                                                                          9 of 26

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Negotiated Decision Notice - Concurrence Agency - DNRW [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.