Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013
Original PDF page 35, section 6. The text section number identifies this passage in the reader.
|
| | |
|
| || |
| || |
\
| | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | |
|
| | | |
\
RM
|
4. THE EXCAVATION IS TO BE MAINTAINED IN A DRAINED STATE FOR THE PERIOD OF
\
/ \/ \ / \ / \ / \ / \/ \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \/ \
\
\
CONSTRUCTION VIA THE USES OF TEMPORARY SUMPS & PUMPING TO DISCHARGE TO
\
RM
E/UG
E/UG
NOTE:
\
\
E/UG
E/UG
THE EXTERNAL STORMWATER SYSTEM.
\
EARTHWORK QUANTITIES ARE NET VOLUMES. NO
/ \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \/ \ / \ / \ / \ / \
RM
\
E/UG
H-2.7 H-1.7
\
\
RETAINING WALL REFER ALLOWANCE HAS BEEN MADE FOR BULKING OR COMPACTION.
\
RM
\
5. ALL EXCAVATIONS TO BE BATTERED BACK AT THE MATERIAL'S ANGLE OF REPOSE OR
\
\
STRUCTURAL DWGS FOR
\
SHORED VIA SHEET PILING OR OTHER APPROVED METHODS.
RM
\ \
DETAILS
\
\
RM
\
\
SECTION E
\
EARTHWORKS NOTES:
\
RM
\
\
DWG R08