Appendix F - Bushfire Hazard Assessment and Managment Report
Bushfire Report
3.3 AS 3959:2018 Construction of Buildings in Bushfire-Prone Area
Where development is proposed in designated bushfire prone areas, AS 3959:2018
provides construction requirements designed to enhance resistance against bushfire
attack. These construction specifications are determined by specific heat flux
exposure thresholds and are categorized into six Bushfire Attack Levels (BAL):
Radiant Heat
Bushfire Attack Level Description of Predicted
Exposure
(BAL) Bushfire Attack and Levels of exposures
(AS3959:2018)
Minimal attack from radiant heat and flame due to
the distance of the building from the vegetation,
BAL – Low Insignificant
although some attack by burning debris is possible.
There is insufficient threat to warrant specific
construction requirements
Attack by burning debris is significant with radiant
heat (not greater than 12.5kW/m²). Radiant heat is
BAL - 12.5 0 to 12.5kW/m2 unlikely to threaten building elements (such as
unscreened glass). Specific construction
requirements for ember protection and accumulation
of debris are warranted.
Attack by burning debris is significant with radiant
heat flux (not greater than 19kW/m²) threatening
BAL - 19 12.5 to 19kW/m2
some building elements (such as screened glass).
Specific construction requirements for embers and
radiant heat are warranted.
Attack by burning debris is significant and radiant
2 heat flux (not greater than 29kW/m²) threatens
BAL – 29 19 to 29kW/m
building integrity. Specific construction requirements
for ember and higher levels of radiant heat are
warranted. Some flame contact is possible.
BAL – 40 29 to 40kW/m2 Radiant heat flux and potential flame contact could
threaten building integrity.
40kW/m2 plus Significant radiant heat and significantly higher
BAL - FZ likelihood of flame contact from the fire front will
(Flame Contact) threaten building integrity and result in significant
risk to residents.
Table 1: AS3959:2018 Using BAL to determine construction requirements
3.4 Noosa Shire Council Planning Scheme
The Bushfire Hazard Overlay, under the Council’s Planning Scheme reflects SPP
State and Local level interests by identifying designated bushfire prone areas. Where
assessable development is proposed on land mapped as containing bushfire hazard
areas, a site-specific bushfire hazard assessment prepared in accordance with the
planning scheme is required.
Max Bushfire Protection Consulting 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.