Skip to the record
Every meeting, every word.

Council archive · source document

Review of Essential Urgent Bushfire Management at Noosa Civic - September 2019 · RAL18/0023

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                    Attachment 2
                     Law No. 10 (Vegetation Management) 1;


              d)     clearing which is reasonably necessary for carrying out work that is —


                     1. authorised or required under an Act, regulation or local law; or
                     2. specified in a notice given by the local government or another regulatory
                        authority;


              e)     clearing in accordance with a development approval;


              f)     clearing on a category 1 lot, where —

                      1. the vegetation is within three (3) metres of an existing building or structure; and
                      2. the clearing is reasonably necessary for access to the building or structure or has
                         been approved in a landscape plan; and
                      3. the vegetation is not otherwise required to be retained in accordance with a
                         development approval;


              g)     clearing on a category 2 or 3 lot, where —


                      1. the vegetation is within ten (10) metres of an existing building or structure; and
                      2. the clearing is reasonably necessary for access to the building or structure or has
                         been approved in a landscape plan; and
                      3. the vegetation is not otherwise required to be retained in accordance with a
                         development approval;


              h)     clearing on a category 3 or 4 lot greater than ten (10) hectares in area, where —


                      1. the vegetation is within 30 metres of a building or within ten (10) metres of a
                         structure; and
                      2. the clearing is reasonably necessary for the control of fire risk to the building or
                         structure; and
                      3. the vegetation is not otherwise required to be retained in accordance with a
                         development approval;


              i)     clearing vegetation within the path of a utility service;


              j)     clearing on a category 1, 2 or 3 lot, where the clearing —


                      1. is pruning of native vegetation for the purpose of tree maintenance or hazard
                         management; and
                      2. results in no more than 20% loss of the live canopy volume of a tree within a 12-
                         month period; and
                      3. does not involve lopping or topping;



1
    Copies of property vegetation management plans can be obtained from the Noosa Council offices

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Review of Essential Urgent Bushfire Management at Noosa Civic - September 2019.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.