Skip to the record
Accept no imitations.

Original source · versioned page text

Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013

of 105

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

      d.   disabled parking spaces as shown on the approved plans; and
      e.   dimensions, crossfalls and gradients in accordance with Australian Standard
           AS2890: Parking Facilities.
22.   All car parking areas and access driveways must be maintained exclusively for vehicle
      parking and manoeuvring and kept in a tidy and safe condition at all times.
23.   Directional signage must be provided to direct visitors and customers to the car parking
      spaces provided on site.
      Pedestrian and Bicycle Facilities
24.   Pedestrian and bicycle facilities must be provided for the development. The works must
      be undertaken in accordance with the conditions of this Decision Notice and must
      include in particular:
      a.   a 2 metre wide concrete footpath within the road verge, the same colour as the
           existing (dark), for the entire length of the site’s frontage to Doonella Street;
      b.   a 2m wide concrete pathway for the full length of the ‘public thoroughfare’
           easement, along the full length of the easement located along the northern
           boundary
      a.   pedestrian pathways between the proposed car parking area and the building/s;
      b.   adequate separation of all specific pedestrian routes from vehicle access and
           manoeuvring areas, and clear demarcation by pavement marking, signposts or
           changes in surface materials or levels;
      c.   signage and lighting at strategic locations to direct people to building entries and
           public toilet facilities;
      d.   bicycle parking spaces and lockers as shown on the approved Ground / Carpark
           Plan (Plan SD02, Iss.12).
      Stormwater Drainage
25.   The site must be provided with a stormwater drainage system connecting to a lawful
      point of discharge. The works must be undertaken in accordance with the conditions of
      this Decision Notice.
      Services
26.   Unless otherwise stipulated by telecommunications legislation at the time of
      construction, the development must be provided with all necessary conduits, pits and
      pipes to accommodate the future connection of optic fibre technology
      telecommunications.
27.   Certification must be submitted to Council from all relevant service providers (Energex,
      NBN and Unitywater) which certifies that the development has met the requirements of
      this Decision Notice and all applicable legislation at the time of construction.
      Easements
28.   A 3 metre wide easement for “Public Thoroughfare” must be registered against the title
      of the property in favour of Council. The easement must be located as shown, in red, on
      Drawing No. SD03, titled “Level 1 Plan”, Issue 10, dated 31/05/2021 and prepared by
      Archicology P/L.
29.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.




                                              4

Log in to download the original (Appeal judgement 30-32 Doonella St Tewantin - MCU21-0013 OPW21-0013.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.