Original source · versioned page text
Appendix F - Bushfire Hazard Assessment and Managment Report
Bushfire Report
Figure 1-1: Subject Site
1.4 Bushfire Prone Land
The Council's designation of land as "bushfire prone" carries two primary
consequences:
• It mandates the formulation of a Bushfire Management Plan that conforms to
the specifications delineated in the Planning Scheme. This includes strict
adherence to the Bushfire Overlay Code stipulated within the planning
scheme.
• It activates the application of the Building Code of Australia (BCA) and the
National Construction Code (NCC), necessitating compliance with their
performance objectives pertaining to bushfire mitigation. Furthermore,
adherence to AS 3959:2018, which governs the construction of buildings in
bushfire-prone regions, is imperative.
1.5 Scope and objectives
The scope and objectives of this assessment are to:
• Identify bushfire-related risk factors linked to the positioning of the
development footprint. This includes the probable direction of bushfire attack,
hazard ratings associated with existing and proposed vegetation on and
around the subject site, and planning separation from potential hazards.
• Recommend suitable protective measures to alleviate the risk posed by the
assessed BAL in alignment with the State Planning Policy (SPP 2017), AS
Max Bushfire Protection Consulting 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.